Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱70.1M
Average progress
60.8%
Completion rate
50.0%
Below 70%
Average risk score
59.3
Medium risk on average, out of 100
Flagged as unusual
1
25.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 4 | ₱70.1M | 59.3 | 1 | 60.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 3 | ₱60.5M | 47.5 | 0 | 71.2% |
| GAA 2025 SSP | 1 | ₱9.6M | 94.6 | 1 | 29.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25A00531BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF LIGA NG BARANGAY MULTI - PURPOSE BUILDING, BARANGAY POBLACION, MANAOAG, PANGASINAN | Region I | Region I | On-Going | ₱9.6M | 30% | High risk95 | Flagged0.030 |
| 2 | 25A00530BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI PURPOSE BUILDING WITH SITE DEVELOPMENT, POBLACION, MANAOAG, PANGASINAN | Region I | Region I | On-Going | ₱19.2M | 14% | Medium risk53 | —-0.018 |
| 3 | 18AH0266CONSTRUCTION OF TWO(2)UNITS-THREE(3)STOREY,SIX(6)CL/SB AT BAGUINAY NATIONAL HS,MANAOAG,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱29.2M | 100% | Medium risk46 | —-0.035 |
| 4 | 18AH0256CONSTRUCTION OF TWO(2)STOREY,SIX(6)CL/SB AT SIPITAN ELEM.SCHOOL, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱12.1M | 100% | Medium risk44 | —-0.042 |