Opening the dossier…
Opening the dossier…
Contractor dossier
376 projects on file, including joint ventures this contractor is part of.
Total projects
376
Total budget
₱6.9B
Average progress
94.5%
Completion rate
83.0%
Average risk score
38.9
Medium risk on average, out of 100
Flagged as unusual
34
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 341 | ₱5.4B | 38.4 | 26 | 95.1% |
| Region XII | 28 | ₱1.2B | 36.9 | 6 | 88.2% |
| Region XIII | 4 | ₱240.4M | 80.2 | 2 | 87.8% |
| Region X | 2 | ₱35.2M | 59.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱8.4M | 43.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 148 | ₱1B | 26.9 | 4 | 98.4% |
| Roads | 110 | ₱2.4B | 41.3 | 2 | 94.9% |
| Flood Control and Drainage | 45 | ₱1.8B | 47.5 | 2 | 95.5% |
| Bridges | 29 | ₱459M | 39.3 | 3 | 93.4% |
| Water Provision and Storage | 17 | ₱97.1M | 34.4 | 3 | 89.8% |
| OTHER | 15 | ₱310.4M | 74.2 | 9 | 82.7% |
| GAA 2025 SSP | 8 | ₱377.1M | 95.0 | 8 | 64.3% |
| GAA 2025 OO-2 | 3 | ₱282.6M | 91.4 | 2 | 73.1% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 94.6 | 1 | 29.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25MC0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 2, BARANGAY LUNA NORTE, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 62% | High risk92 | Flagged0.006 |
| 25MC0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 1, BARANGAY LUNA SUR, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 68% | High risk92 | Flagged0.006 |
| 25NH0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY ANTAO, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 89% | High risk90 | —-0.003 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 24K00225CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, PUROK BALAYONG, BARANGAY MARANDING, LALA, LANAO DEL NORTE | Region X | Region X | On-Going | ₱17.7M | 100% | High risk73 | —-0.013 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 23LB0041CONSTRUCTION OF CONCRETE ROAD - MALABOG-PAQUIBATO ROAD LEADING TO MEGKAWAYAN PEAK RESORT, MALABOG, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LG0111CONSTRUCTION OF CONCRETE ROAD, BRGY.PINTATAGAN TO BRGY. MARAGATAS ROAD,BRGY. PINTATAGAN, BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱79.6M | 19% | Medium risk58 | Flagged0.044 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 24L00298CONSTRUCTION OF WHITE COPRA (RBDO DE HUSKED NUT BUILDING), PANABO CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱29.7M | 0% | Medium risk42 | Flagged0.034 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25LK0015CONSTRUCTION OF DRAINAGE STRUCTURE - JCT. ACACIA ROAD - PUROK NEW VISAYAS LEADING TO SAFARI LAND CROCODILE PARK, BRGY. ACACIA, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱9.5M | 31% | High risk72 | Flagged0.022 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 23LG0080CONSTRUCTION (CONCRETING) LOCAL BRIDGE OF (HANGING BRIDGE), BRGY. TAGUGPO, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱4.9M | 9% | Medium risk48 | Flagged0.021 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 17LD0063CONSTRUCTION OF SAN ROQUE BRIDGE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱13.5M | 100% | Medium risk37 | Flagged0.018 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 24MC0036CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BULATUKAN RIVER, STA. 62+800 - STA. 63+140 R/S, BARANGAY NEW BULATUKAN, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.3M | 100% | Low risk29 | —-0.071 |
| 252 | 24MC0039CONSTRUCTION OF REVETMENT ALONG DOLES RIVER STA. 0+250 - STA. 0+450 B/S (WITH OVERFLOW BRIDGE), BARANGAY DOLES, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk28 | —-0.068 |
| 253 | 23MC0003CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1683+227 - K1683+300, ARAKAN, NORTH COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk28 | —-0.088 |
| 254 | 23MC0002CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1682+390 - K1682+490, ARAKAN, NORTH COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk28 | —-0.088 |
| 255 | 24MG0105OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND-MIDSAYAP-MARBEL RD-K1770+000-K1777+000 | Region XII | South Cotabato 2nd DEO | Completed | ₱38.7M | 100% | Low risk28 | —-0.088 |
