Contractor dossier
96 projects on file, including joint ventures this contractor is part of.
Total projects
96
Total budget
₱4.9B
Average progress
78.7%
Completion rate
34.4%
Below 70%
Average risk score
65.0
High risk on average, out of 100
Flagged as unusual
11
11.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 58 | ₱3.7B | 73.2 | 6 | 70.5% |
| Region V | 30 | ₱316.9M | 48.0 | 0 | 98.3% |
| Region IV-B | 4 | ₱749.7M | 72.3 | 2 | 67.7% |
| Region IV-A | 3 | ₱165.7M | 80.1 | 3 | 49.9% |
| National Capital Region | 1 | ₱2M | 23.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 42 | ₱3.8B | 76.6 | 4 | 76.1% |
| Buildings and Facilities | 33 | ₱413.6M | 52.1 | 3 | 86.4% |
| Roads | 11 | ₱317M | 63.8 | 1 | 58.8% |
| Bridges | 6 | ₱41.2M | 40.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱267.4M | 94.3 | 2 | 60.2% |
| GAA 2025 SSP | 1 | ₱47.6M | 95.2 | 1 | 41.2% |
| Water Provision and Storage | 1 | ₱4.9M | 71.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DK0044CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY DAUNGAN, PAGBILAO, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.6M | 41% | High risk95 | Flagged0.009 |
| 25CP0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 46% | High risk94 | Flagged0.015 |
| 25CP0001ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 74% | High risk94 | Flagged0.008 |
| 25CL0168CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0166CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 98% | High risk82 | —-0.021 |
| 25CL0164CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0165CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk82 | —-0.021 |
| 25CL0193CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 79% | High risk82 | —-0.014 |
| 25CL0192CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 81% | High risk82 | —-0.014 |
| 25CL0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 82% | High risk82 | —-0.015 |
| 25CL0195CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 25CL0196CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 87% | High risk82 | —-0.016 |
| 25CP0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.007 |
| 25CP0036FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BULO RIVER CONTROL (BACK OF BUGA E/S), DOWNSTREAM SEGMENT 1, BRGY. BUGA, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 69% | High risk81 | —-0.013 |
| 25CP0034FLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 41% | High risk81 | —-0.008 |
| 25CP0090CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 40% | High risk81 | —-0.008 |
| 25CP0035FLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 79% | High risk81 | —-0.019 |
| 25CP0094CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT.PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. TUKOD, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95M | 55% | High risk81 | —-0.009 |
| 24C00492SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE AT BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 86% | High risk81 | —-0.016 |
| 25CL0167CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 99% | High risk81 | —-0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00586BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONST. OF ELEM. AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUC. FACILITIES FUND:CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BLDG. IN PULONG SAMPALOC ELEM. SCHOOL, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BUL. | Region III | Region III | On-Going | ₱19.7M | 0% | Medium risk47 | Flagged0.035 |
| 24C00645BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUCATION FACILITIES FUND-CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN PULONG SAMPALOC ES, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱30.8M | 0% | Medium risk48 | Flagged0.034 |
| 25E00238BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱236.9M | 38% | High risk78 | Flagged0.027 |
| 25E00239BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱237M | 52% | High risk78 | Flagged0.027 |
| 23D00227CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, BARANGAY MINAHAN NORTE, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱23.5M | 100% | High risk66 | Flagged0.024 |
| 25CP0002ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 46% | High risk94 | Flagged0.015 |
| 25CP0205FARM-TO-MARKET ROAD (FMR) PROJECTS - REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET-ROADS - CONCRETING OF BRGY. TELEPATIO FMR (PHASE II), BRGY TELEPATIO, SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱4.9M | 99% | High risk61 | Flagged0.010 |
| 25DK0044CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY DAUNGAN, PAGBILAO, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.6M | 41% | High risk95 | Flagged0.009 |
| 25CP0001ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱133.7M | 74% | High risk94 | Flagged0.008 |
