Contractor dossier
278 projects on file, including joint ventures this contractor is part of.
Total projects
278
Total budget
₱20B
Average progress
95.2%
Completion rate
80.6%
Average risk score
47.5
Medium risk on average, out of 100
Flagged as unusual
30
10.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 140 | ₱9.7B | 54.6 | 19 | 91.7% |
| Region XII | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| Region I | 6 | ₱344.4M | 51.0 | 0 | 100.0% |
| Region VI | 2 | ₱218.5M | 65.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱142.9M | 54.8 | 0 | 100.0% |
| Region X | 1 | ₱56.9M | 51.9 | 0 | 100.0% |
| Region XIII | 1 | ₱49M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 106 | ₱8.1B | 45.9 | 4 | 94.9% |
| Flood Control and Drainage | 84 | ₱5.6B | 46.5 | 1 | 98.9% |
| Bridges | 38 | ₱2.3B | 41.9 | 4 | 97.3% |
| OTHER | 15 | ₱1.6B | 73.1 | 8 | 95.8% |
| Buildings and Facilities | 12 | ₱46.1M | 7.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 6 | ₱731.8M | 94.2 | 6 | 67.7% |
| Water Provision and Storage | 6 | ₱277.5M | 35.5 | 0 | 100.0% |
| Bridges, Roads | 5 | ₱717.2M | 61.3 | 2 | 83.7% |
| GAA 2025 SSP | 3 | ₱387.8M | 95.7 | 3 | 39.4% |
| GAA 2025 OO-2 | 3 | ₱286.8M | 92.5 | 2 | 72.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 25L00130PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECT) - K1560+746-K1561+686, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 90% | High risk94 | Flagged0.009 |
| 25L00061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD. - K1575 + 425 - K1576 + 900, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.5M | 100% | High risk94 | Flagged0.004 |
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LD0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALUTAKAY RIVER, BALUTAKAY BRIDGE TO PUROK 3 DOWNSTREAM SECTION, BARANGAY BALUTAKAY, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.8M | 96% | High risk93 | —-0.007 |
| 25MF0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - DOWNSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 56% | High risk92 | Flagged0.007 |
| 25MF0012CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DALOL RIVER (TELAFAS SECTION - UPSTREAM),COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱96M | 66% | High risk92 | Flagged0.006 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 18LC0035REHABILITATION OF PUROK 3, BRGY. BUSAON-PUROK 6, BRGY. LIBUGANON ROAD, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱69.3M | 100% | High risk77 | —-0.020 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 20M00026CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI MALUNGON ROAD, PARALLEL BRIDGE, MALUNGON, SARANGANI BRIDGE I COMPONENT- STA. 88+997-STA. 89+257 BRRIGE COMPONENT- STA. 88+997-STA. 89+257 BRIDGE II COMPONENT STA. 93+898-STA.94+128 | Region XII | Region XII | Completed | ₱84.2M | 100% | High risk76 | —-0.018 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00109CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1439+290 - K1439+920, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱225.7M | 6% | High risk94 | Flagged0.060 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
| 21L00100CONSTRUCTION OF CONCRETE ROAD - PANACAN BYPASS ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱312.4M | 32% | High risk68 | Flagged0.043 |
| 20LB0310REPLACEMENT OF MATINA APLAYA BRIDGE 3, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱122.3M | 48% | High risk63 | Flagged0.031 |
| 24M001591. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREAM) STA 0+000-STA 0+452.381, BRGY.STO. NIÑO, KORONADAL CITY, SOUTH COTABATO (PHASE 1);2. CONSTRUCTION OF RIVER BANK SLOPE PROTECTION STRUCTURE ALONG MARBER RIVER (UPSTREA | Region XII | Region XII | On-Going | ₱277.1M | 97% | High risk76 | Flagged0.029 |
| 25M00032REPLACEMENT OF PERMANENT WEAK BRIDGES - BUAYAN BR. (B01041MN) ALONG BUAYAN-GLAN RD, STA 0+277 - STA 0+400, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱131M | 76% | High risk94 | Flagged0.026 |
