Contractor dossier
376 projects on file, including joint ventures this contractor is part of.
Total projects
376
Total budget
₱6.9B
Average progress
94.5%
Completion rate
83.0%
Average risk score
38.9
Medium risk on average, out of 100
Flagged as unusual
34
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 341 | ₱5.4B | 38.4 | 26 | 95.1% |
| Region XII | 28 | ₱1.2B | 36.9 | 6 | 88.2% |
| Region XIII | 4 | ₱240.4M | 80.2 | 2 | 87.8% |
| Region X | 2 | ₱35.2M | 59.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱8.4M | 43.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 148 | ₱1B | 26.9 | 4 | 98.4% |
| Roads | 110 | ₱2.4B | 41.3 | 2 | 94.9% |
| Flood Control and Drainage | 45 | ₱1.8B | 47.5 | 2 | 95.5% |
| Bridges | 29 | ₱459M | 39.3 | 3 | 93.4% |
| Water Provision and Storage | 17 | ₱97.1M | 34.4 | 3 | 89.8% |
| OTHER | 15 | ₱310.4M | 74.2 | 9 | 82.7% |
| GAA 2025 SSP | 8 | ₱377.1M | 95.0 | 8 | 64.3% |
| GAA 2025 OO-2 | 3 | ₱282.6M | 91.4 | 2 | 73.1% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 94.6 | 1 | 29.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25MC0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 2, BARANGAY LUNA NORTE, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 62% | High risk92 | Flagged0.006 |
| 25MC0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 1, BARANGAY LUNA SUR, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 68% | High risk92 | Flagged0.006 |
| 25NH0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY ANTAO, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 89% | High risk90 | —-0.003 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 24K00225CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, PUROK BALAYONG, BARANGAY MARANDING, LALA, LANAO DEL NORTE | Region X | Region X | On-Going | ₱17.7M | 100% | High risk73 | —-0.013 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 23LB0041CONSTRUCTION OF CONCRETE ROAD - MALABOG-PAQUIBATO ROAD LEADING TO MEGKAWAYAN PEAK RESORT, MALABOG, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LG0111CONSTRUCTION OF CONCRETE ROAD, BRGY.PINTATAGAN TO BRGY. MARAGATAS ROAD,BRGY. PINTATAGAN, BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱79.6M | 19% | Medium risk58 | Flagged0.044 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 24L00298CONSTRUCTION OF WHITE COPRA (RBDO DE HUSKED NUT BUILDING), PANABO CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱29.7M | 0% | Medium risk42 | Flagged0.034 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25LK0015CONSTRUCTION OF DRAINAGE STRUCTURE - JCT. ACACIA ROAD - PUROK NEW VISAYAS LEADING TO SAFARI LAND CROCODILE PARK, BRGY. ACACIA, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱9.5M | 31% | High risk72 | Flagged0.022 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 23LG0080CONSTRUCTION (CONCRETING) LOCAL BRIDGE OF (HANGING BRIDGE), BRGY. TAGUGPO, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱4.9M | 9% | Medium risk48 | Flagged0.021 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 17LD0063CONSTRUCTION OF SAN ROQUE BRIDGE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱13.5M | 100% | Medium risk37 | Flagged0.018 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 17LA0192CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MACO RIVER AT BRGY. BINUANGAN, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.6M | 100% | Medium risk50 | —-0.046 |
| 52 | 17LA0191CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MACO RIVER AT BRGY. BINUANGAN, MACO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱6.8M | 100% | Medium risk50 | —-0.046 |
| 53 | 25LA0045CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PHASE 2, BARANGAY POBLACION, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49.5M | 100% | Medium risk50 | —-0.053 |
