Contractor dossier
278 projects on file, including joint ventures this contractor is part of.
Total projects
278
Total budget
₱20B
Average progress
95.2%
Completion rate
80.6%
Average risk score
47.5
Medium risk on average, out of 100
Flagged as unusual
30
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 140 | ₱9.7B | 54.6 | 19 | 91.7% |
| Region XII | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| Region I | 6 | ₱344.4M | 51.0 | 0 | 100.0% |
| Region VI | 2 | ₱218.5M | 65.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱142.9M | 54.8 | 0 | 100.0% |
| Region X | 1 | ₱56.9M | 51.9 | 0 | 100.0% |
| Region XIII | 1 | ₱49M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 106 | ₱8.1B | 45.9 | 4 | 94.9% |
| Flood Control and Drainage | 84 | ₱5.6B | 46.5 | 1 | 98.9% |
| Bridges | 38 | ₱2.3B | 41.9 | 4 | 97.3% |
| OTHER | 15 | ₱1.6B | 73.1 | 8 | 95.8% |
| Buildings and Facilities | 12 | ₱46.1M | 7.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 6 | ₱731.8M | 94.2 | 6 | 67.7% |
| Water Provision and Storage | 6 | ₱277.5M | 35.5 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱717.2M | 61.3 | 2 | 83.7% |
| GAA 2025 SSP | 3 | ₱387.8M | 95.7 | 3 | 39.4% |
| GAA 2025 OO-2 | 3 | ₱286.8M | 92.5 | 2 | 72.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25L00130PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECT) - K1560+746-K1561+686, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 90% | High risk94 | Flagged0.009 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LD0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALUTAKAY RIVER, BALUTAKAY BRIDGE TO PUROK 3 DOWNSTREAM SECTION, BARANGAY BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.8M | 96% | High risk93 | —-0.007 |
| 25MF0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - DOWNSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 56% | High risk92 | Flagged0.007 |
| 25MF0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - UPSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 66% | High risk92 | Flagged0.006 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 18LC0035REHABILITATION OF PUROK 3, BRGY. BUSAON-PUROK 6, BRGY. LIBUGANON ROAD, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.3M | 100% | High risk77 | —-0.020 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 20M00026CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI MALUNGON ROAD, PARALLEL BRIDGE, MALUNGON, SARANGANI BRIDGE I COMPONENT- STA. 88+997-STA. 89+257 BRRIGE COMPONENT- STA. 88+997-STA. 89+257 BRIDGE II COMPONENT STA. 93+898-STA.94+128 | Region XII | Region XII | Completed | ₱84.2M | 100% | High risk76 | —-0.018 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 21L00100CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱312.4M | 32% | High risk68 | Flagged0.043 |
| 20LB0310REPLACEMENT OF MATINA APLAYA BRIDGE 3, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱122.3M | 48% | High risk63 | Flagged0.031 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
| 22L00014ROAD WIDENING - JCT. DAVAO - COTABATO ROAD (MATINA CROSSING SECTION) - MATINA APLAYA ROAD - JCT. TULIP DRIVE (DAVAO - COTABATO ROAD) - ECOLAND DRIVE - JCT. ABS CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱4.8M | 100% | High risk72 | Flagged0.024 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00018CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, K0000+000.000 - K0000+900.000,K0001+000.000 - K0002+160.000, K0002+220.000 - K0004+945.6, K0001+354.039 - K0002+160.000, K0002+220.00 - K0003+540.000, PACKAGE D, LUTAYAN, SULT | Region XII | Region XII | On-Going | ₱145.3M | 100% | High risk74 | Flagged0.018 |
| 21LB0286CONSTRUCTION (COMPLETION) OF ASICO BRIDGE (ASICO VILLAGE) MATINA PANGI, DAVAO (PHASE 2) | Region XI | Davao City DEO | On-Going | ₱39.2M | 48% | Medium risk48 | Flagged0.011 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 20L00138RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAVAO-COTABATO RD. (MATINA CROSSING SECTION)-MATINA APLAYA RD.-JCT. TULIP DRIVE (DAVAO-COTABATO RD.)-ECOLAND DRIVE-JCT. ABC-CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), (PHASE 1) DAVAO CITY | Region XI | Region XI | On-Going | ₱187.8M | 94% | High risk66 | Flagged0.011 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20LB0084CONSTRUCTION OF DRAINAGE STRUCTURE, DAVAO CITY DIV RD - K1501+860, LA VERNA SECTION, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱74.6M | 100% | Medium risk51 | —-0.052 |
