Opening the dossier…
Opening the dossier…
Contractor dossier
8 projects on file, including joint ventures this contractor is part of.
Total projects
8
Total budget
₱120.2M
Average progress
99.0%
Completion rate
75.0%
Average risk score
47.7
Medium risk on average, out of 100
Flagged as unusual
1
12.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 8 | ₱120.2M | 47.7 | 1 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 4 | ₱32.6M | 40.8 | 0 | 98.0% |
| Flood Control and Drainage | 2 | ₱57.9M | 46.3 | 0 | 100.0% |
| OTHER | 1 | ₱14.9M | 78.6 | 1 | 100.0% |
| Roads | 1 | ₱14.9M | 46.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24LD0184CONCRETING OF BRGY. BALABAG FMR, BRGY. BALABAG, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.021 |
| 2 | 25LD0135CONSTRUCTION OF MPB, 39TH IB, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱19.2M | 92% | Medium risk49 | —-0.051 |
| 3 | 24LD0113CONSTRUCTION OF MULTI-PURPOSE BUILDING (TOURISM OFFICE), BARANGAY ASBANG, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.091 |
| 4 | 24LD0160CONSTRUCTION OF MULTIPURPOSE BUILDING (DAVAO DEL SUR COLLEGE (DSSC) AT DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.091 |
| 5 | 22LD0102REHABILITATION OF CONCRETE REVETMENT ALONG MALALAG RIVER, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱48.3M | 100% | Medium risk47 | —-0.076 |
| 6 | 23LD0023CONSTRUCTION OF ROAD AT SITIO PALAYAN AND SITIO BAGUMBUHAY, BARANGAY IGPIT, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.090 |
| 7 | 25LD0043CONSTRUCTION OF PROTECTION DIKE, MAL RIVER IRRIGATION SYSTEM, LEFT AND RIGHT BANK, UPSTREAM AND DOWNSTREAM, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱9.6M | 100% | Medium risk46 | —-0.044 |
| 8 | 24LD0140CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BURI AND BARANGAY MANGA, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱3.5M | 100% | Low risk19 | —-0.090 |