Contractor dossier
48 projects on file, including joint ventures this contractor is part of.
Total projects
48
Total budget
₱9.2B
Average progress
92.1%
Completion rate
77.1%
Average risk score
60.5
High risk on average, out of 100
Flagged as unusual
12
25.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 20 | ₱3.4B | 61.7 | 6 | 94.9% |
| Region IV-A | 12 | ₱2.6B | 66.1 | 3 | 90.3% |
| Region III | 7 | ₱580.4M | 40.1 | 0 | 100.0% |
| Region I | 6 | ₱2B | 67.2 | 2 | 73.2% |
| Region VI | 3 | ₱593.9M | 64.1 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 40 | ₱7.7B | 58.2 | 9 | 95.4% |
| OTHER | 3 | ₱883.8M | 75.8 | 2 | 70.8% |
| GAA 2025 OO-1 | 2 | ₱325M | 93.2 | 1 | 47.4% |
| Bridges, Roads | 1 | ₱148.2M | 62.6 | 0 | 100.0% |
| Roads | 1 | ₱103.5M | 56.4 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱29.4M | 44.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00427CONSTRUCTION OF NEW BRIDGES, PANCIAN VIADUCT ALONG MANILA NORTH RD (PHASE IV) | Region I | Region I | On-Going | ₱298.6M | 1% | High risk94 | Flagged0.066 |
| 25B00003OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE (ALICAOCAO BRIDGE AND APPROACHES), ISABELA | Region II | Region II | On-Going | ₱26.4M | 94% | High risk93 | —-0.006 |
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 24B00054CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE | Region II | Region II | On-Going | ₱82M | 22% | High risk80 | Flagged0.038 |
| 19A00118CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG CITY BY-PASS ROAD, BRIDGE PACKAGE, ILOCOS NORTE | Region I | Region I | On-Going | ₱892.9M | 38% | High risk74 | Flagged0.066 |
| 22B00021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN | Region II | Region II | Completed | ₱347.2M | 100% | High risk68 | Flagged0.021 |
| 20D00048FY 2020 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA HONDAGUA ROMA POINTQUEZON ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk68 | —-0.005 |
| 23B00043OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM : CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), PACKAGE 2 | Region II | Region II | On-Going | ₱192.9M | 99% | High risk68 | Flagged0.019 |
| 19D00029FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS MSR JCT CANDA- HONDAGUA ROMA POINT-QUEZON ROAD PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱142.8M | 100% | High risk67 | —-0.038 |
| 24D00014CONSTRUCTION OF MISSING LINKS / NEW ROADS MSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE B, QUEZON | Region IV-A | Region IV-A | On-Going | ₱369.8M | 58% | High risk67 | Flagged0.024 |
| 21D00059FY 2021 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONST.N OF MISSING LINKS/ NEW ROADS MSR JCT CANDA-HONDAGUA ROMA POINT -QUEZON ROAD, INCL. BRIDGE (QUEZON SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱270.2M | 100% | High risk67 | —-0.010 |
| 21D00058ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS MSR JCT CANDA-HONDAGUA ROMA POINT-QUEZON ROAD, INCL. BRIDGE (LOPEZ SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱270.2M | 100% | High risk67 | —-0.015 |
| 18D00036ENSURE SAFE & RELIABLE NAT'L. ROAD & NETWORK DEVELOPMENT PROGRAM, CONST. OF MISSING LINKS/NEW ROADS, MSR JCT. CANDA-HONDAGUA ROMA POINT-QUEZON ROAD PACKAGE B, INCL. BRIDGE, QUEZON | Region IV-A | Region IV-A | Completed | ₱235.8M | 100% | High risk67 | —-0.016 |
| 25D00012CONSTRUCTION OF MISSING LINKS/ NEW ROADS MSR JCT CANDA - HONDAGUA-ROMA POINT ROAD, PACKAGE C | Region IV-A | Region IV-A | On-Going | ₱181.1M | 33% | High risk66 | Flagged0.006 |
| 23D00013CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA - HONDAGUA ROMA POINT-QUEZON ROAD, INCL. BRIDGE (LOPEZ SIDE), (PHASE 1), QUEZON | Region IV-A | Region IV-A | Completed | ₱179.7M | 100% | High risk66 | —-0.035 |
| 23D00012CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA-HONDAGUA ROMA POINT-QUEZON ROAD, (LOPEZ SIDE), (PHASE 2), QUEZON | Region IV-A | Region IV-A | Completed | ₱179.5M | 100% | High risk66 | —-0.035 |
