Contractor dossier
278 projects on file, including joint ventures this contractor is part of.
Total projects
278
Total budget
₱20B
Average progress
95.2%
Completion rate
80.6%
Average risk score
47.5
Medium risk on average, out of 100
Flagged as unusual
30
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 140 | ₱9.7B | 54.6 | 19 | 91.7% |
| Region XII | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| Region I | 6 | ₱344.4M | 51.0 | 0 | 100.0% |
| Region VI | 2 | ₱218.5M | 65.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱142.9M | 54.8 | 0 | 100.0% |
| Region X | 1 | ₱56.9M | 51.9 | 0 | 100.0% |
| Region XIII | 1 | ₱49M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 106 | ₱8.1B | 45.9 | 4 | 94.9% |
| Flood Control and Drainage | 84 | ₱5.6B | 46.5 | 1 | 98.9% |
| Bridges | 38 | ₱2.3B | 41.9 | 4 | 97.3% |
| OTHER | 15 | ₱1.6B | 73.1 | 8 | 95.8% |
| Buildings and Facilities | 12 | ₱46.1M | 7.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 6 | ₱731.8M | 94.2 | 6 | 67.7% |
| Water Provision and Storage | 6 | ₱277.5M | 35.5 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱717.2M | 61.3 | 2 | 83.7% |
| GAA 2025 SSP | 3 | ₱387.8M | 95.7 | 3 | 39.4% |
| GAA 2025 OO-2 | 3 | ₱286.8M | 92.5 | 2 | 72.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25L00130PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECT) - K1560+746-K1561+686, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 90% | High risk94 | Flagged0.009 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LD0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALUTAKAY RIVER, BALUTAKAY BRIDGE TO PUROK 3 DOWNSTREAM SECTION, BARANGAY BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.8M | 96% | High risk93 | —-0.007 |
| 25MF0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - DOWNSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 56% | High risk92 | Flagged0.007 |
| 25MF0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - UPSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 66% | High risk92 | Flagged0.006 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 18LC0035REHABILITATION OF PUROK 3, BRGY. BUSAON-PUROK 6, BRGY. LIBUGANON ROAD, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.3M | 100% | High risk77 | —-0.020 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 20M00026CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI MALUNGON ROAD, PARALLEL BRIDGE, MALUNGON, SARANGANI BRIDGE I COMPONENT- STA. 88+997-STA. 89+257 BRRIGE COMPONENT- STA. 88+997-STA. 89+257 BRIDGE II COMPONENT STA. 93+898-STA.94+128 | Region XII | Region XII | Completed | ₱84.2M | 100% | High risk76 | —-0.018 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 21L00100CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱312.4M | 32% | High risk68 | Flagged0.043 |
| 20LB0310REPLACEMENT OF MATINA APLAYA BRIDGE 3, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱122.3M | 48% | High risk63 | Flagged0.031 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
| 22L00014ROAD WIDENING - JCT. DAVAO - COTABATO ROAD (MATINA CROSSING SECTION) - MATINA APLAYA ROAD - JCT. TULIP DRIVE (DAVAO - COTABATO ROAD) - ECOLAND DRIVE - JCT. ABS CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱4.8M | 100% | High risk72 | Flagged0.024 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00018CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, K0000+000.000 - K0000+900.000,K0001+000.000 - K0002+160.000, K0002+220.000 - K0004+945.6, K0001+354.039 - K0002+160.000, K0002+220.00 - K0003+540.000, PACKAGE D, LUTAYAN, SULT | Region XII | Region XII | On-Going | ₱145.3M | 100% | High risk74 | Flagged0.018 |
| 21LB0286CONSTRUCTION (COMPLETION) OF ASICO BRIDGE (ASICO VILLAGE) MATINA PANGI, DAVAO (PHASE 2) | Region XI | Davao City DEO | On-Going | ₱39.2M | 48% | Medium risk48 | Flagged0.011 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 20L00138RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAVAO-COTABATO RD. (MATINA CROSSING SECTION)-MATINA APLAYA RD.-JCT. TULIP DRIVE (DAVAO-COTABATO RD.)-ECOLAND DRIVE-JCT. ABC-CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), (PHASE 1) DAVAO CITY | Region XI | Region XI | On-Going | ₱187.8M | 94% | High risk66 | Flagged0.011 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18M00017CONSTRUCTION OF CONCRETE ROAD TUPI-SARANGANI ROAD (MALANDAG-MIASONG ROAD, PACKAGE A, MALANDAG, SARANGANI | Region XII | Region XII | Completed | ₱144.7M | 100% | Medium risk45 | —-0.033 |
| 177 | 18MB0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PUROK 3A, POBLACION - LOTE, LINAN ROAD CONNECTING TO COFFEE AND CACAO PROCESSING AREAS AND TUPI PUBLIC MARKET IN SUPPORT TO AGRIBUSINESS INDUSTRY, TUPI, SOUTH COT. | Region XII | South Cotabato 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.054 |