| 54 | 23L00055CONSTRUCTION OF CONCRETE ROAD - MONKAYO - BOSTON ROAD (BOSTON SECTION), DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱46.8M | 100% | Medium risk50 | —-0.075 |
| 55 | 24LF0128CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAHAN-UB RIVER, MANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱57.9M | 100% | Medium risk49 | —-0.063 |
| 56 | 23LB0068CONSTRUCTION OF SOLAR WATER SYSTEM AT BARANGAY CATALUNAN GRANDE, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱9.6M | 6% | Medium risk49 | Flagged0.017 |
| 57 | 23LA0093CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY CABUYUAN, MUNICIPALITY OF MABINI, PROVINCE OF DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱9.8M | 60% | Medium risk48 | Flagged0.003 |
| 58 | 22LA0149CONSTRUCTION OF WATER SYSTEM, PINDASAN, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱7.9M | 100% | Medium risk48 | —-0.050 |
| 59 | 19LA0363CONSTRUCTION OF WATER SYSTEM, TIBAGON, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.054 |
| 60 | 19LD0132CONCRETING OF 3 KILOMETERS ROAD WITH LINE CANAL AT SITIO BALUTAKAY, BRGY. MANAGA, BANSALAN, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱29M | 100% | Medium risk48 | —-0.030 |
| 61 | 22LA0095CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY POBLACION, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.048 |
| 62 | 23LA0096CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY NEW BARILI, MUNICIPALITY OF MACO, PROVINCE OF DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱9.8M | 61% | Medium risk48 | Flagged0.006 |
| 63 | 19LH0116CONCRETING OF BRGY. CARMEN-SITIO TABAK, BRGY. TAWANTAWAN FMR, BRGY. CARMEN AND BRGY. TAWANTAWAN, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱29.8M | 100% | Medium risk48 | —-0.029 |
| 64 | 23LG0080CONSTRUCTION (CONCRETING) LOCAL BRIDGE OF (HANGING BRIDGE), BRGY. TAGUGPO, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱4.9M | 9% | Medium risk48 | Flagged0.021 |
| 65 | 23LD0091ROAD WIDENING-DAVAO-SARANGANI COASTAL RD(MALALAG-MALITA-JAS-G)-K1590+052-K1591+156, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱32.4M | 100% | Medium risk48 | —-0.090 |
| 66 | 22LA0171CONSTRUCTION OF WATER SYSTEM, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.044 |
| 67 | 23LD0111CONSTRUCTION OF 2STY10CL, BAYBAY ELEMENTARY SCHOOL, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱50M | 100% | Medium risk47 | —-0.035 |
| 68 | 19LA0366CONSTRUCTION OF WATER SYSTEM, CABIDIANAN, NABUNTURAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.049 |
| 69 | 23LA0109CONCRETING OF BRGY. GOLDEN VALLEY FMR PHASE III, BRGY. GOLDEN VALLEY, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.028 |
| 70 | 19LA0359CONSTRUCTION OF WATER SYSTEM AT MAWAB PUBLIC MARKET, MAWAB, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.049 |
| 71 | 21LB0425CONSTRUCTION OF ROAD AT PUROK 12 CAMIA,BRGY. PAÑALUM, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱19.9M | 100% | Medium risk47 | —-0.034 |
| 72 | 25L00084RETROFITTING/STRENGTHENING OF BRIDGE - PILAN PARALLEL BR. (B01997MN) ALONG MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱13.6M | 14% | Medium risk47 | —-0.003 |
| 73 | 24LF0056SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD-K1638+170-K1638+270, CARAGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱40.1M | 100% | Medium risk47 | —-0.077 |
| 74 | 25L00083RETROFITTING/STRENGTHENING OF BRIDGE - INAWAYAN BR. (B01491MN) ALONG MAHARLIKA HIGHWAY (DAVAO CITY - JCT DIGOS SECT), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱6.2M | 84% | Medium risk47 | —-0.027 |
| 75 | 20LD0102CONSTRUCTION OF PEDESTRIAN OVERPASS, DAVAO-COTABATO ROAD, BATO E/S, BATO, STA. CRUZ, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.057 |