| 23C00358NATIONAL BUILDING PROGRAM-BUILDING AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-REHABILITATION OF ONE STOREY BUILDING AS TEMPORARY FACILITIES FOR DPWH BULACAN SUB DISTRICT ENGINEERING OFFICE, BRGY. TAMBUBONG, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱9.5M | 100% | Medium risk48 | Flagged0.003 |
| 25D00160CONSTRUCTION OF BREAKWATER (PHASE 2) AT BARANGAY PIPINDAN, BINANGONAN, RIZAL | Region IV-A | Region IV-A | On-Going | ₱94.6M | 9% | High risk79 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23FE0001(CLUSTERED PROJECTS) CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - A. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY AWAYAN, LIBMANAN, CAMARINES SUR; B. CONSTRUCTION (COMPLETION) | Region V | Camarines Sur 2nd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.095 |
| 77 | 20FE0154CONCRETING OF BRGY. CAPUCNASAN FMR, BRGY. CAPUCNASAN, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱14.5M | 100% | Medium risk49 | —-0.048 |
| 78 | 25FD0065CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BRGY. PORT JUNCTION NORTE, RAGAY, CAMARINES SUR | Region V | Camarines Sur 1st DEO | On-Going | ₱29.1M | 80% | Medium risk49 | —-0.052 |
| 79 | 24FD0060CONSTRUCTION OF MULTI-PURPOSE BUILDING, COTMO, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱7.4M | 100% | Medium risk49 | —-0.095 |
| 80 | 24FD0016CONSTRUCTION OF MULTI-PURPOSE BUILDING, SERRANZANA, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.098 |
| 81 | 24FD0029CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALVACION, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱6.8M | 100% | Medium risk49 | —-0.098 |
| 82 | 24FD0033CONSTRUCTION OF MULTI-PURPOSE BUILDING, MALUBAGO, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.098 |
| 83 | 24FD0017CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), TARA, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.098 |
| 84 | 23C00358NATIONAL BUILDING PROGRAM-BUILDING AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-REHABILITATION OF ONE STOREY BUILDING AS TEMPORARY FACILITIES FOR DPWH BULACAN SUB DISTRICT ENGINEERING OFFICE, BRGY. TAMBUBONG, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱9.5M | 100% | Medium risk48 | Flagged0.003 |
| 85 | 24C00645BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUCATION FACILITIES FUND-CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN PULONG SAMPALOC ES, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱30.8M | 0% | Medium risk48 | Flagged0.034 |
| 86 | 22FE0047CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TINANQUIHAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.095 |
| 87 | 23FE0003(CLUSTERED PROJECTS) CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - A. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PADLOS, LIBMANAN, CAMARINES SUR; B. CONSTRUCTION (COMPLETI | Region V | Camarines Sur 2nd DEO | Completed | ₱7.3M | 100% | Medium risk47 | —-0.091 |
| 88 | 22FE0016CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SALINGOGON, MINALABAC, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.093 |
| 89 | 24C00586BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONST. OF ELEM. AND SECONDARY CLASSROOMS UNDER DEPED'S BASIC EDUC. FACILITIES FUND:CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BLDG. IN PULONG SAMPALOC ELEM. SCHOOL, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BUL. | Region III | Region III | On-Going | ₱19.7M | 0% | Medium risk47 | Flagged0.035 |
| 90 | 24CL0199CONCRETING OF BRGY. SANTA BARBARA TO BRGY. DIRITA FMR, BRGY. SANTA BARBARA AND BRGY. DIRITA, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱14.5M | 100% | Medium risk42 | —-0.003 |
| 91 | 22FE0095CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPEDS BASIC EDUCATIONAL FACILITIES FUNDS : CONSTRUCTION OF 1STY2CL, GAINZA CS - GAINZA, GAINZA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5.3M | 100% | Medium risk40 | —-0.053 |
| 92 | 22FE0076OO1: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NAUBOD BR. 1 (B04475LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Camarines Sur 2nd DEO | Completed | ₱3.8M | 100% | Medium risk33 | —-0.059 |
| 93 | 22FE0077OO1: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NAUBOD BR. 2 (B04476LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Camarines Sur 2nd DEO | Completed | ₱3.5M | 100% | Medium risk32 | —-0.058 |
| 94 | 22FE0078OO1: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - MATAOROC BR. (B04480LZ) ALONG MILAOR-MINALABAC-PILI RD | Region V | Camarines Sur 2nd DEO | Completed | ₱3.9M | 100% | Medium risk31 | —-0.060 |
| 95 | 23CD0114ORGANIZATIONAL OUTCOME 1 BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES - C. DE LEON BR. 1 (B01679LZ) ALONG DAANG MAHARLIKA (LZ) | Region III | Bulacan 2nd DEO | Completed | ₱20.3M | 100% | Medium risk31 | —-0.067 |
| 96 | 22OC0098REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY DON GALO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱2M | 100% | Low risk23 | —-0.101 |