Contractor dossier
59 projects on file, including joint ventures this contractor is part of.
Total projects
59
Total budget
₱3.4B
Average progress
90.2%
Completion rate
55.9%
Below 70%
Average risk score
59.8
Medium risk on average, out of 100
Flagged as unusual
14
23.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 59 | ₱3.4B | 59.8 | 14 | 90.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 17 | ₱159.1M | 45.9 | 0 | 100.0% |
| Roads | 14 | ₱776.4M | 52.4 | 0 | 87.6% |
| OTHER | 11 | ₱875.2M | 85.5 | 11 | 87.6% |
| Flood Control and Drainage | 11 | ₱1.2B | 62.4 | 0 | 92.4% |
| Bridges | 4 | ₱97.5M | 49.8 | 1 | 75.0% |
| GAA 2025 SSP | 1 | ₱24.5M | 95.6 | 1 | 55.0% |
| GAA 2025 OO-1 | 1 | ₱241.2M | 94.8 | 1 | 57.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IG0050CONSTRUCTION OF JUBASAN BRIDGE, BARANGAY JUBASAN, INOPACAN, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱24.5M | 55% | High risk96 | Flagged0.021 |
| 25I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | On-Going | ₱241.2M | 57% | High risk95 | Flagged0.034 |
| 25IB0135CONCRETING OF BRGY. CAISAWAN TO SITIO JUMALAG FMR, BRGY. CAISAWAN, BALANGKAYAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 100% | High risk90 | Flagged0.039 |
| 24IB0141CONSTRUCTION (COMPLETION) OF DPWH BUILDING EASTERN SAMAR DEO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱19.3M | 61% | High risk89 | Flagged0.055 |
| 25IB0131CONCRETING OF BRGY. GARAWON TO BRGY. CACATMONAN FMR, BRGY. GARAWON AND BRGY. CACATMONAN, HERNANI, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 87% | High risk89 | Flagged0.047 |
| 25IB0129CONCRETING OF BRGY. 02 POBLACION TO BRGY. SAN ROQUE TO BRGY. BANUYO FMR, BRGY. 02 POBLACION, SAN ROQUE AND BANUYO, MERCEDES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 99% | High risk88 | Flagged0.042 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 24I00061SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BAROBO BRIDGE, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 80% | High risk85 | Flagged0.027 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 23IL0105SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF HIMAKILO BRIDGE, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱49M | 91% | High risk81 | Flagged0.004 |
| 23IC0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.006 |
| 24I00031CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TAWAGAN (ZONE 3), ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk69 | —-0.015 |
| 24I00134CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 91% | High risk69 | —-0.011 |
| 24I00063CONSTRUCTION OF BARANGAY SAN EDUARDO FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138.7M | 81% | High risk68 | —-0.014 |
| 24I00034CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURAK (ZONE 2 & 3), ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138M | 94% | High risk68 | —-0.015 |
| 24I00066CONSTRUCTION OF BARANGAY MALINGON FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱136.5M | 96% | High risk67 | —-0.019 |
| 25I00164CLUSTER 1: 1. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PALO - PASTRANA - STA. FE BY-PASS RD, PACKAGE A 2. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATION | Region VIII | Region VIII | On-Going | ₱289.4M | 21% | High risk65 | —-0.001 |
| 23I00087CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TIGBAO RIVER, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱111M | 100% | High risk64 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IB0141CONSTRUCTION (COMPLETION) OF DPWH BUILDING EASTERN SAMAR DEO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱19.3M | 61% | High risk89 | Flagged0.055 |
| 25IB0131CONCRETING OF BRGY. GARAWON TO BRGY. CACATMONAN FMR, BRGY. GARAWON AND BRGY. CACATMONAN, HERNANI, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 87% | High risk89 | Flagged0.047 |
| 25IB0129CONCRETING OF BRGY. 02 POBLACION TO BRGY. SAN ROQUE TO BRGY. BANUYO FMR, BRGY. 02 POBLACION, SAN ROQUE AND BANUYO, MERCEDES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 99% | High risk88 | Flagged0.042 |
| 25IB0135CONCRETING OF BRGY. CAISAWAN TO SITIO JUMALAG FMR, BRGY. CAISAWAN, BALANGKAYAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 100% | High risk90 | Flagged0.039 |
| 25I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | On-Going | ₱241.2M | 57% | High risk95 | Flagged0.034 |
| 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 24I00061SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BAROBO BRIDGE, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 80% | High risk85 | Flagged0.027 |