| 24D00013CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | On-Going | ₱380.9M | 93% | High risk66 | Flagged0.014 |
| 20B00037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS AND NEW ROADS JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT -LA SUERTE-CATARAUAN - AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES | Region II | Region II | Completed | ₱125.1M | 100% | High risk66 | —-0.026 |
| 20B00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MINANGA BRIDGE (B01129LZ) ALONG DAANG MAHARLIKA (LZ) (PARALLEL BRIDGE), TUMAUINI, ISABELA | Region II | Region II | On-Going | ₱374.5M | 95% | High risk65 | Flagged0.043 |
| 19G00056CONSTRUCTION OF VILVAR BRIDGE ALONG VILVAR - NASULI ROAD, SAN REMEGIO, ANTIQUE | Region VI | Region VI | Completed | ₱198M | 100% | High risk65 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 19A00118CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG CITY BY-PASS ROAD, BRIDGE PACKAGE, ILOCOS NORTE | Region I | Region I | On-Going | ₱892.9M | 38% | High risk74 | Flagged0.066 |
| 25A00427CONSTRUCTION OF NEW BRIDGES, PANCIAN VIADUCT ALONG MANILA NORTH RD (PHASE IV) | Region I | Region I | On-Going | ₱298.6M | 1% | High risk94 | Flagged0.066 |
| 20B00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MINANGA BRIDGE (B01129LZ) ALONG DAANG MAHARLIKA (LZ) (PARALLEL BRIDGE), TUMAUINI, ISABELA | Region II | Region II | On-Going | ₱374.5M | 95% | High risk65 | Flagged0.043 |
| 24B00054CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE | Region II | Region II | On-Going | ₱82M | 22% | High risk80 | Flagged0.038 |
| 24D00014CONSTRUCTION OF MISSING LINKS / NEW ROADS MSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE B, QUEZON | Region IV-A | Region IV-A | On-Going | ₱369.8M | 58% | High risk67 | Flagged0.024 |
| 22B00021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN | Region II | Region II | Completed | ₱347.2M | 100% | High risk68 | Flagged0.021 |
| 20B00024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: NAGUILIAN BRIDGE ALONG DAANG MAHARLIKA (LZ)(PARALLEL BRIDGE) | Region II | Region II | Completed | ₱969.1M | 100% | High risk65 | Flagged0.020 |
| 23B00043OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM : CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), PACKAGE 2 | Region II | Region II | On-Going | ₱192.9M | 99% | High risk68 | Flagged0.019 |
| 24D00013CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | On-Going | ₱380.9M | 93% | High risk66 | Flagged0.014 |
| 25D00012CONSTRUCTION OF MISSING LINKS/ NEW ROADS MSR JCT CANDA - HONDAGUA-ROMA POINT ROAD, PACKAGE C | Region IV-A | Region IV-A | On-Going | ₱181.1M | 33% | High risk66 | Flagged0.006 |
| 19G00056CONSTRUCTION OF VILVAR BRIDGE ALONG VILVAR - NASULI ROAD, SAN REMEGIO, ANTIQUE | Region VI | Region VI | Completed | ₱198M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25A00427CONSTRUCTION OF NEW BRIDGES, PANCIAN VIADUCT ALONG MANILA NORTH RD (PHASE IV) | Region I | Region I | On-Going | ₱298.6M | 1% | High risk94 | Flagged0.066 |
| 2 | 25B00003OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE (ALICAOCAO BRIDGE AND APPROACHES), ISABELA | Region II | Region II | On-Going | ₱26.4M | 94% | High risk93 | —-0.006 |
| 3 | 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 4 | 24B00054CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE | Region II | Region II | On-Going | ₱82M | 22% | High risk80 | Flagged0.038 |
| 5 | 19A00118CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG CITY BY-PASS ROAD, BRIDGE PACKAGE, ILOCOS NORTE | Region I | Region I | On-Going | ₱892.9M | 38% | High risk74 | Flagged0.066 |
| 6 | 22B00021OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN | Region II | Region II | Completed | ₱347.2M | 100% | High risk68 | Flagged0.021 |
| 7 | 20D00048FY 2020 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA HONDAGUA ROMA POINTQUEZON ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk68 | —-0.005 |
