Contractor dossier
38 projects on file, including joint ventures this contractor is part of.
Total projects
38
Total budget
₱1.4B
Average progress
88.9%
Completion rate
63.2%
Below 70%
Average risk score
59.3
Medium risk on average, out of 100
Flagged as unusual
5
13.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 38 | ₱1.4B | 59.3 | 5 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 13 | ₱655.5M | 61.6 | 1 | 85.3% |
| Roads | 12 | ₱212.8M | 50.6 | 0 | 97.0% |
| Buildings and Facilities | 5 | ₱99.7M | 50.2 | 0 | 99.0% |
| Water Provision and Storage | 3 | ₱29.4M | 51.8 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱142.1M | 95.3 | 2 | 30.5% |
| OTHER | 2 | ₱151.5M | 90.1 | 2 | 75.1% |
| Bridges | 1 | ₱96.5M | 65.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00163CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, PACKAGE 1, BARANGAY QUIRANGAY , CA | Region V | Region V | On-Going | ₱67.2M | 29% | High risk95 | Flagged0.020 |
| 25F00197CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAGÑAY RIVER FLOOD MITIGATION STRUCTURE ALONG BAR | Region V | Region V | On-Going | ₱74.9M | 32% | High risk95 | Flagged0.020 |
| 24FB0264CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF DIKE STRUCTURES ALONG TAGAYTAY-QUIRANGAY RIVER PACKAGE 2, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 93% | High risk92 | Flagged0.046 |
| 24FK0105RE-POST CLUSTER XXX- 1.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN MELECIO J. LAROSA ELEMENTARY SCHOOL, BRGY. SAMPALOC, SOROSOGN CITY 2.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN OUR LADY'S VILLAGE ELEMENTARY SCHOOL, BRGY. BIBINCAHAN, SOR | Region V | Sorsogon DEO | On-Going | ₱57.9M | 58% | High risk88 | Flagged0.050 |
| 24FB0036BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DIKE) WITH DRAINAGE SYSTEM ALONG TAYSAN, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱99M | 100% | High risk70 | —-0.076 |
| 24FB0265CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱46.8M | 69% | High risk70 | Flagged0.011 |
| 19FB0180CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, DARAGA NORTH CENTRAL SCHOOL 4STY16CL, DARAGA (LOCSIN), ALBAY | Region V | Albay 2nd DEO | Completed | ₱68M | 100% | High risk66 | —-0.038 |
| 23FG0060CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG JCT. NATO-SABANG COASTAL ROAD (SABANG-KAWAYNAN BRIDGE) CAMARINES SUR, SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.049 |
| 20FN0068CONCRETING OF LOCAL ROAD, PACO ST., SAN VICENTE NORTE NIÑO JESUS, IRIGA CITY STA. 4+500.00 STA. 5+505.00 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk63 | —-0.067 |
| 25F00144CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD WALL STRUCTURE ALONG BURGOS RIVER, BARANGAY BURGOS, DARAGA, ALBAY, | Region V | Region V | On-Going | ₱57.6M | 26% | High risk62 | —-0.032 |
| 23FB0027BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG TAGAYTAY - LIBOD RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱67.5M | 100% | High risk62 | —-0.085 |
| 23FB0028BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG TAGAYTAY - LIBOD RIVER (PHASE 2), CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
| 24FB0015BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE AND GROUNDSILL, BUDIAO RIVER, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱64.3M | 97% | High risk62 | —-0.049 |
| 23FB0025FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF DIKE ALONG BUSAY RIVER (UPSTREAM OF BRIDGE), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱67.5M | 100% | High risk62 | —-0.085 |
| 23FB0026BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF DIKE ALONG BUSAY RIVER (DOWNSTREAM), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
| 24FO0078CONCRETING OF BRGY. COTMON TO SITIO MAYLANGKA FMR, BRGY. COTMON, POLANGUI, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱14.3M | 90% | High risk62 | —-0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FK0105RE-POST CLUSTER XXX- 1.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN MELECIO J. LAROSA ELEMENTARY SCHOOL, BRGY. SAMPALOC, SOROSOGN CITY 2.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN OUR LADY'S VILLAGE ELEMENTARY SCHOOL, BRGY. BIBINCAHAN, SOR | Region V | Sorsogon DEO | On-Going | ₱57.9M | 58% | High risk88 | Flagged0.050 |
| 24FB0264CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF DIKE STRUCTURES ALONG TAGAYTAY-QUIRANGAY RIVER PACKAGE 2, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 93% | High risk92 | Flagged0.046 |
| 25F00197CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAGÑAY RIVER FLOOD MITIGATION STRUCTURE ALONG BAR | Region V | Region V | On-Going | ₱74.9M | 32% | High risk95 | Flagged0.020 |
| 25F00163CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, PACKAGE 1, BARANGAY QUIRANGAY , CA | Region V | Region V | On-Going | ₱67.2M | 29% | High risk95 | Flagged0.020 |
| 24FB0265CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱46.8M | 69% | High risk70 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25F00163CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, PACKAGE 1, BARANGAY QUIRANGAY , CA | Region V | Region V | On-Going | ₱67.2M | 29% | High risk95 | Flagged0.020 |