| 24M00009ROAD WIDENING - DIGOS-MAKAR RD - K1606+007 - K1612+961, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱192.3M | 97% | High risk77 | Flagged0.025 |
| 24M00008ROAD WIDENING - DIGOS-MAKAR RD - K1600+300 - K1601+542, K1602+000 - K1606+007, MALUNGON, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱191.9M | 97% | High risk75 | Flagged0.025 |
| 22L00014ROAD WIDENING - JCT. DAVAO - COTABATO ROAD (MATINA CROSSING SECTION) - MATINA APLAYA ROAD - JCT. TULIP DRIVE (DAVAO - COTABATO ROAD) - ECOLAND DRIVE - JCT. ABS CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱4.8M | 100% | High risk72 | Flagged0.024 |
| 25L00043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS) - K1551 + 695 - K1553+000, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 44% | High risk94 | Flagged0.023 |
| 24L00100PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT DIGOS SECT) - K1534+(-983) - K1534+087, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.5M | 94% | High risk80 | Flagged0.020 |
| 24M00181PAVING OF UNPAVED ROADS - SURALLAH-LAKE SEBU-MAITUM RD, K1783+559 - K1785+469, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱117.5M | 80% | High risk78 | Flagged0.019 |
| 24M00018CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, K0000+000.000 - K0000+900.000,K0001+000.000 - K0002+160.000, K0002+220.000 - K0004+945.6, K0001+354.039 - K0002+160.000, K0002+220.00 - K0003+540.000, PACKAGE D, LUTAYAN, SULT | Region XII | Region XII | On-Going | ₱145.3M | 100% | High risk74 | Flagged0.018 |
| 21LB0286CONSTRUCTION (COMPLETION) OF ASICO BRIDGE (ASICO VILLAGE) MATINA PANGI, DAVAO (PHASE 2) | Region XI | Davao City DEO | On-Going | ₱39.2M | 48% | Medium risk48 | Flagged0.011 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 20L00138RECONSTRUCTION TO CONCRETE PAVEMENT ALONG JCT. DAVAO-COTABATO RD. (MATINA CROSSING SECTION)-MATINA APLAYA RD.-JCT. TULIP DRIVE (DAVAO-COTABATO RD.)-ECOLAND DRIVE-JCT. ABC-CBN QUIMPO BLVD. DIVERSION ROAD (JOHN PAUL SECTION), (PHASE 1) DAVAO CITY | Region XI | Region XI | On-Going | ₱187.8M | 94% | High risk66 | Flagged0.011 |
| 25L00053PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY DIGOS - MAKAR ROAD - K1574+000 - K1575+425, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱94.1M | 90% | High risk94 | Flagged0.010 |
| 24M00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD PACKAGE 1, COLUMBIO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱48M | 72% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 19M00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BANGA TUPI-MALUNGON ROAD, (BANGA-TUPI SECTION), STA. 26+209 TO STA. 27+089, PACKAGE A, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk43 | —-0.071 |
| 202 | 19M00039ROAD UPGRADING (UNPAVED TO PAVED) SURALLAH-LAKE SEBU-MAITUM ROAD BETWEEN KOLONBONG BRIDGE AND DATAL LAWA BRIDGE, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | Completed | ₱105.6M | 100% | Medium risk42 | —-0.073 |
| 203 | 18M00057PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 10424 CHAINAGE 14969, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | Completed | ₱192.6M | 100% | Medium risk42 | —-0.020 |
| 204 | 18M00059PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 3100 CHAINAGE 5340, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | Completed | ₱193M | 100% | Medium risk42 | —-0.020 |
| 205 | 21M00046CONSTRUCTION OF BYPASS AND DIVERSION ROADS - BANGA - TUPI MALUNGON ROAD, (BANGA-TUPI SECTION), PACKAGE E, STA. 0+900 - STA. 1+611.849, STA. 1+616.849 - STA. 4+850.350 BRGY. LIWANAY, BANGA, SOUTH | Region XII | Region XII | Completed | ₱94.1M | 100% | Medium risk42 | —-0.075 |
| 206 | 18M00058PAVING OF UNPAVED ROADS SURALLAH LAKE SEBU MAITUM ROAD, CHAINAGE 840 CHAINAGE 3100, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | Completed | ₱192.9M | 100% | Medium risk42 | —-0.020 |
| 207 | 21M00031CONSTRUCTION OF CONCRETE ROAD - SUBEN -MANGELEN-MANGILALA-ESTRELLA-PANANGGILAN ROAD IN SUPPORT OF FISHING AND ALLIED INDUSTRIES IN LAKE BULUAN (LUTAYAN PORTION) EXTENDING SUPPORT TO MUSCOVADO | Region XII | Region XII | Completed | ₱97.3M | 100% | Medium risk42 | —-0.071 |