| 256 | 21MC0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG MAKILALA-ALLAH VALLEY RD K1611+(-009) - K1611+825, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Terminated | ₱180.8K | 100% | Low risk27 | —-0.057 |
| 257 | 21MI0010PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - KIDAPAWAN - CALUNASAN - MLANG RD. - K1637+000 - K1637+751 | Region XII | Cotabato 3rd DEO | Completed | ₱15.7M | 100% | Low risk26 | —-0.088 |
| 258 | 21MI0012PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAKILALA - ALLAH VALLEY RD - K1634+440 -K1635+251, MLANG, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱17M | 100% | Low risk26 | —-0.087 |
| 259 | 21MI0011PREVENTIVE MAINTENANCE OF ROAD ASPHALT OVERLAY - BANISILAN - GUILING - ALAMADA - LIBUNGAN RD. - K1632+000 - K1632+318 | Region XII | Cotabato 3rd DEO | Completed | ₱13.5M | 100% | Low risk26 | —-0.090 |
| 260 | 24ME0063ASPHALT OVERLAY ALONG SARANGANI - SULTAN KUDARAT COASTAL RD - K1722+748 - K1723+723, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱36.4M | 100% | Low risk26 | —-0.082 |
| 261 | 21MI0090PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MATALAM - MLANG - BAGONTAPAY JCT. RD. K1654+648 - K1655+750 | Region XII | Cotabato 3rd DEO | Completed | ₱23.2M | 100% | Low risk26 | —-0.089 |
| 262 | 21MC0010CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (TUAEL SECTION), L/S, BRGY. TUAEL, PRESIDENT ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱21.5M | 100% | Low risk26 | —-0.069 |
| 263 | 17LD0059CLUSTER II - CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) 1. JOLENCIO R. ALBERCA ES, BRGY. TRES DE MAYO, DIGOS CITY 2. BINATON ES, BRGY. BINATON, DIGOS CITY 3. G. REUSURA CES, BRGY. KIAGOT, DIGOS CITY 4. DOMINGO V. ABAWAG, SR., BRGY. TIGUMAN, DIGOS | Region XI | Davao del Sur DEO | Completed | ₱3.2M | 100% | Low risk26 | —-0.031 |
| 264 | 21MI0008PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAKILALA - ALLAH VALLEY RD. - K1637+962 - K1638+265 | Region XII | Cotabato 3rd DEO | Completed | ₱6.4M | 100% | Low risk26 | —-0.086 |
| 265 | 19MC0042CONSTRUCTION OF CONCRETE ROAD-ACCESS ROAD LEADING TO TWIN FALLS, BRGY . MANONGOL, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱11.8M | 100% | Low risk25 | —-0.088 |
| 266 | 21MC0012PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG KIDAPAWAN-MAGPET-PANGAOAN RD K1625+000 - K1625+701, MAGPET, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱15.1M | 100% | Low risk25 | —-0.089 |
| 267 | 23ME0017ASPHALT OVERLAY ALONG SDSCR K1741+312 - K1742+000, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱27.1M | 100% | Low risk24 | —-0.081 |
| 268 | 20M00174CONSTRUCTION OF PEDESTIAN OVERPASS ALONG MAKILALA-ALLAH VALLEY ROAD, MARIANO UNTAL NATIONAL HIGH SCHOOL-BAGONTAPAY PUBLIC MARKET SECTION, BARANGAY BAGONTAPAY, MLANG, NORTH COTABATO | Region XII | Region XII | Completed | ₱19.8M | 100% | Low risk24 | —-0.053 |
| 269 | 19MC0171CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG MATALAM-M'LANG-BAGONTAPAY ROAD, SOUTHERN BAPTIST COLLEGE (SBC) SECTION (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱19.6M | 100% | Low risk24 | —-0.057 |
| 270 | 21MI0095CONSTRUCTION OF LOCAL BRIDGE (PEDESTRIAN OVERPASS), BARANGAY POBLACION, MATALAM, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱24.1M | 100% | Low risk24 | —-0.054 |
| 271 | 21MI0094CONSTRUCTION OF LOCAL BRIDGE (PEDESTRIAN OVERPASS), BARANGAY POBLACION, MATALAM, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱24.1M | 100% | Low risk24 | —-0.057 |
| 272 | 20LA0320CONSTRUCTION OF WATER SYSTEM, TAGLAWIG MACO COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱2.9M | 100% | Low risk22 | —-0.053 |
| 273 | 21LC0035NRJ SURIGAO DAVAO COASTAL ROAD TO HIJO CADASTRAL CONNECTING TAGUM CITY OVERLAND TRANSPORT TERMINAL IN SUPPORT OF BUSINESS PROCESSING OUTSOURCING, COCONUT FARM AND RENEWABLE ENERGY INDUSTRIES, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱4.4M | 100% | Low risk22 | —-0.088 |
| 274 | 19LA0357CONSTRUCTION OF WATER SYSTEM AT RELOCATION SITE, BRGY. FUENTES, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱2.9M | 100% | Low risk21 | —-0.050 |
| 275 | 25L00032REHABILITATION/MAJOR REPAIR OF BRIDGE - BUNAWAN BRIDGE 2 (B01619MN) ALONG MAHARLIKA HIGHWAY, DAVAO CITY | Region XI | Region XI | On-Going | ₱1.9M | 100% | Low risk21 | —-0.032 |