| 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 25IG0050CONSTRUCTION OF JUBASAN BRIDGE, BARANGAY JUBASAN, INOPACAN, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱24.5M | 55% | High risk96 | Flagged0.021 |
| 24IC0012BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - RIZAL BR. (B00059LT) ALONG BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱17.6M | 0% | Medium risk49 | Flagged0.009 |
| 23IC0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.006 |
| 23IL0105SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF HIMAKILO BRIDGE, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱49M | 91% | High risk81 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IG0050CONSTRUCTION OF JUBASAN BRIDGE, BARANGAY JUBASAN, INOPACAN, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱24.5M | 55% | High risk96 | Flagged0.021 |
| 2 | 25I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | On-Going | ₱241.2M | 57% | High risk95 | Flagged0.034 |
| 3 | 25IB0135CONCRETING OF BRGY. CAISAWAN TO SITIO JUMALAG FMR, BRGY. CAISAWAN, BALANGKAYAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 100% | High risk90 | Flagged0.039 |
| 4 | 24IB0141CONSTRUCTION (COMPLETION) OF DPWH BUILDING EASTERN SAMAR DEO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱19.3M | 61% | High risk89 | Flagged0.055 |
| 5 | 25IB0131CONCRETING OF BRGY. GARAWON TO BRGY. CACATMONAN FMR, BRGY. GARAWON AND BRGY. CACATMONAN, HERNANI, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱14.9M | 87% | High risk89 | Flagged0.047 |
| 6 | 25IB0129CONCRETING OF BRGY. 02 POBLACION TO BRGY. SAN ROQUE TO BRGY. BANUYO FMR, BRGY. 02 POBLACION, SAN ROQUE AND BANUYO, MERCEDES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 99% | High risk88 | Flagged0.042 |
| 7 | 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 8 | 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 9 | 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 10 | 24I00061SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BAROBO BRIDGE, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.6M | 80% | High risk85 | Flagged0.027 |
| 11 | 23I00140ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS -LEYTE-SAMAR INTER PROV'L. RD. - K0908+000 - K0909+460, K0911+140 - K0912+040, K0912+420 - K0912+603, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱144.6M | 90% | High risk83 | Flagged0.030 |
| 12 | 23IL0105SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF HIMAKILO BRIDGE, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱49M | 91% | High risk81 | Flagged0.004 |
| 13 | 23IC0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.006 |
| 14 | 24I00031CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TAWAGAN (ZONE 3), ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱144.7M | 94% | High risk69 | —-0.015 |
| 15 | 24I00134CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 91% | High risk69 | —-0.011 |
| 16 | 24I00063CONSTRUCTION OF BARANGAY SAN EDUARDO FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138.7M | 81% | High risk68 | —-0.014 |
| 17 | 24I00034CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURAK (ZONE 2 & 3), ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱138M | 94% | High risk68 | —-0.015 |
| 18 | 24I00066CONSTRUCTION OF BARANGAY MALINGON FLOOD CONTROL STRUCTURE, ORAS, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱136.5M | 96% | High risk67 | —-0.019 |
| 19 | 25I00164CLUSTER 1: 1. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PALO - PASTRANA - STA. FE BY-PASS RD, PACKAGE A 2. SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATION | Region VIII | Region VIII | On-Going | ₱289.4M | 21% | High risk65 | —-0.001 |
| 20 | 23I00087CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TIGBAO RIVER, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱111M | 100% | High risk64 | —-0.066 |
| 21 | 23I00086SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF REVETMENT ALONG TIGBAO RIVER, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk64 | —-0.069 |
| 22 | 23I00020CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SOLANO RIVER (UPSTREAM), BRGY. SAN MIGUEL AND BRGY. ATIPOLO, TANAUAN, LEYTE | Region VIII | Region VIII | On-Going | ₱95.7M | 61% | High risk63 | —-0.002 |
| 23 | 24IC0066CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY GUINGAUAN, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.068 |
| 24 | 22I00089SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF DOLORES - MASLOG ROAD, EASTERN SAMAR LD | Region VIII | Region VIII | On-Going | ₱95.4M | 31% | High risk61 | —-0.013 |
| 25 | 23I00110ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD. - (S00066LT) K097+(-310) - K0927+(-252), LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱96.3M | 95% | High risk60 | —-0.037 |