Contractor dossier
376 projects on file, including joint ventures this contractor is part of.
Total projects
376
Total budget
₱6.9B
Average progress
94.5%
Completion rate
83.0%
Average risk score
38.9
Medium risk on average, out of 100
Flagged as unusual
34
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 341 | ₱5.4B | 38.4 | 26 | 95.1% |
| Region XII | 28 | ₱1.2B | 36.9 | 6 | 88.2% |
| Region XIII | 4 | ₱240.4M | 80.2 | 2 | 87.8% |
| Region X | 2 | ₱35.2M | 59.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱8.4M | 43.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 148 | ₱1B | 26.9 | 4 | 98.4% |
| Roads | 110 | ₱2.4B | 41.3 | 2 | 94.9% |
| Flood Control and Drainage | 45 | ₱1.8B | 47.5 | 2 | 95.5% |
| Bridges | 29 | ₱459M | 39.3 | 3 | 93.4% |
| Water Provision and Storage | 17 | ₱97.1M | 34.4 | 3 | 89.8% |
| OTHER | 15 | ₱310.4M | 74.2 | 9 | 82.7% |
| GAA 2025 SSP | 8 | ₱377.1M | 95.0 | 8 | 64.3% |
| GAA 2025 OO-2 | 3 | ₱282.6M | 91.4 | 2 | 73.1% |
| GAA 2025 OO-1 | 1 | ₱93.6M | 94.6 | 1 | 29.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25MC0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 2, BARANGAY LUNA NORTE, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 62% | High risk92 | Flagged0.006 |
| 25MC0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALASILA RIVER PACKAGE 1, BARANGAY LUNA SUR, MAKILALA, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.5M | 68% | High risk92 | Flagged0.006 |
| 25NH0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY ANTAO, CARMEN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 89% | High risk90 | —-0.003 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 24K00225CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, PUROK BALAYONG, BARANGAY MARANDING, LALA, LANAO DEL NORTE | Region X | Region X | On-Going | ₱17.7M | 100% | High risk73 | —-0.013 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 23LB0041CONSTRUCTION OF CONCRETE ROAD - MALABOG-PAQUIBATO ROAD LEADING TO MEGKAWAYAN PEAK RESORT, MALABOG, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LJ0147CONCRETING OF FARM TO MARKET ROAD, PUROK 4, D-5, BARANGAY DUJALI RO PUROK 3, BUGTONG TALISAY BARANGAY DUJALI, BRAULIO E. DUJALI, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱48.2M | 75% | High risk89 | Flagged0.064 |
| 24LC0099CONSTRUCTION OF ROAD CONCRETE, PUROK BINUHI, BRGY. DATU BALONG VIA MAMAON TO PUROK SIABOC, BRGY. PINAMUNO, SAN ISIDRO, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱69.6M | 85% | High risk89 | Flagged0.062 |
| 24LA0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUROK 6 MANGGA, BARANGAY TAGDANGUA, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱7.9M | 88% | High risk83 | Flagged0.057 |
| 25LA0074CONCRETING OF BRGY. MALINAWON FMR (PHASE IV), BRGY. MALINAWON, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.054 |
| 24LG0111CONSTRUCTION OF CONCRETE ROAD, BRGY.PINTATAGAN TO BRGY. MARAGATAS ROAD,BRGY. PINTATAGAN, BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱79.6M | 19% | Medium risk58 | Flagged0.044 |
| 25LA0089CONSTRUCTION OF ROAD, POBLACION, MAWAB TO DIZON AREA, MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.2M | 12% | High risk95 | Flagged0.040 |
| 25LA0068CONSTRUCTION (COMPLETION) OF ADMINISTRATIVE BUILDING, DAVAO DE ORO 1ST DEO, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱19.6M | 16% | High risk73 | Flagged0.034 |
| 24L00298CONSTRUCTION OF WHITE COPRA (RBDO DE HUSKED NUT BUILDING), PANABO CITY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱29.7M | 0% | Medium risk42 | Flagged0.034 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25LK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BUHANGIN CENTRAL ELEM. SCHOOL, BRGY. BUHANGIN PROPER, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱10.7M | 34% | High risk95 | Flagged0.027 |
| 25NH0049CONST. OF SEAWALL, BRGY. ARAS-ASAN, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱66.9M | 89% | High risk95 | Flagged0.022 |
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25LK0015CONSTRUCTION OF DRAINAGE STRUCTURE - JCT. ACACIA ROAD - PUROK NEW VISAYAS LEADING TO SAFARI LAND CROCODILE PARK, BRGY. ACACIA, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱9.5M | 31% | High risk72 | Flagged0.022 |
| 25LK0045CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SIXTO BABAO ELEMENTARY SCHOOL, BARANGAY ILANG, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 3rd DEO | On-Going | ₱19.6M | 73% | High risk95 | Flagged0.021 |
| 23LG0080CONSTRUCTION (CONCRETING) LOCAL BRIDGE OF (HANGING BRIDGE), BRGY. TAGUGPO, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱4.9M | 9% | Medium risk48 | Flagged0.021 |
| 25LA0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱44.5M | 77% | High risk95 | Flagged0.020 |
