Contractor dossier
34 projects on file, including joint ventures this contractor is part of.
Total projects
34
Total budget
₱387.1M
Average progress
71.4%
Completion rate
20.6%
Below 70%
Average risk score
65.6
High risk on average, out of 100
Flagged as unusual
5
14.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 34 | ₱387.1M | 65.6 | 5 | 71.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 22 | ₱276.3M | 64.1 | 1 | 83.6% |
| Flood Control and Drainage | 6 | ₱51.8M | 72.1 | 3 | 50.9% |
| Buildings and Facilities | 4 | ₱15.4M | 58.9 | 0 | 42.5% |
| OTHER | 1 | ₱5.8M | 84.2 | 1 | 26.4% |
| Bridges | 1 | ₱37.8M | 68.6 | 0 | 87.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AA0415CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN VIRBIRA-ANGSET ELEMENTARY SCHOOL, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱5.8M | 26% | High risk84 | Flagged0.068 |
| 25AA0231CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY BARBAQUESO, CARASI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 68% | High risk81 | —-0.012 |
| 25AA0230CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF BUNGAD RD, BARANGAY ANGSET, CARASI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 40% | High risk80 | —-0.002 |
| 25AA0494SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY MALAGGAO, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 35% | High risk79 | Flagged0.008 |
| 24AA0350SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY 8 SAN VICENTE, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.046 |
| 24AA0476SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY 31, TALINGAAN, SITIO UMA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.047 |
| 25AA0587CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 32-A LA PAZ, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 19% | High risk76 | —-0.015 |
| 24AA0407CONCRETING OFBRGY. LATAAG-BACSIL SOUTH FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 74% | High risk76 | Flagged0.023 |
| 25AA0575BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (LEGISLATIVE BUILDING), ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 10% | High risk76 | —-0.008 |
| 25AA0051FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER TRIBUTARY, CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 0% | High risk74 | Flagged0.018 |
| 20AA0361CONCRETING OF BRGY. 47 BENGCAG FARM-TO-MARKET ROAD, BRGY. 47 BENGCAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.9M | 100% | High risk73 | —-0.032 |
| 24AA0188BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARBARIT ROAD, BARANGAY ANGSET, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 11% | High risk71 | —-0.015 |
| 23AA0219SIPAG-ACCESS RDS AND/OR BRID.FROM THE NAT RDS LEADITO MAJ/STRAT PUB BLDG/FAC-REHAB OF BUNGAO ANGSET | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 94% | High risk71 | —-0.034 |
| 23AA0217SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BARBAQUESO TO BARANGAY ANGSET, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 93% | High risk70 | —-0.034 |
| 23AA0220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -REHABILITATION OF TARA-TARA ROAD AT BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 69% | High risk70 | —-0.025 |
| 23AA0218SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BARBARIT ROAD, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 97% | High risk70 | —-0.036 |
| 24AA0251BIP- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TARA-TARA ROAD AT BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 75% | High risk70 | —-0.036 |
| 24AA0150SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARBARIT ROAD, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE, PHASE II | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 83% | High risk70 | —-0.038 |
| 24AA0219BIP - ACCESSROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES -IMPROVEMENT OF ROAD, BARANGAY POBLACION 1, ADAMS,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 87% | High risk70 | —-0.039 |
| 23AA0299SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES- REHABILITATION OF SLOPE PROTECTION AT CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 16% | High risk70 | Flagged0.007 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AA0415CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN VIRBIRA-ANGSET ELEMENTARY SCHOOL, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱5.8M | 26% | High risk84 | Flagged0.068 |
| 24AA0407CONCRETING OFBRGY. LATAAG-BACSIL SOUTH FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 74% | High risk76 | Flagged0.023 |
| 25AA0051FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER TRIBUTARY, CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 0% | High risk74 | Flagged0.018 |
| 25AA0494SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY MALAGGAO, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 35% | High risk79 | Flagged0.008 |
