Contractor dossier
278 projects on file, including joint ventures this contractor is part of.
Total projects
278
Total budget
₱20B
Average progress
95.2%
Completion rate
80.6%
Average risk score
47.5
Medium risk on average, out of 100
Flagged as unusual
30
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 140 | ₱9.7B | 54.6 | 19 | 91.7% |
| Region XII | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| Region I | 6 | ₱344.4M | 51.0 | 0 | 100.0% |
| Region VI | 2 | ₱218.5M | 65.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱142.9M | 54.8 | 0 | 100.0% |
| Region X | 1 | ₱56.9M | 51.9 | 0 | 100.0% |
| Region XIII | 1 | ₱49M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 106 | ₱8.1B | 45.9 | 4 | 94.9% |
| Flood Control and Drainage | 84 | ₱5.6B | 46.5 | 1 | 98.9% |
| Bridges | 38 | ₱2.3B | 41.9 | 4 | 97.3% |
| OTHER | 15 | ₱1.6B | 73.1 | 8 | 95.8% |
| Buildings and Facilities | 12 | ₱46.1M | 7.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 6 | ₱731.8M | 94.2 | 6 | 67.7% |
| Water Provision and Storage | 6 | ₱277.5M | 35.5 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱717.2M | 61.3 | 2 | 83.7% |
| GAA 2025 SSP | 3 | ₱387.8M | 95.7 | 3 | 39.4% |
| GAA 2025 OO-2 | 3 | ₱286.8M | 92.5 | 2 | 72.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25L00130PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECT) - K1560+746-K1561+686, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 90% | High risk94 | Flagged0.009 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LD0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALUTAKAY RIVER, BALUTAKAY BRIDGE TO PUROK 3 DOWNSTREAM SECTION, BARANGAY BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.8M | 96% | High risk93 | —-0.007 |
| 25MF0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - DOWNSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 56% | High risk92 | Flagged0.007 |
| 25MF0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - UPSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 66% | High risk92 | Flagged0.006 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 18LC0035REHABILITATION OF PUROK 3, BRGY. BUSAON-PUROK 6, BRGY. LIBUGANON ROAD, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.3M | 100% | High risk77 | —-0.020 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 20M00026CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI MALUNGON ROAD, PARALLEL BRIDGE, MALUNGON, SARANGANI BRIDGE I COMPONENT- STA. 88+997-STA. 89+257 BRRIGE COMPONENT- STA. 88+997-STA. 89+257 BRIDGE II COMPONENT STA. 93+898-STA.94+128 | Region XII | Region XII | Completed | ₱84.2M | 100% | High risk76 | —-0.018 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 21L00100CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱312.4M | 32% | High risk68 | Flagged0.043 |
| 20LB0310REPLACEMENT OF MATINA APLAYA BRIDGE 3, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱122.3M | 48% | High risk63 | Flagged0.031 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
| 22L00014ROAD WIDENING - JCT. DAVAO - COTABATO ROAD (MATINA CROSSING SECTION) - MATINA APLAYA ROAD - JCT. TULIP DRIVE (DAVAO - COTABATO ROAD) - ECOLAND DRIVE - JCT. ABS CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱4.8M | 100% | High risk72 | Flagged0.024 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00018CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, K0000+000.000 - K0000+900.000,K0001+000.000 - K0002+160.000, K0002+220.000 - K0004+945.6, K0001+354.039 - K0002+160.000, K0002+220.00 - K0003+540.000, PACKAGE D, LUTAYAN, SULT | Region XII | Region XII | On-Going | ₱145.3M | 100% | High risk74 | Flagged0.018 |
