Contractor dossier
33 projects on file, including joint ventures this contractor is part of.
Total projects
33
Total budget
₱1.5B
Average progress
80.3%
Completion rate
36.4%
Below 70%
Average risk score
62.6
High risk on average, out of 100
Flagged as unusual
5
15.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 32 | ₱1.3B | 62.5 | 5 | 79.7% |
| Region IV-B | 1 | ₱217.1M | 65.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Water Provision and Storage | 14 | ₱153.1M | 55.2 | 2 | 77.0% |
| Roads | 6 | ₱534.5M | 68.0 | 0 | 78.5% |
| Buildings and Facilities | 6 | ₱60.6M | 59.3 | 0 | 73.6% |
| Flood Control and Drainage | 4 | ₱571.5M | 69.7 | 0 | 96.5% |
| OTHER | 2 | ₱9.9M | 76.6 | 2 | 96.8% |
| GAA 2025 SSP | 1 | ₱141.6M | 95.9 | 1 | 80.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00117CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU, | Region V | Region V | On-Going | ₱141.6M | 80% | High risk96 | Flagged0.017 |
| 22FB0027BIP: CONSTRUCTION OF BITANO MULTI-PURPOSE BUILDING, BARANGAY 37 - BITANO, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 22FB0035BIP: CONSTRUCTION OF RIZAL MULTI-PURPOSE BUILDING, BARANGAY RIZAL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 24FB0111SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ANISLAG-TALAHIB-MARIAWA ROAD (PACKAGE 2), DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱135.2M | 93% | High risk72 | —-0.050 |
| 24FB0026SIPAG - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION, BAGACAY, LEGAZPI CITY, ALBAY (PHASE 3) | Region V | Albay 2nd DEO | On-Going | ₱135.2M | 99% | High risk72 | —-0.038 |
| 24FB0110SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ANISLAG-TALAHIB-MARIAWA ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱130.6M | 78% | High risk71 | —-0.047 |
| 24FB0185OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG MOGSOC RIVER, BARANGAY MANCAO, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 87% | High risk71 | —-0.041 |
| 24FB0211OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SHORE PROTECTION AT LIGUAN, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱125.8M | 100% | High risk71 | —-0.039 |
| 24FB0069BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, MIISI - MABINIT , LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱95.7M | 52% | High risk70 | —-0.046 |
| 24FB0181BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIDGE ROAD, HAMORAWON - LAGUNDI, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.7M | 48% | High risk69 | —-0.043 |
| 20FO0082NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALANAS-DEL ROSARIO ROAD, JOVELLAR, ALBAY | Region V | Albay 3rd DEO | Completed | ₱72.4M | 100% | High risk67 | —-0.095 |
| 23E00126SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BONGABONG RIVER, MORENTE-LISAP SECTION, BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱217.1M | 100% | High risk65 | —-0.042 |
| 22FB0082BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT ANISLAG RESETTLEMENT SITE, BARANGAY ANISLAG, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 18% | High risk61 | Flagged0.008 |
| 22FB0089BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BIGAO ELEMENTARY SCHOOL, BARANGAY BIGAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 30% | High risk61 | Flagged0.004 |
| 22FB0278SIPAG: REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. TULA-TULA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.4M | 34% | High risk60 | —-0.024 |
| 23F00207CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FRANCIA, IRIGA CITY, CAMARINES SUR | Region V | Region V | On-Going | ₱9.7M | 33% | High risk60 | —-0.031 |
| 21FB0131LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOGON HIGH SCHOOL, BARANGAY GOGON, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.6M | 93% | High risk60 | —-0.032 |
| 23FA0046CLUSTER 14- REPAIR & REHAB. OF CLASSROOMS @ BALADING ELEM. SCHOOL, MALINAO, ALBAY & MALILIPOT NAT'L. HIGH SCHOOL, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱19.6M | 100% | High risk60 | —-0.096 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00117CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU, | Region V | Region V | On-Going | ₱141.6M | 80% | High risk96 | Flagged0.017 |
| 22FB0082BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT ANISLAG RESETTLEMENT SITE, BARANGAY ANISLAG, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 18% | High risk61 | Flagged0.008 |
| 22FB0027BIP: CONSTRUCTION OF BITANO MULTI-PURPOSE BUILDING, BARANGAY 37 - BITANO, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 22FB0035BIP: CONSTRUCTION OF RIZAL MULTI-PURPOSE BUILDING, BARANGAY RIZAL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 22FB0089BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BIGAO ELEMENTARY SCHOOL, BARANGAY BIGAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 30% | High risk61 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25F00117CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU, | Region V | Region V | On-Going | ₱141.6M | 80% | High risk96 | Flagged0.017 |