| 2 | 25F00197CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAGÑAY RIVER FLOOD MITIGATION STRUCTURE ALONG BAR | Region V | Region V | On-Going | ₱74.9M | 32% | High risk95 | Flagged0.020 |
| 3 | 24FB0264CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF DIKE STRUCTURES ALONG TAGAYTAY-QUIRANGAY RIVER PACKAGE 2, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 93% | High risk92 | Flagged0.046 |
| 4 | 24FK0105RE-POST CLUSTER XXX- 1.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN MELECIO J. LAROSA ELEMENTARY SCHOOL, BRGY. SAMPALOC, SOROSOGN CITY 2.) CONST. OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN OUR LADY'S VILLAGE ELEMENTARY SCHOOL, BRGY. BIBINCAHAN, SOR | Region V | Sorsogon DEO | On-Going | ₱57.9M | 58% | High risk88 | Flagged0.050 |
| 5 | 24FB0036BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DIKE) WITH DRAINAGE SYSTEM ALONG TAYSAN, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱99M | 100% | High risk70 | —-0.076 |
| 6 | 24FB0265CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG QUIRANGAY RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱46.8M | 69% | High risk70 | Flagged0.011 |
| 7 | 19FB0180CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, DARAGA NORTH CENTRAL SCHOOL 4STY16CL, DARAGA (LOCSIN), ALBAY | Region V | Albay 2nd DEO | Completed | ₱68M | 100% | High risk66 | —-0.038 |
| 8 | 23FG0060CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG JCT. NATO-SABANG COASTAL ROAD (SABANG-KAWAYNAN BRIDGE) CAMARINES SUR, SAN JOSE, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱96.5M | 100% | High risk65 | —-0.049 |
| 9 | 20FN0068CONCRETING OF LOCAL ROAD, PACO ST., SAN VICENTE NORTE NIÑO JESUS, IRIGA CITY STA. 4+500.00 STA. 5+505.00 | Region V | Camarines Sur 5th DEO | Completed | ₱9.4M | 100% | High risk63 | —-0.067 |
| 10 | 25F00144CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD WALL STRUCTURE ALONG BURGOS RIVER, BARANGAY BURGOS, DARAGA, ALBAY, | Region V | Region V | On-Going | ₱57.6M | 26% | High risk62 | —-0.032 |
| 11 | 23FB0027BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG TAGAYTAY - LIBOD RIVER, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱67.5M | 100% | High risk62 | —-0.085 |
| 12 | 23FB0028BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES CONSTRUCTION OF ROAD DIKE STRUCTURE ALONG TAGAYTAY - LIBOD RIVER (PHASE 2), CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
| 13 | 24FB0015BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DIKE AND GROUNDSILL, BUDIAO RIVER, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱64.3M | 97% | High risk62 | —-0.049 |
| 14 | 23FB0025FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF DIKE ALONG BUSAY RIVER (UPSTREAM OF BRIDGE), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱67.5M | 100% | High risk62 | —-0.085 |
| 15 | 23FB0026BIP: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF DIKE ALONG BUSAY RIVER (DOWNSTREAM), DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱57.9M | 100% | High risk62 | —-0.086 |
| 16 | 24FO0078CONCRETING OF BRGY. COTMON TO SITIO MAYLANGKA FMR, BRGY. COTMON, POLANGUI, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱14.3M | 90% | High risk62 | —-0.010 |
| 17 | 24FO0107CONCRETING OF ZONE 7, BRGY. MAYSUA TO BRGY. DANAO FMR, BRGY. MAYSUA AND BRGY. DANAO, POLANGUI, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱14.4M | 73% | Medium risk60 | —-0.006 |
| 18 | 25F00284CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD WALL STRUCTURE ALONG NAMANTAO RIVER, DARAGA, ALBAY, DARAGA, ALBAY (2 | Region V | Region V | On-Going | ₱28.8M | 37% | Medium risk58 | —-0.037 |
| 19 | 24FB0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF RIVER DIKE, BARANGAY BALIGANG, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱24.1M | 96% | Medium risk58 | —-0.050 |
| 20 | 24FB0056BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF RIVER DIKE ALONG BRGY. ILAWOD, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱29.7M | 91% | Medium risk58 | —-0.047 |
| 21 | 24FB0057BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF RIVER DIKE ALONG BRGY. LIBOD, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱29.7M | 92% | Medium risk58 | —-0.047 |
| 22 | 23FB0116SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BUSAY-CULLAT MALOBAGO RIVER, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱24.5M | 100% | Medium risk58 | —-0.086 |
| 23 | 24FG0057REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0566+173.00 - K0568+920.00 CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱48.3M | 100% | Medium risk55 | —-0.099 |
| 24 | 23FG0078REHAB/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0556+240.00 - K0556+829.00; K0557+432.00 - K0557+806.00; K0558+000.00 - K0558+760.00 CARAMOAN, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49M | 100% | Medium risk55 | —-0.099 |
| 25 | 23FO0090CONCRETING OF ZONE 6 - SITIO PENAFRANCIA, BRGY. NAPO TO BRGY. PONSO FMR, BRGY. NAPO AND BRGY. PONSO, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱11.5M | 100% | Medium risk54 | —-0.051 |