Opening the dossier…
Opening the dossier…
Contractor dossier
199 projects on file, including joint ventures this contractor is part of.
Total projects
199
Total budget
₱20.5B
Average progress
97.2%
Completion rate
88.9%
Average risk score
49.9
Medium risk on average, out of 100
Flagged as unusual
10
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 193 | ₱19.9B | 49.7 | 10 | 97.1% |
| Region X | 6 | ₱620.9M | 55.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱7.8B | 47.0 | 1 | 96.7% |
| Flood Control and Drainage | 63 | ₱5.6B | 47.8 | 0 | 98.8% |
| Bridges | 45 | ₱4.9B | 48.4 | 1 | 98.1% |
| OTHER | 9 | ₱947.8M | 75.2 | 5 | 93.5% |
| Bridges, Roads | 6 | ₱914.8M | 52.1 | 0 | 97.5% |
| GAA 2025 OO-1 | 3 | ₱244M | 93.7 | 3 | 78.5% |
| GAA 2025 OO-2 | 1 | ₱144.6M | 92.4 | 0 | 83.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00161WAWA BR. (B00896MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱48.1M | 95% | High risk94 | Flagged0.001 |
| 25N00176SIMULAO BR. (B00928MN) ALONG DAANG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱47.9M | 58% | High risk94 | Flagged0.018 |
| 25N00158ESPERANZA BR. ALONG BAYUGAN-ESPERANZA RD (PHASE VIII) | Region XIII | Region XIII | On-Going | ₱147.9M | 82% | High risk94 | Flagged0.018 |
| 25N00258CONSTRUCTION OF RIVERBANK SLOPE PROTECTION (UPSTREAM) L/S, BARANGAY SACOL, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱144.6M | 84% | High risk92 | —-0.002 |
| 24N00076DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE- LAS NIEVES- SIBAGAT), PACKAGE E, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱147.6M | 95% | High risk80 | Flagged0.021 |
| 24N00021ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱147.2M | 96% | High risk80 | Flagged0.019 |
| 17N00073CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, NRJ DAANG MAHARLIKA (TAGUIBO SECTION) - MASAO PORT INCL. BRIDGE (BANZA BRIDGE), AGUSAN DEL NORTE 1ST LD. PACKAGE 2, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱144.4M | 100% | High risk79 | —-0.010 |
| 24N00162CABADBARAN-PUTING BATO- LANUZA ROAD, PACKAGE 10, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱96.5M | 100% | High risk79 | Flagged0.008 |
| 20N00020NRJ DAANG MAHARLIKA (TAGUIBO SECTION)-MASAO PORT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱106.1M | 100% | High risk79 | —-0.019 |
| 17N00034WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES, INCLUDING ROW, GUIHAO-AN BR. (B00871MN) ALONG BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS OR RD) (CONSTRUCTION OF PARALLEL BRIDGE), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱105.3M | 100% | High risk78 | Flagged0.000 |
| 25N00130ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱47.8M | 51% | High risk77 | Flagged0.011 |
| 24ND0027TUNGAO PARALLEL BR. ALONG BUTUAN CITY-MALAYBALAY RD | Region XIII | Butuan City DEO | Completed | ₱37M | 100% | High risk74 | —-0.025 |
| 20K00348CONSTRUCTION/ REHABILITATION OF CAGAYAN DE ORO RIVER BASINS, CALA-CALA SECTION, BRGY. MACASANDIG, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱268M | 100% | High risk63 | —-0.038 |
| 17NC0037CONSTRUCTION OF FLOOD CONTROL DIKE OF SIMULAO RIVER (0+110--0+300 UPSTREAM) & (0+017-0+057 DOWNSTREAM), BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.026 |
| 17N00155CONSTRUCTION OF FLOOD MITIGATION-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE I, PHASE I & II, URBAN DRAINAGE SYSTEM IN BUTUAN CITY, AGUSAN PEQUEÑO RIVER CHANNEL IMPROVEMENT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱96.5M | 100% | High risk62 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00076DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE- LAS NIEVES- SIBAGAT), PACKAGE E, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱147.6M | 95% | High risk80 | Flagged0.021 |
| 24N00021ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱147.2M | 96% | High risk80 | Flagged0.019 |
| 25N00176SIMULAO BR. (B00928MN) ALONG DAANG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱47.9M | 58% | High risk94 | Flagged0.018 |
| 25N00158ESPERANZA BR. ALONG BAYUGAN-ESPERANZA RD (PHASE VIII) | Region XIII | Region XIII | On-Going | ₱147.9M | 82% | High risk94 | Flagged0.018 |
| 17N00108COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, BILAY-DULAG SECTION INCL. BRIDGE (AGUSAN BRIDGE) AND ROW, AGUSAN DEL NORTE, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱228.7M | 100% | Medium risk51 | Flagged0.011 |
| 25N00130ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱47.8M | 51% | High risk77 | Flagged0.011 |
| 24N00162CABADBARAN-PUTING BATO- LANUZA ROAD, PACKAGE 10, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱96.5M | 100% | High risk79 | Flagged0.008 |
| 25N00161WAWA BR. (B00896MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱48.1M | 95% | High risk94 | Flagged0.001 |
| 17N00170CONCRETING OF ROAD FROM 1ST BOX CULVERT (TALIGAMAN) TO BUGSUKAN ROAD SENTRO (EASTING) PAVED ROAD (PHASE 2), TALIGAMAN, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱48.2M | 100% | Medium risk46 | Flagged0.001 |
