Contractor dossier
130 projects on file, including joint ventures this contractor is part of.
Total projects
130
Total budget
₱9.9B
Average progress
98.9%
Completion rate
86.9%
Average risk score
52.8
Medium risk on average, out of 100
Flagged as unusual
9
6.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 73 | ₱4.3B | 51.1 | 0 | 99.2% |
| Region XI | 26 | ₱2B | 52.1 | 5 | 99.3% |
| Central Office | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| Region XIII | 6 | ₱488.3M | 43.4 | 1 | 100.0% |
| Region III | 4 | ₱216.3M | 35.9 | 1 | 99.0% |
| Region X | 3 | ₱291.7M | 55.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱289.2M | 66.2 | 0 | 100.0% |
| Region VI | 2 | ₱434.2M | 64.0 | 1 | 79.9% |
| Region V | 2 | ₱187.4M | 62.4 | 0 | 100.0% |
| Region XII | 2 | ₱240.2M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 90 | ₱6.4B | 53.1 | 2 | 99.3% |
| Roads | 21 | ₱1.2B | 49.5 | 0 | 100.0% |
| Buildings and Facilities | 7 | ₱837.9M | 50.8 | 1 | 93.6% |
| Bridges, Roads | 5 | ₱599.4M | 59.3 | 3 | 98.1% |
| Bridges | 4 | ₱329.4M | 46.4 | 2 | 99.3% |
| OTHER | 3 | ₱575.6M | 71.9 | 1 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20O00074REPLACEMENT OF TWO (2) BOX CULVERT ALONG LONGOS CREEK LEADING TO LONGOS PUMPING STATION AND REHABILITATION OF BOX CULVERT AT P. AQUINO AVE., BRGY. LONGOS, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱161.1M | 100% | High risk77 | —-0.053 |
| 22O00073CONSTRUCTION OF PUMPING STATION AND IMPROVEMENT OF EXISTING FACILITIES AT LAKANDULA DRAINAGE MAIN CORNER R-10 AND PACHECO DRAINAGE MAIN CORNER R-10, TONDO, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱180.8M | 100% | High risk76 | —-0.043 |
| 19Z00035PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Central Office | Flood Control Management Cluster | Completed | ₱279.6M | 100% | High risk76 | —-0.039 |
| 20O00065REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE I PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱92.3M | 100% | High risk75 | —-0.070 |
| 17OB0419REVETMENT AND DREDGING WORKS ALONG SALAPAN CREEK, REVETMENT LEFT AND RIGHT BANK (STA. 1+633.977 TO STA. 1+834.710) DREDGING (STA. 1+700 TO STA. 1+800 AND STA. 1+900 TO STA. 2+300) | Central Office | Flood Control Management Cluster | Completed | ₱93.3M | 100% | High risk74 | —-0.048 |
| 20O00090CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER: ACACIA PS TO PNR, PNR TO MCARTHUR BRIDGE, MCARTHUR BRIDGE TO BAILEY BRIDGE, BAILEY BRIDGE TO MALABON BOUNDARY, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱74.8M | 100% | High risk72 | —-0.021 |
| 20O00091CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER, C4 ROAD, LONGOS PS TO MALABON BRIDGE, TONSUYA-MALABON BRIDGE, NIUGAN, LAMBINGAN BRIDGE, REMIGIO (MAYSILO), MUZON, IBABA, SAN AGUSTIN, TANONG, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱77.2M | 93% | High risk72 | —-0.017 |
| 21O00108CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-NAVOTAS RIVER, (BARANGAY TAÑONG UP TO BARANGAY HULONG DUHAT), MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱77.8M | 100% | High risk72 | —-0.062 |
| 20O00066REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE II PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱89.2M | 100% | High risk72 | —-0.070 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 18D00040PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION INCL. BRIDGE & MAINTENANCE ROAD ALONG ZAPOTE RIVER (UPSTREAM), BACOOR SIDE, CAVITE | Region IV-A | Region IV-A | Completed | ₱186.2M | 100% | High risk68 | —-0.024 |
| 20OC0032CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱95.3M | 100% | High risk68 | —-0.028 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 21O00101REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱193M | 99% | High risk67 | —-0.007 |
| 24OC0063CONSTRUCTION OF REVETMENT WALL AND GROUNDSILL ALONG VILLANUEVA CREEK, GOV. A. SANTOS SECTION, BRGY. BF HOMES,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.063 |
| 18L00115CARMEN-TAGUM CITY COASTAL ROAD, INCL. ROW, CARMEN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱127.5M | 100% | High risk66 | —-0.030 |
| 19F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN NICOLAS RIVER CONTROL (RIGHT SIDE), BRGY. CABANBANAN, SAN VICENTE, CAMARINES NORTE, SAN VICENTE, CAMARI | Region V | Region V | Completed | ₱111M | 100% | High risk66 | —-0.070 |
| 19OC0032REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAQUE RIVER MOUTH (PHASE VIII),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱94.7M | 100% | High risk64 | —-0.077 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20G00076CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱241.2M | 60% | High risk64 | Flagged0.029 |