| 102 | 23M002311. CONSTRUCTION OF RIVER BANK PROTECTION ALONG MARBEL RIVER, STA. 0+000-STA 0+200 R/S, STA 0+200 -STA 0+498 L/S (DOWNSTREAM), BRGY. NAMNAMA, CITY OF KORONADAL, SOUTH COTABATO; 2.CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA 0+000-STA 0+562, | Region XII | Region XII | Completed | ₱310.2M | 100% | Medium risk51 | —-0.038 |
| 103 | 23M00044CONSTRUCTION OF COASTAL DIKE IN GLAN, MALAPATAN, ALABEL, MAASIM, KIAMBA AND MAITUM, STA. 0+000 - STA. 0+865.136, SARANGANI | Region XII | Region XII | On-Going | ₱115.8M | 100% | Medium risk51 | —-0.018 |
| 104 | 17M00038WIDENING OF SINAWAL BRIDGE (B01020MN) ALONG MAKAR-MARBEL ROAD, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | Completed | ₱92.7M | 100% | Medium risk51 | Flagged0.003 |
| 105 | 22A00156WIDENING OF PERMANENT BRIDGES - BAUANG BR. 2 (PARALLEL BR.) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱55M | 100% | Medium risk51 | —-0.044 |
| 106 | 20LB0200CONSTRUCTION OF ASICO BRIDGE (ASICO VILLAGE), MATINA PANGI, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.035 |
| 107 | 21LA0128ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG MONTEVISTA - COMPOSTELA - MATI BDRY RD (S00135MN), DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.079 |
| 108 | 21A00226CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF ROAD, BARANGAY CARUNOAN WEST AND EAST, ROSARIO, LA UNION | Region I | Region I | Completed | ₱67.5M | 100% | Medium risk50 | —-0.082 |
| 109 | 20LB0292CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 3+585 TO STA. 3+705, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29M | 100% | Medium risk50 | —-0.030 |
| 110 | 19LF0096CONSTRUCTION OF ROAD FROM YAPSAY, TAYTAYAN TO SITIO PATONG, TAYTAYAN, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.075 |
| 111 | 17LB0036CONST. OF GABION REVETMENT/RIVER TRAINING PROTECTING PANACAN BRIDGE ALONG DAANG MAHARLIKA (MN) STA. | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk50 | —-0.047 |
| 112 | 21LB0118DRAINAGE SYSTEM LEADING TO DACUDAO MAINDRAIN, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱56.6M | 100% | Medium risk50 | —-0.061 |
| 113 | 18LB0041CONSTRUCTION OF RIVERBANK PROTECTION & INSTALLATION OF GABIONS AND MATTRESSES ALONG TALOMO RIVER, TALOMO, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱62.7M | 100% | Medium risk50 | —-0.073 |
| 114 | 20LB0037CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 2+790 TO STA. 3+141, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱60.3M | 100% | Medium risk50 | —-0.061 |
| 115 | 20LA0029CONSTRUCTION OF REVETMENT ALONG MANAT RIVER, BRGY. MAINIT, NABUNTURAN COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱57.9M | 100% | Medium risk50 | —-0.066 |
| 116 | 20LA0176CONSTRUCTION OF REVETMENT ALONG MAWAB RIVER PHASE II, BRGY. POBLACION, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱59.4M | 100% | Medium risk50 | —-0.069 |
| 117 | 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 118 | 19M00030: PAVING OF UNPAVED ROADS- SNA-LEBAK-KALAMANSIG RD- K1877+058-K1879+070, K1879+769-K1880+145, KALAMANSIG, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.8M | 100% | Medium risk49 | —-0.063 |
| 119 | 21LF0093CONSTRUCTION OF WATER SUPPLY SYSTEM, BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.031 |
| 120 | 21LF0100CONSTRUCTION OF BAGANGA POTABLE WATER SYSTEM, BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.036 |
| 121 | 23MF0042CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUAYAN RIVER (SAMPAO SECTION), LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱97.7M | 100% | Medium risk48 | —-0.062 |
| 122 | 23MF0043CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUAYAN RIVER (MAINDANG SECTION), LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱97.7M | 100% | Medium risk48 | —-0.063 |
| 123 | 23L00020CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱46.5M | 0% | Medium risk48 | —-0.010 |
| 124 | 21LB0286CONSTRUCTION (COMPLETION) OF ASICO BRIDGE (ASICO VILLAGE) MATINA PANGI, DAVAO (PHASE 2) | Region XI | Davao City DEO | On-Going | ₱39.2M | 48% | Medium risk48 | Flagged0.011 |
| 125 | 20LC0046NANAGA PARALLEL BR. 1-A ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.055 |