| 17N00034WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES, INCLUDING ROW, GUIHAO-AN BR. (B00871MN) ALONG BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS OR RD) (CONSTRUCTION OF PARALLEL BRIDGE), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱105.3M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25N00161WAWA BR. (B00896MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱48.1M | 95% | High risk94 | Flagged0.001 |
| 2 | 25N00176SIMULAO BR. (B00928MN) ALONG DAANG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱47.9M | 58% | High risk94 | Flagged0.018 |
| 3 | 25N00158ESPERANZA BR. ALONG BAYUGAN-ESPERANZA RD (PHASE VIII) | Region XIII | Region XIII | On-Going | ₱147.9M | 82% | High risk94 | Flagged0.018 |
| 4 | 25N00258CONSTRUCTION OF RIVERBANK SLOPE PROTECTION (UPSTREAM) L/S, BARANGAY SACOL, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱144.6M | 84% | High risk92 | —-0.002 |
| 5 | 24N00076DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE- LAS NIEVES- SIBAGAT), PACKAGE E, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱147.6M | 95% | High risk80 | Flagged0.021 |
| 6 | 24N00021ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱147.2M | 96% | High risk80 | Flagged0.019 |
| 7 | 17N00073CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, NRJ DAANG MAHARLIKA (TAGUIBO SECTION) - MASAO PORT INCL. BRIDGE (BANZA BRIDGE), AGUSAN DEL NORTE 1ST LD. PACKAGE 2, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱144.4M | 100% | High risk79 | —-0.010 |
| 8 | 24N00162CABADBARAN-PUTING BATO- LANUZA ROAD, PACKAGE 10, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱96.5M | 100% | High risk79 | Flagged0.008 |
| 9 | 20N00020NRJ DAANG MAHARLIKA (TAGUIBO SECTION)-MASAO PORT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱106.1M | 100% | High risk79 | —-0.019 |
| 10 | 17N00034WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES, INCLUDING ROW, GUIHAO-AN BR. (B00871MN) ALONG BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS OR RD) (CONSTRUCTION OF PARALLEL BRIDGE), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱105.3M | 100% | High risk78 | Flagged0.000 |
| 11 | 25N00130ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱47.8M | 51% | High risk77 | Flagged0.011 |
| 12 | 24ND0027TUNGAO PARALLEL BR. ALONG BUTUAN CITY-MALAYBALAY RD | Region XIII | Butuan City DEO | Completed | ₱37M | 100% | High risk74 | —-0.025 |
| 13 | 20K00348CONSTRUCTION/ REHABILITATION OF CAGAYAN DE ORO RIVER BASINS, CALA-CALA SECTION, BRGY. MACASANDIG, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱268M | 100% | High risk63 | —-0.038 |
| 14 | 17NC0037CONSTRUCTION OF FLOOD CONTROL DIKE OF SIMULAO RIVER (0+110--0+300 UPSTREAM) & (0+017-0+057 DOWNSTREAM), BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.026 |
| 15 | 17N00155CONSTRUCTION OF FLOOD MITIGATION-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE I, PHASE I & II, URBAN DRAINAGE SYSTEM IN BUTUAN CITY, AGUSAN PEQUEÑO RIVER CHANNEL IMPROVEMENT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱96.5M | 100% | High risk62 | —-0.037 |
| 16 | 17ND0041CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG JCT. MONTILLA BOULEVARD-T. CALO STREET-JCT. OCHOA STREET-JCT. SALVADOR CALO STREET TO LADP MAIN DRAINAGE CANAL, BUTUAN CITY, AGUSAN DEL NORTE 1ST LD | Region XIII | Butuan City DEO | Completed | ₱74.3M | 100% | Medium risk59 | —-0.040 |
| 17 | 17K00089CONST. OF TAGOLOAN FC STRUCT. ALONG TAGOLOAN RIVER(STO. ROSARIO SECT),INCL. ROW, TAGOLOAN, MIS. OR. | Region X | Region X | Completed | ₱90.6M | 100% | Medium risk58 | —-0.041 |
| 18 | 17K00027CONST. OF CDO CITY RIVER BASIN FC PROJ(W/SLUICE WAT & GATE),INCL. ROW,CDOC 1ST LD | Region X | Region X | Completed | ₱86.7M | 100% | Medium risk58 | —-0.027 |
| 19 | 17K00088CONST. OF REVETMENT OF IPONAN BR. I & II TO IPONAN BR III,ALONG IPONAN RIVER(UPSTREAM & DOWNSTREAM,B | Region X | Region X | Completed | ₱84.8M | 100% | Medium risk58 | —-0.049 |
| 20 | 25N00154NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE, PACKAGE B | Region XIII | Region XIII | On-Going | ₱346.7M | 62% | Medium risk56 | —-0.018 |
| 21 | 24N00072BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGWAY (TAGUIBO-MASAO-BUENAVISTA-NASIPIT), PACKAGE 39, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱231.6M | 96% | Medium risk56 | —-0.026 |
| 22 | 23N00010NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱208.4M | 100% | Medium risk56 | —-0.037 |
| 23 | 24N00068NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE, PACKAGE A | Region XIII | Region XIII | On-Going | ₱158.3M | 85% | Medium risk56 | —-0.024 |
| 24 | 24N00147CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ABUTMENT A OF AGUSAN BRIDGE ALONG AGUSAN RIVER, PACKAGE 2, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 100% | Medium risk56 | —-0.006 |
| 25 | 24N00156CONSTRUCTION OF BUGTA-BALATAKAN ROAD (PHASE II), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 99% | Medium risk55 | —-0.033 |