| 208 | 23M00061WIDENING OF BRIDGE - UPPER SILWAY BR. (B01886MN) ALONG ALBERT MORROW BLVD, K1653+661 - K1653+841, GENERAL SANTOS CITY | Region XII | Region XII | Completed | ₱96.5M | 100% | Medium risk41 | —-0.040 |
| 209 | 19MF0030CONSTRUCTION OF NEW PERMANENT BRIDGE ALLAH BRIDEG 2 (PARALLEL BRIDGE) ALONG MARBEL - ALLAH VALLEY COTABATO ROAD, ISULAN, SULTAN KUDARAT. | Region XII | Region XII | Completed | ₱95.9M | 100% | Medium risk40 | —-0.039 |
| 210 | 20NH0060CONSTRUCTION OF SEAWALL, BRGY. CONSUELO, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.067 |
| 211 | 20M00076ROAD WIDENING INCLUDING DRAINAGE ALONG SARANGANI- SULTAN KUDARAT COASTAL RD, K1701+420 - K1701+540, K1702+720-K1706+922.35, MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱99M | 100% | Medium risk39 | —-0.070 |
| 212 | 18MA0105CONSTRUCTION OF NITUAN 2 BRIDGE WITH ROW, PARANG, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱28.1M | 100% | Medium risk38 | —-0.036 |
| 213 | 19ME0099ROAD WIDENING ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1726+500-K1727+649, K1727+692-K1730+000; KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱96.5M | 100% | Medium risk38 | —-0.065 |
| 214 | 19ME0098ROAD WIDENING ALONG SSKCR, K1717+541.00-K1718+061.67, K1720+758-K1723+431, K1723+462-K1724+337.77; KIAMBA, SAR. PROV. | Region XII | Sarangani DEO | Completed | ₱96.5M | 100% | Medium risk38 | —-0.067 |
| 215 | 20M00077ROAD WIDENING INCLUDING DRAINAGE ALONG SARANGANI- SULTAN KUDARAT COASTAL RD, K1685+000 - K1685+900, K1686+381-1690+053, MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱92.8M | 100% | Medium risk38 | —-0.059 |
| 216 | 21M00068CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) AT ESTEROS RIVER - UPSTREAM PHASE II, STA. 0+000-STA. 0+378, COTABATO CITY | Region XII | Region XII | Completed | ₱67.5M | 100% | Medium risk37 | —-0.073 |
| 217 | 23M00074CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, DUMAGUIL BRIDGE SECTION, STA. 0+000 STA. 0+445, BARANGAY DUMAGUIL, NORALA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱67.5M | 100% | Medium risk37 | —-0.070 |
| 218 | 22MG0013CONSTRUCTION OF RIVERBANK PROTECTION ALONG MARBEL RIVER, BRGY. SAN ROQUE, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱70.9M | 100% | Medium risk37 | —-0.067 |
| 219 | 19M00001REHABILITATION OF UPPER SILWAY BRIDGE (B01886MN) ALONG ALBERT MORROW BLVD, GENERAL SANTOS CITY, STA. 1653+531 STA. 1653+711 | Region XII | Region XII | Completed | ₱90.1M | 100% | Medium risk35 | —-0.039 |
| 220 | 24MB0060PREVENTIVE MAINTENANCE - SECONDARY ROADS - ALBERT MORROW BLVD - K1659 + (-600) - K1659 + 280; K1659+280-K1659+345 | Region XII | South Cotabato 1st DEO | Completed | ₱83.4M | 100% | Medium risk35 | —-0.075 |
| 221 | 23M00115PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION ROAD - K1646 + 475 - K1647 + 434, DATU PAGLAS, MAGUINDANAO | Region XII | Region XII | Completed | ₱67.6M | 100% | Medium risk35 | —-0.084 |
| 222 | 23MG0066CLUSTER XII-A.CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY MAAN, T'BOLI, SOUTH COTABATO B.CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY TALUFO, T'BOLI, SOUTH COTABATO C.CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LAMBINGI, BANGA, SOUTH COTABATO D.CONSTRUC | Region XII | South Cotabato 2nd DEO | Completed | ₱68.5M | 100% | Medium risk35 | —-0.040 |
| 223 | 19M00041CONSTRUCTION OF NEW BRIDGES-PAGALUNGAN PARALELL BRIDGE ALONG DAVAO-COTABATO ROAD (JCT. DIGOS-COTABATO SECTION) (PHASE II), K1666+582-K1666+702, K1666+952-K1667+067 BRIDGE K1666+702 - K1666+952 | Region XII | Region XII | Completed | ₱63.6M | 100% | Medium risk31 | —-0.041 |
| 224 | 22MD0084CONSTRUCTION OF BRIDGE AT POLAYAGAN TO MAPUROK, ALAMADA, NORTH COTABATO | Region XII | Region XII | Completed | ₱86.8M | 100% | Medium risk31 | —-0.046 |
| 225 | 24M00229ASPHALT OVERLAY - GENERAL SANTOS CITY-T'BOLI-SURALLAH ROAD - K1694+500 - K1692+000, T'BOLI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱48.2M | 100% | Low risk30 | —-0.083 |