| 8 | 23B00043OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM : CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), PACKAGE 2 | Region II | Region II | On-Going | ₱192.9M | 99% | High risk68 | Flagged0.019 |
| 9 | 19D00029FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS MSR JCT CANDA- HONDAGUA ROMA POINT-QUEZON ROAD PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱142.8M | 100% | High risk67 | —-0.038 |
| 10 | 24D00014CONSTRUCTION OF MISSING LINKS / NEW ROADS MSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE B, QUEZON | Region IV-A | Region IV-A | On-Going | ₱369.8M | 58% | High risk67 | Flagged0.024 |
| 11 | 21D00059FY 2021 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONST.N OF MISSING LINKS/ NEW ROADS MSR JCT CANDA-HONDAGUA ROMA POINT -QUEZON ROAD, INCL. BRIDGE (QUEZON SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱270.2M | 100% | High risk67 | —-0.010 |
| 12 | 21D00058ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS MSR JCT CANDA-HONDAGUA ROMA POINT-QUEZON ROAD, INCL. BRIDGE (LOPEZ SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱270.2M | 100% | High risk67 | —-0.015 |
| 13 | 18D00036ENSURE SAFE & RELIABLE NAT'L. ROAD & NETWORK DEVELOPMENT PROGRAM, CONST. OF MISSING LINKS/NEW ROADS, MSR JCT. CANDA-HONDAGUA ROMA POINT-QUEZON ROAD PACKAGE B, INCL. BRIDGE, QUEZON | Region IV-A | Region IV-A | Completed | ₱235.8M | 100% | High risk67 | —-0.016 |
| 14 | 25D00012CONSTRUCTION OF MISSING LINKS/ NEW ROADS MSR JCT CANDA - HONDAGUA-ROMA POINT ROAD, PACKAGE C | Region IV-A | Region IV-A | On-Going | ₱181.1M | 33% | High risk66 | Flagged0.006 |
| 15 | 23D00013CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA - HONDAGUA ROMA POINT-QUEZON ROAD, INCL. BRIDGE (LOPEZ SIDE), (PHASE 1), QUEZON | Region IV-A | Region IV-A | Completed | ₱179.7M | 100% | High risk66 | —-0.035 |
| 16 | 23D00012CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA-HONDAGUA ROMA POINT-QUEZON ROAD, (LOPEZ SIDE), (PHASE 2), QUEZON | Region IV-A | Region IV-A | Completed | ₱179.5M | 100% | High risk66 | —-0.035 |
| 17 | 24D00013CONSTRUCTION OF MISSING LINKS / NEW ROADSMSR JCT CANDA - HONDAGUA ROMA POINT ROAD, PACKAGE A, QUEZON | Region IV-A | Region IV-A | On-Going | ₱380.9M | 93% | High risk66 | Flagged0.014 |
| 18 | 20B00037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS AND NEW ROADS JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT -LA SUERTE-CATARAUAN - AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES | Region II | Region II | Completed | ₱125.1M | 100% | High risk66 | —-0.026 |
| 19 | 20B00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MINANGA BRIDGE (B01129LZ) ALONG DAANG MAHARLIKA (LZ) (PARALLEL BRIDGE), TUMAUINI, ISABELA | Region II | Region II | On-Going | ₱374.5M | 95% | High risk65 | Flagged0.043 |
| 20 | 19G00056CONSTRUCTION OF VILVAR BRIDGE ALONG VILVAR - NASULI ROAD, SAN REMEGIO, ANTIQUE | Region VI | Region VI | Completed | ₱198M | 100% | High risk65 | Flagged0.004 |
| 21 | 20B00024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: NAGUILIAN BRIDGE ALONG DAANG MAHARLIKA (LZ)(PARALLEL BRIDGE) | Region II | Region II | Completed | ₱969.1M | 100% | High risk65 | Flagged0.020 |
| 22 | 19G00057WIDENING OF BRIDGE - SIBALOM BR. (B00123PN) ALONG ILOILO - ANTIQUE RD | Region VI | Region VI | Completed | ₱259.4M | 100% | High risk64 | —-0.002 |
| 23 | 22D00071MSR JCT - CANDA - HONDAGUA ROMA POINT - QUEZON ROAD, INCL. BRIDGE (LOPEZ SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱96.2M | 100% | High risk64 | —-0.053 |
| 24 | 22D00072MSR JCT - CANDA - HONDAGUA ROMA POINT - QUEZON ROAD, INCL. BRIDGE (QUEZON SIDE), QUEZON | Region IV-A | Region IV-A | Completed | ₱96.3M | 100% | High risk64 | —-0.053 |
| 25 | 18G00061TALABAN BR. (B00367NR) ALONG BACOLOD SOUTH RD | Region VI | Region VI | Completed | ₱136.5M | 100% | High risk64 | —-0.014 |