| 23AA0299SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES- REHABILITATION OF SLOPE PROTECTION AT CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 16% | High risk70 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24AA0415CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN VIRBIRA-ANGSET ELEMENTARY SCHOOL, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱5.8M | 26% | High risk84 | Flagged0.068 |
| 2 | 25AA0231CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY BARBAQUESO, CARASI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 68% | High risk81 | —-0.012 |
| 3 | 25AA0230CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF BUNGAD RD, BARANGAY ANGSET, CARASI, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 40% | High risk80 | —-0.002 |
| 4 | 25AA0494SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY MALAGGAO, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 35% | High risk79 | Flagged0.008 |
| 5 | 24AA0350SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY 8 SAN VICENTE, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.046 |
| 6 | 24AA0476SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY 31, TALINGAAN, SITIO UMA, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk77 | —-0.047 |
| 7 | 25AA0587CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES -REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 32-A LA PAZ, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 19% | High risk76 | —-0.015 |
| 8 | 24AA0407CONCRETING OFBRGY. LATAAG-BACSIL SOUTH FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 74% | High risk76 | Flagged0.023 |
| 9 | 25AA0575BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (LEGISLATIVE BUILDING), ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 10% | High risk76 | —-0.008 |
| 10 | 25AA0051FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PADSAN RIVER TRIBUTARY, CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 0% | High risk74 | Flagged0.018 |
| 11 | 20AA0361CONCRETING OF BRGY. 47 BENGCAG FARM-TO-MARKET ROAD, BRGY. 47 BENGCAG, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.9M | 100% | High risk73 | —-0.032 |
| 12 | 24AA0188BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARBARIT ROAD, BARANGAY ANGSET, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 11% | High risk71 | —-0.015 |
| 13 | 23AA0219SIPAG-ACCESS RDS AND/OR BRID.FROM THE NAT RDS LEADITO MAJ/STRAT PUB BLDG/FAC-REHAB OF BUNGAO ANGSET | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 94% | High risk71 | —-0.034 |
| 14 | 23AA0217SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY BARBAQUESO TO BARANGAY ANGSET, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 93% | High risk70 | —-0.034 |
| 15 | 23AA0220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -REHABILITATION OF TARA-TARA ROAD AT BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 69% | High risk70 | —-0.025 |
| 16 | 23AA0218SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BARBARIT ROAD, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 97% | High risk70 | —-0.036 |
| 17 | 24AA0251BIP- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TARA-TARA ROAD AT BARANGAY VIRBIRA, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.5M | 75% | High risk70 | —-0.036 |
| 18 | 24AA0150SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BARBARIT ROAD, BARANGAY VIRBIRA, CARASI, ILOCOS NORTE, PHASE II | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 83% | High risk70 | —-0.038 |
| 19 | 24AA0219BIP - ACCESSROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES -IMPROVEMENT OF ROAD, BARANGAY POBLACION 1, ADAMS,ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.6M | 87% | High risk70 | —-0.039 |
| 20 | 23AA0299SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES- REHABILITATION OF SLOPE PROTECTION AT CURA RIVER, CARASI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 16% | High risk70 | Flagged0.007 |
| 21 | 24AA0203SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAGGAO, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 99% | High risk70 | —-0.029 |
| 22 | 25AA0469SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAGGAO, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk70 | —-0.039 |
| 23 | 23AA0236SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF POROTAN-CABACAN ROAD, BRGY. POBLACION 3, ADAMS, ILOCOS | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 94% | High risk70 | —-0.034 |
| 24 | 23AA0161CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SLOPE PROTECTION, BARANGAY 1-3, ADAMS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 56% | High risk70 | —-0.006 |
| 25 | 22AA0177REPAIR/REHABILITATION OF ROADS WITH SLOPE PROTECTION ALONG ADAMS, ILOCOS NORTE STATION IV | Region I | Ilocos Norte 1st DEO | Completed | ₱46.9M | 100% | High risk70 | —-0.079 |