| 178 | 19M00010CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-BANGA-TUPI-MALUNGON ROAD, (MALUNGON-TUPI SECTION), PACKAGE A, MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱98.2M | 100% | Medium risk45 | —-0.048 |
| 179 | 20LB0252CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, STA. 2+680, STA. 2+687, STA. 2+782, STA. 2+850, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱29M | 100% | Medium risk44 | —-0.009 |
| 180 | 22M00079CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG PALIMBANG-SARANGANI ROAD, K1968+200 - K1968+215, K1971+840 - K1971+860, K1978+530 - K1978+595, K1978+770 - | Region XII | Region XII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.066 |
| 181 | 18M00009PAVING OF UNPAVED ROAD MAITUM-LAKE SEBU ROAD, K1784+180-K1786+425, K1768+352-K1768+507, MAITUM, SARANGANI | Region XII | Region XII | Completed | ₱104.3M | 100% | Medium risk44 | —-0.040 |
| 182 | 23M00060WIDENING OF BRIDGE-LOWER APOPONG BR. (B01885MN) ALONG ALBERT MORROW BLVD., K1653+1414 - K1653+1534, GENERAL SANTOS CITY | Region XII | Region XII | Completed | ₱115.8M | 100% | Medium risk44 | —-0.039 |
| 183 | 20LB0253CONSTRUCTION OF REVETMENT ALONG MATINA RIVER, STA. 4+292 TO STA. 4+480, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱38.6M | 100% | Medium risk44 | —-0.065 |
| 184 | 20LB0170CONSTRUCTION OF REVETMENT ALONG MATINA RIVER, STA. 4+071 TO STA. 4+186, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱26.1M | 100% | Medium risk44 | —-0.065 |
| 185 | 20M00033CONSTRUCTION OF BYPASS/DIVERSION ROADS - BANGA - TUPI - MALUNGON ROAD, (BANGA-TUPI SECTION), PACKAGE D, STA. 27+509-STA 29+009, BANGA,,SOUTH COTABATO. | Region XII | Region XII | Completed | ₱111.4M | 100% | Medium risk44 | —-0.074 |
| 186 | 18LB0031CONST. OF RIVERBANK PROTECTION & INSTALLATION OF GABIONS AND MATTRESSES ALONG MATINA RIVER, MATINA PANGI, DAVAO SAVINGS PORTION,DAVAO CITY | Region XI | Davao City DEO | Completed | ₱17.6M | 100% | Medium risk44 | —-0.077 |
| 187 | 20LB0293CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER RIVER, STA. 2+437 TO STA. 2+557, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29M | 100% | Medium risk44 | —-0.065 |
| 188 | 18LB0070INSTALLATION OF GABIONS AND MATTRESSES ALONG PANACAN RIVER DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.073 |
| 189 | 20LB0175CONSTRUCTION OF REVETMENT ALONG LASANG RIVER, STA. 1+905 TO STA. 2+075, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.073 |
| 190 | 20LB0174CONSTRUCTION OF REVETMENT ALONG LASANG RIVER, STA. 2+075 TO STA. 2+245, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.073 |
| 191 | 20LB0172CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BUNAWAN RIVER, STA. 4+605 TO STA. 5+050, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.073 |
| 192 | 18LF0048CONSTRUCTION OF REVETMENT ON SHEET PILE FOUNDATION, CARAGA RIVER BANK PROTECTION, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱34.2M | 100% | Medium risk44 | —-0.065 |
| 193 | 20LB0239CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG DAVAO RIVER, DAVAO RIVER BRIDGE UPSTREAM SECTION, RIGHT BANK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.076 |
| 194 | 24M00169PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD - K1727 + 818 - K1728 + 418, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱81.5M | 100% | Medium risk44 | —-0.043 |
| 195 | 24M00175ROAD WIDENING - COTABATO-MARBEL RD, K1737+850 - K1738+461, SURALLAH, SOUTH COTABATO | Region XII | Region XII | Completed | ₱19.3M | 100% | Medium risk44 | —-0.054 |
| 196 | 21M00028CONSTRUCTION OF CONCRETE ROAD, JCT. NHW (COTABATO-MARBEL ROAD) - KOLAMBOG - DUMAGUIL BYPASS ROAD, STA. 0+000-STA 4+000, NORALA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱98.4M | 100% | Medium risk44 | —-0.075 |
| 197 | 22M00001ROAD WIDENING DAVAO COTABATO RD (JCT. DIGOS-COTABATO SECT) K1667+200-K1669+000, K1684+800-K1686+800, ALEOSAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱111.9M | 100% | Medium risk43 | —-0.073 |
| 198 | 19M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BANGA-TUPI-MALUNGON ROAD, (MALUNGON-TUPI SECTION),STA. 74.979 TO STA. 77+142, PACKAGE B, MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱95.9M | 100% | Medium risk43 | —-0.071 |
| 199 | 18M00025CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AWANG- UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K1925+058-K1925+148, K1925+226-K1925+272; K1966+350-K1966+368, K1966+400-K1966+416; K1966+700-K1966+714, K1966+900-K1966+914, K1967+500-K1967+508, K196 | Region XII | Region XII | Completed | ₱120.9M | 100% | Medium risk43 | —-0.024 |
| 200 | 18M00030PAVING OF UNPAVED ROADS SNA-LEBAK-KALAMANSIG ROAD K1903+404-K1904+690, K1904+721-K1905+185, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱100.5M | 100% | Medium risk43 | —-0.042 |