Contractor dossier
96 projects on file, including joint ventures this contractor is part of.
Total projects
96
Total budget
₱4.9B
Average progress
78.7%
Completion rate
34.4%
Below 70%
Average risk score
65.0
High risk on average, out of 100
Flagged as unusual
11
11.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 58 | ₱3.7B | 73.2 | 6 | 70.5% |
| Region V | 30 | ₱316.9M | 48.0 | 0 | 98.3% |
| Region IV-B | 4 | ₱749.7M | 72.3 | 2 | 67.7% |
| Region IV-A | 3 | ₱165.7M | 80.1 | 3 | 49.9% |
| National Capital Region | 1 | ₱2M | 23.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 42 | ₱3.8B | 76.6 | 4 | 76.1% |
| Buildings and Facilities | 33 | ₱413.6M | 52.1 | 3 | 86.4% |
| Roads | 11 | ₱317M | 63.8 | 1 | 58.8% |
| Bridges | 6 | ₱41.2M | 40.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱267.4M | 94.3 | 2 | 60.2% |
| GAA 2025 SSP | 1 | ₱47.6M | 95.2 | 1 | 41.2% |
| Water Provision and Storage | 1 | ₱4.9M | 71.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DK0044CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY DAUNGAN, PAGBILAO, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.6M | 41% | High risk95 | Flagged0.009 |
| 25CP0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 46% | High risk94 | Flagged0.015 |
| 25CP0001ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 74% | High risk94 | Flagged0.008 |
| 25CL0168CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0166CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 98% | High risk82 | —-0.021 |
| 25CL0164CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0165CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0193CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 79% | High risk82 | —-0.014 |
| 25CL0192CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 81% | High risk82 | —-0.014 |
| 25CL0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 82% | High risk82 | —-0.015 |
| 25CL0195CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 25CL0196CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 25CP0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.007 |
| 25CP0036FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BULO RIVER CONTROL (BACK OF BUGA E/S), DOWNSTREAM SEGMENT 1, BRGY. BUGA, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 69% | High risk81 | —-0.013 |
| 25CP0034FLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.008 |
| 25CP0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 40% | High risk81 | —-0.008 |
| 25CP0035FLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 79% | High risk81 | —-0.019 |
| 25CP0094CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT.PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. TUKOD, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 55% | High risk81 | —-0.009 |
| 24C00492SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE AT BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 86% | High risk81 | —-0.016 |
| 25CL0167CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk81 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00586BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONST. OF ELEM. AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUC. FACILITIES FUND:CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BLDG. IN PULONG SAMPALOC ELEM. SCHOOL, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BUL. | Region III | Region III | On-Going | ₱19.7M | 0% | Medium risk47 | Flagged0.035 |
| 24C00645BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUCATION FACILITIES FUND-CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN PULONG SAMPALOC ES, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱30.8M | 0% | Medium risk48 | Flagged0.034 |
| 25E00238BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱236.9M | 38% | High risk78 | Flagged0.027 |
| 25E00239BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱237M | 52% | High risk78 | Flagged0.027 |
| 23D00227CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, BARANGAY MINAHAN NORTE, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱23.5M | 100% | High risk66 | Flagged0.024 |
| 25CP0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 46% | High risk94 | Flagged0.015 |
| 25CP0205FARM-TO-MARKET ROAD (FMR) PROJECTS - REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET-ROADS - CONCRETING OF BRGY. TELEPATIO FMR (PHASE II), BRGY TELEPATIO, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱4.9M | 99% | High risk61 | Flagged0.010 |
| 25DK0044CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY DAUNGAN, PAGBILAO, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.6M | 41% | High risk95 | Flagged0.009 |
| 25CP0001ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 74% | High risk94 | Flagged0.008 |
| 23C00358NATIONAL BUILDING PROGRAM-BUILDING AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-REHABILITATION OF ONE STOREY BUILDING AS TEMPORARY FACILITIES FOR DPWH BULACAN SUB DISTRICT ENGINEERING OFFICE, BRGY. TAMBUBONG, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱9.5M | 100% | Medium risk48 | Flagged0.003 |
| 25D00160CONSTRUCTION OF BREAKWATER (PHASE 2) AT BARANGAY PIPINDAN, BINANGONAN, RIZAL | Region IV-A | Region IV-A | On-Going | ₱94.6M | 9% | High risk79 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DK0044CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY DAUNGAN, PAGBILAO, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.6M | 41% | High risk95 | Flagged0.009 |
| 2 | 25CP0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 46% | High risk94 | Flagged0.015 |
| 3 | 25CP0001ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 74% | High risk94 | Flagged0.008 |
| 4 | 25CL0168CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 5 | 25CL0166CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 98% | High risk82 | —-0.021 |
| 6 | 25CL0164CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 7 | 25CL0165CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 8 | 25CL0193CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 79% | High risk82 | —-0.014 |
| 9 | 25CL0192CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 81% | High risk82 | —-0.014 |
| 10 | 25CL0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 82% | High risk82 | —-0.015 |
| 11 | 25CL0195CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 12 | 25CL0196CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 13 | 25CP0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.007 |
| 14 | 25CP0036FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BULO RIVER CONTROL (BACK OF BUGA E/S), DOWNSTREAM SEGMENT 1, BRGY. BUGA, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 69% | High risk81 | —-0.013 |
| 15 | 25CP0034FLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.008 |
| 16 | 25CP0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 40% | High risk81 | —-0.008 |
| 17 | 25CP0035FLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 79% | High risk81 | —-0.019 |
| 18 | 25CP0094CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT.PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. TUKOD, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 55% | High risk81 | —-0.009 |
| 19 | 24C00492SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE AT BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 86% | High risk81 | —-0.016 |
| 20 | 25CL0167CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk81 | —-0.021 |
| 21 | 25CP0033FLOOD MANAGEMENT PROG. - CONST. / MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL, PUROK 3 SECTION, BARANGAY PASONG INTSIK, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 96% | High risk81 | —-0.021 |
| 22 | 25CP0100CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA.PROJS. ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION OF STUCTS. PRTOTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT A(SITIO MATAAS NA | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 52% | High risk81 | —-0.009 |
| 23 | 25CP0031FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CTRL.(UPSTREAM),PUROK1 SEC., BRGY. BUBULONG MUNTI,SAN ILDEFONSO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 31% | High risk81 | —-0.005 |
| 24 | 25CP0032FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL (DOWNSTREAM),PUROK 1 SECTION,BRGY. BUBULONG MUNTI,SAN ILDEFON | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 86% | High risk81 | —-0.022 |
| 25 | 24C00493SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE ALONG MADLUM RIVER (DOWNSTREAM) SITIO BALINGCUPANG,BRGY. BIAK NA BATO, SAN MIGUEL, BUL | Region III | Region III | On-Going | ₱95M | 100% | High risk81 | —-0.022 |