| 25LK0021CONSTRUCTION OF ROAD, SITIO BANBAN, BARANGAY LUMIAD TO BARANGAY MALABOG, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 72% | High risk95 | Flagged0.020 |
| 25NH0064CONSTRUCTION OF BRIDGE BARANGAY CALAGDAAN, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱38.8M | 74% | High risk95 | Flagged0.019 |
| 17LD0063CONSTRUCTION OF SAN ROQUE BRIDGE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱13.5M | 100% | Medium risk37 | Flagged0.018 |
| 24L00054RECONSTRUCTION TO CONCRETE PAVEMENT - DAANG MAHARLIKA (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047, K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.5M | 88% | High risk73 | Flagged0.018 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21LA0124ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG ASUNCION - SAN ISIDRO - LAAK - VERUELA RD. (S01377MN) LAAK, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.088 |
| 127 | 20LA0135REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL GYM) MAWAB, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.083 |
| 128 | 22LA0166CONSTRUCTION OF MULTI-PURPOSE BUILDING, (MUNICIPAL GYM) MAWAB, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.084 |
| 129 | 20LH0027REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1641+361-K1641+400 | Region XI | Davao City 2nd DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.092 |
| 130 | 19LB0015OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG ABS-CBN QUIMPO BOULEVARD DIV. RD (S00036MN) CW1: K1511+(-123) -K1511+(-063), K1511+(-095) - K1511+072; CW2 - K1515+240 | Region XI | Davao City DEO | Completed | ₱5.7M | 100% | Medium risk46 | —-0.090 |
| 131 | 21LA0144CONSTRUCTION OF ROAD, BRGY. PANGIBIRAN, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.089 |
| 132 | 21LA0037LIBUDON ROAD LEADING TO LAKI POOL INLAND RESORT, BRGY. LUBUDON, MABINI, COMPOSTELA VALLEY | Region XI | Davao de Oro 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.090 |
| 133 | 21LG0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAMBALEON CREEK, SAN ISIDRO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.066 |
| 134 | 21LG0026CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LA UNION CREEK, SAN ISIDRO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.066 |
| 135 | 23LA0071IMPROVEMENT OF CENTER ISLANDS INCLUDING STREETLIGHTS, BRGY POBLACION, NABUNTURAN TO BRGY. MANAT, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.035 |
| 136 | 22LB0318CONSTRUCTION OF ROAD INCLUDING DRAINAGE,BARANGAY 27-C, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.087 |
| 137 | 23LB0027CONSTRUCTION OF ROAD, BARANGAY TALOMO, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.092 |
| 138 | 21LG0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BITAOGAN RIVER SAN ISIDRO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.066 |
| 139 | 19LA0034ROAD WIDENING-ALONG DAANG MAHARLIKA (MN) (S00126MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱5.9M | 100% | Medium risk45 | —-0.083 |
| 140 | 22LB0316CONSTRUCTION OF ROAD AT SITIO GUADALUPE,BRGY. CATALUNAN GRANDE, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.093 |
| 141 | 22LB0433ROAD WIDENING - MABUHAY-PANALUM - PAQUIBATO RD - K1524 + 592 - K1524 + 811, K1527 + 926 - K1527 + 930 | Region XI | Davao City DEO | Completed | ₱10.8M | 100% | Medium risk45 | —-0.094 |
| 142 | 19LF0033JCT. NAT'L HIGHWAY TO BRGY. ALEGRIA PROPER TO BRGY. SAN VICENTE, CONNECTING CATEEL PUBLIC TRANSPORT TERMINAL TO COCONUT, RICE AND CORN PROCESSING IN SUPPORT OF AGRIBUSINESS: COCONUT, RICE AND CORN INDUSTRY, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.076 |
| 143 | 19LF0021JCT. SAN ANTONIO - BAYBAY LEADING TO CREAMSAND LONGBEACH, BRGY. BAYBAY, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.076 |
| 144 | 24L00064REHABILITATION OF PAVED ROAD - DAANG MAHARLIKA (MN) - K1391+856 - K1392+256, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱9.9M | 93% | Medium risk45 | —-0.041 |
| 145 | 19LA0141CONCRETING OF NATIONAL HIGHWAY JUNCTION TO BRGY. ANISLAGAN, NABUNTURAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.084 |
| 146 | 20LA0014LINDA ROAD LEADING TO ECOTOURISM PARK, BRGY. LINDA, NABUNTURAN COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱13.9M | 100% | Medium risk45 | —-0.085 |
| 147 | 21LA0018LINDA-SASA ROAD LEADING TO ECOTOURISM PARK, NABUNTURAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.085 |
| 148 | 22LB0151CONSTRUCTION OF ROAD FROM SITIO GATUNGON TO SABANG SITA, BARANGAY TAPAK, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.093 |
| 149 | 19LB0194CONSTRUCTION OF MULTI-PURPOSE BUILDING (DOJ BUILDING AT HALL OF JUSTICE COMPOUND), BRGY. BUCANA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱24.8M | 100% | Medium risk45 | —-0.081 |
| 150 | 22LB0166CONSTRUCTION OF ROAD, BARANGAY PAQUIBATO PROPER, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.094 |