| 2 | 22FB0027BIP: CONSTRUCTION OF BITANO MULTI-PURPOSE BUILDING, BARANGAY 37 - BITANO, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 3 | 22FB0035BIP: CONSTRUCTION OF RIZAL MULTI-PURPOSE BUILDING, BARANGAY RIZAL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.9M | 97% | High risk77 | Flagged0.007 |
| 4 | 24FB0111SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ANISLAG-TALAHIB-MARIAWA ROAD (PACKAGE 2), DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱135.2M | 93% | High risk72 | —-0.050 |
| 5 | 24FB0026SIPAG - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION, BAGACAY, LEGAZPI CITY, ALBAY (PHASE 3) | Region V | Albay 2nd DEO | On-Going | ₱135.2M | 99% | High risk72 | —-0.038 |
| 6 | 24FB0110SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ANISLAG-TALAHIB-MARIAWA ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱130.6M | 78% | High risk71 | —-0.047 |
| 7 | 24FB0185OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG MOGSOC RIVER, BARANGAY MANCAO, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.4M | 87% | High risk71 | —-0.041 |
| 8 | 24FB0211OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SHORE PROTECTION AT LIGUAN, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱125.8M | 100% | High risk71 | —-0.039 |
| 9 | 24FB0069BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, MIISI - MABINIT , LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱95.7M | 52% | High risk70 | —-0.046 |
| 10 | 24FB0181BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIDGE ROAD, HAMORAWON - LAGUNDI, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.7M | 48% | High risk69 | —-0.043 |
| 11 | 20FO0082NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PALANAS-DEL ROSARIO ROAD, JOVELLAR, ALBAY | Region V | Albay 3rd DEO | Completed | ₱72.4M | 100% | High risk67 | —-0.095 |
| 12 | 23E00126SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BONGABONG RIVER, MORENTE-LISAP SECTION, BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱217.1M | 100% | High risk65 | —-0.042 |
| 13 | 22FB0082BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT ANISLAG RESETTLEMENT SITE, BARANGAY ANISLAG, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 18% | High risk61 | Flagged0.008 |
| 14 | 22FB0089BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BIGAO ELEMENTARY SCHOOL, BARANGAY BIGAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.8M | 30% | High risk61 | Flagged0.004 |
| 15 | 22FB0278SIPAG: REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. TULA-TULA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.4M | 34% | High risk60 | —-0.024 |
| 16 | 23F00207CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FRANCIA, IRIGA CITY, CAMARINES SUR | Region V | Region V | On-Going | ₱9.7M | 33% | High risk60 | —-0.031 |
| 17 | 21FB0131LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOGON HIGH SCHOOL, BARANGAY GOGON, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.6M | 93% | High risk60 | —-0.032 |
| 18 | 23FA0046CLUSTER 14- REPAIR & REHAB. OF CLASSROOMS @ BALADING ELEM. SCHOOL, MALINAO, ALBAY & MALILIPOT NAT'L. HIGH SCHOOL, MALILIPOT, ALBAY | Region V | Albay 1st DEO | Completed | ₱19.6M | 100% | High risk60 | —-0.096 |
| 19 | 22FB0088BIP: CONSTRUCTION OF WATER SYSTEM (LEVEL II) AT BICOL REGIONAL TRAINING AND TEACHING HOSPITAL (BRTTH), BARANGAY SAGPON, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱5M | 100% | Medium risk60 | —-0.062 |
| 20 | 22FB0264CONSTRUCTION OF WATER SYSTEM LEVEL II IN BRGY. BALIGANG, BRGY. BONGABON, BRGY. CAGUIBA, BRGY. DEL ROSARIO, BRGY. ILULUAN, AND BRGY. MITI, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.4M | 36% | Medium risk60 | —-0.001 |
| 21 | 21FB0143LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONCRETING OF SITIO SAN ISIDRO ROAD, BARANGAY PURO, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱4.9M | 100% | Medium risk60 | —-0.098 |
| 22 | 20FA0048CLUSTER 27-CONSTRUCTION OF WATER SYSTEM LEVEL II, IN THE FIRST DISTRICT OF ALBAY | Region V | Albay 1st DEO | Completed | ₱15.3M | 100% | Medium risk58 | —-0.065 |
| 23 | 22FB0251SIPAG: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BARIIS LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱4.7M | 82% | Medium risk58 | —-0.041 |
| 24 | 22FB0277SIPAG: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BUENAVISTA, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱7.6M | 100% | Medium risk57 | —-0.098 |
| 25 | 23F00370CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN BATO, CAMARINES SUR, SAN ROQUE AND AGOS, BATO, CAMARINES SUR (5TH LEGISLA | Region V | Region V | On-Going | ₱9.6M | 88% | Medium risk57 | —-0.024 |