| 21LB0286CONSTRUCTION (COMPLETION) OF ASICO BRIDGE (ASICO VILLAGE) MATINA PANGI, DAVAO (PHASE 2) | Region XI | Davao City DEO | On-Going | ₱39.2M | 48% | Medium risk48 | Flagged0.011 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 20L00138RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAVAO-COTABATO RD. (MATINA CROSSING SECTION)-MATINA APLAYA RD.-JCT. TULIP DRIVE (DAVAO-COTABATO RD.)-ECOLAND DRIVE-JCT. ABC-CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), (PHASE 1) DAVAO CITY | Region XI | Region XI | On-Going | ₱187.8M | 94% | High risk66 | Flagged0.011 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 24M00230ASPHALT OVERLAY - GENERAL SANTOS CITY-T'BOLI-SURALLAH ROAD - K1697+000 - K1694+500, T'BOLI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱48.2M | 100% | Low risk30 | —-0.083 |
| 227 | 25M00124PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD -K1650+721 - K1651+352 DATU PAGLAS, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱40.9M | 97% | Low risk28 | —-0.055 |
| 228 | 23M00116PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION - K1648 + 097 - K1648 + 702, DATU PAGLAS, MAGUINDANAO | Region XII | Region XII | Completed | ₱43.5M | 100% | Low risk28 | —-0.087 |
| 229 | 23MG0036CLUSTER VIII-A.CONSTRUCTION OF POTABLE WATER SYSTEM AT SITIO SIOK, BARANGAY MABINI, KORONADAL CITY, SOUTH COTABATO B.CONSTRUCTION OF WATER SYSTEM AT BARANGAY BARRIO 9, BANGA, SOUTH COTABATO C.CONSTRUCTION OF WATER SYSTEM AT BARANGAY PUTI, NORALA, SOUTH CO | Region XII | South Cotabato 2nd DEO | Completed | ₱39.9M | 100% | Low risk27 | —-0.047 |
| 230 | 23MG0035CLUSTER VII-A.CONSTRUCTION OF POTABLE WATER SUPPLY LEVEL II AT SITIO BATOTITIK, SITIO LUSOK AND SITIO LUBIYA, BARANGAY BASAG, T'BOLI, SOUTH COTABATO B.CONSTRUCTION OF WATER SYSTEM AT BARANGAY DESAWO, T'BOLI, SOUTH COTABATO C.CONSTRUCTION OF WATER SYSTEM A | Region XII | South Cotabato 2nd DEO | Completed | ₱37M | 100% | Low risk27 | —-0.043 |
| 231 | 23MG0003CLUSTER III-A.CONSTRUCTION OF WATER SYSTEM AT PUROK 1, BARANGAY LIWANAY, BANGA, SOUTH COTABATO B.CONSTRUCTION OF WATER SYSTEM AT SITIO LEMFENEK, BARANGAY NED, LAKE SEBU, SOUTH COTABATO C.CONSTRUCTION OF WATER SYSTEM AT BARANGAY LAMBANGAN, T'BOLI, SOUTH CO | Region XII | South Cotabato 2nd DEO | Completed | ₱34M | 100% | Low risk27 | —-0.049 |
| 232 | 20M00071CONSTRUCTION OF NEW BRIDGES - ALLAH BR. 2 (PARALLEL BRIDGE) ALONG MARBEL- ALLAH VALLEY-COTABATO ROAD (PHASE II), BRIDGE - K1773+037-K1773+187 APPROACHES: K1772+850-K1773+037, K1773+187-K1773+340, ESPERANZA, | Region XII | Region XII | Completed | ₱48.2M | 100% | Low risk27 | —-0.053 |
| 233 | 24M00174CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - COTABATO-MARBEL RD - K1742 + 500 - K1743 + 000, STO. NINO, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱23.7M | 88% | Low risk27 | —-0.048 |
| 234 | 22MF0031CONSTRUCTION OF ROAD JUNCTION PROVINCIAL ROAD TO PUROK SAN GREGORIO, BARANGAY BLINGKONG, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱19.6M | 100% | Low risk26 | —-0.088 |
| 235 | 24M00191CONSTRUCTION OF ROAD FROM JCT. PROVINCIAL ROAD TO PUROK RIVERSIDE, STA. 0+000 - STA. 0+214.6, STA. 0+222 - STA. 0+278, BARANGAY CACUB AND BARANGAY TOPLAND, CITY OF KORONADAL, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱4.9M | 100% | Low risk26 | —-0.052 |
| 236 | 25MG0006PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MIDSAYAP-MARBEL RD-K1786+558-K1786+940, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱25.3M | 100% | Low risk26 | —-0.088 |
| 237 | 18MH0055REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, KRAAN BR. 1 (B00402MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱48.1M | 100% | Low risk26 | —-0.046 |
| 238 | 18MG0069CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: JCT. (BEN SIDON)-BACDULONG ROAD LEADING TO LAKE SEBU (LAKE SEBU CIRCUMFERENTIAL ROAD), BRGY. BACDULONG, LAKE SEBU, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱19.3M | 100% | Low risk26 | —-0.089 |
| 239 | 19MD0052CONSTRUCTION OF CONCRETE ROAD ALONG JCT. ASIK-ASIK FALLS TO MIMBALAWAG LEADING TO DADAY FALLS, BARANGAY DADO, ALAMADA, NORTH COTABATO | Region XII | Cotabato 1st DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.089 |
| 240 | 24MG0110CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-LAKE SEBU-MAITUM RD-K1787+100-K1787+260, K1787+340-K1787+380, K1787+440-K1787+640 | Region XII | South Cotabato 2nd DEO | Completed | ₱25.9M | 100% | Low risk26 | —-0.087 |
| 241 | 19MG0157CONSTRUCTION OF CARPENTER HILL BRIDGE AND BRIDGE PROTECTION ALONG KORONADAL-TAMPAKAN ROAD, CARPENTER HILL-SAN ROQUE SECTION, BRGY. CARPENTER HILL, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱48.7M | 100% | Low risk26 | —-0.054 |
| 242 | 22MF0017CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALIP RIVER (LIBERTAD SECTION), COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱36.7M | 100% | Low risk26 | —-0.069 |
| 243 | 19MA0015CONSTRUCTION OF RIVERBANK PROTECTION ALONG RIO GRANDE DE MINDANAO, (KALANGANAN TO BUCANA SECTION, PHASE I), COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱23.8M | 100% | Low risk26 | —-0.072 |
| 244 | 19MA0012CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER (DOWNSTREAM) PHASE V, TAMONTAKA MOTHER, COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱25.6M | 100% | Low risk26 | —-0.077 |
| 245 | 19MA0014CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER (TAMONTAKA 1 TO TAMONTAKA 2 SECTION, PHASE I, COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱23.6M | 100% | Low risk26 | —-0.077 |
| 246 | 24MG0066CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BARANGAY MATAPOL, NORALA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱39.5M | 100% | Low risk25 | —-0.076 |
| 247 | 19MA0013CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG ESTEROS RIVER-DOWNSTREAM, PHASE II, COTABATO CITY | Region XII | Cotabato City DEO | Completed | ₱23.5M | 100% | Low risk25 | —-0.075 |
| 248 | 24M00192CONSTRUCTION OF ROAD, STA.0+000 - STA.0+118, BARANGAY ASSUMPTION, KORONADAL CITY, SOUTH COTABATO | Region XII | Region XII | Completed | ₱4.9M | 100% | Low risk25 | —-0.088 |
| 249 | 24M00193CONSTRUCTION OF ROAD, SITIO UPPER RIVERSIDE, BARANGAY SAN JOSE, BANGA TO BARANGAY NACI, STA.0+000 - STA.0+267, SURALLAH, SOUTH COTABATOI | Region XII | Region XII | Completed | ₱4.9M | 100% | Low risk25 | —-0.088 |
| 250 | 20MB0020CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG TINAGACAN - BUAYAN RIVER, BRGY. TINAGACAN, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱39.1M | 100% | Low risk25 | —-0.070 |