| 21L00135CONSTRUCTION OF FLOOD PROTECTION DIKE GABION TYPE, TAMIA, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱187.7M | 100% | High risk64 | Flagged0.013 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 22LG0022WIDENING OF TIBANBAN BR. (B00030MN) ALONG PRES. DIOSDADO P.MACAPAGAL NATL HI-WAY | Region XI | Davao Oriental 2nd DEO | On-Going | ₱52M | 97% | Medium risk52 | Flagged0.008 |
| 18NH0165CONSTRUCTION OF SITIO KAPATAGAN, MABUHAY TO MAITUM (IRRIGATION SITE)-MAHANON FMR WITH 2 SINGLE LANE RCDG BRIDGE,BRGY. MABUHAY, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱78.4M | 100% | Medium risk49 | Flagged0.006 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 24CI0122FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER AT QUITANGIL CREEK (RIGHT DIKE), TALIMUNDOC, MAGALANG, PAMP | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 100% | Medium risk45 | Flagged0.004 |
| 22LG0047REPLACEMENT OF BAGNAN BRIDGE, ALONG NHJ-DMM BAGNAN-TAGBOBOLO RD, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱37.3M | 100% | Medium risk48 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 2 | 20O00074REPLACEMENT OF TWO (2) BOX CULVERT ALONG LONGOS CREEK LEADING TO LONGOS PUMPING STATION AND REHABILITATION OF BOX CULVERT AT P. AQUINO AVE., BRGY. LONGOS, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱161.1M | 100% | High risk77 | —-0.053 |
| 3 | 22O00073CONSTRUCTION OF PUMPING STATION AND IMPROVEMENT OF EXISTING FACILITIES AT LAKANDULA DRAINAGE MAIN CORNER R-10 AND PACHECO DRAINAGE MAIN CORNER R-10, TONDO, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱180.8M | 100% | High risk76 | —-0.043 |
| 4 | 19Z00035PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Central Office | Flood Control Management Cluster | Completed | ₱279.6M | 100% | High risk76 | —-0.039 |
| 5 | 20O00065REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE I PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱92.3M | 100% | High risk75 | —-0.070 |
| 6 | 17OB0419REVETMENT AND DREDGING WORKS ALONG SALAPAN CREEK, REVETMENT LEFT AND RIGHT BANK (STA. 1+633.977 TO STA. 1+834.710) DREDGING (STA. 1+700 TO STA. 1+800 AND STA. 1+900 TO STA. 2+300) | Central Office | Flood Control Management Cluster | Completed | ₱93.3M | 100% | High risk74 | —-0.048 |
| 7 | 20O00090CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER: ACACIA PS TO PNR, PNR TO MCARTHUR BRIDGE, MCARTHUR BRIDGE TO BAILEY BRIDGE, BAILEY BRIDGE TO MALABON BOUNDARY, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱74.8M | 100% | High risk72 | —-0.021 |
| 8 | 20O00091CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER, C4 ROAD, LONGOS PS TO MALABON BRIDGE, TONSUYA-MALABON BRIDGE, NIUGAN, LAMBINGAN BRIDGE, REMIGIO (MAYSILO), MUZON, IBABA, SAN AGUSTIN, TANONG, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱77.2M | 93% | High risk72 | —-0.017 |
| 9 | 21O00108CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-NAVOTAS RIVER, (BARANGAY TAÑONG UP TO BARANGAY HULONG DUHAT), MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱77.8M | 100% | High risk72 | —-0.062 |
| 10 | 20O00066REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE II PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱89.2M | 100% | High risk72 | —-0.070 |
| 11 | 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 12 | 18D00040PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION INCL. BRIDGE & MAINTENANCE ROAD ALONG ZAPOTE RIVER (UPSTREAM), BACOOR SIDE, CAVITE | Region IV-A | Region IV-A | Completed | ₱186.2M | 100% | High risk68 | —-0.024 |
| 13 | 20OC0032CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱95.3M | 100% | High risk68 | —-0.028 |
| 14 | 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 15 | 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 16 | 21O00101REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱193M | 99% | High risk67 | —-0.007 |
| 17 | 24OC0063CONSTRUCTION OF REVETMENT WALL AND GROUNDSILL ALONG VILLANUEVA CREEK, GOV. A. SANTOS SECTION, BRGY. BF HOMES,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.063 |
| 18 | 18L00115CARMEN-TAGUM CITY COASTAL ROAD, INCL. ROW, CARMEN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱127.5M | 100% | High risk66 | —-0.030 |
| 19 | 19F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN NICOLAS RIVER CONTROL (RIGHT SIDE), BRGY. CABANBANAN, SAN VICENTE, CAMARINES NORTE, SAN VICENTE, CAMARI | Region V | Region V | Completed | ₱111M | 100% | High risk66 | —-0.070 |
| 20 | 19OC0032REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAQUE RIVER MOUTH (PHASE VIII),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱94.7M | 100% | High risk64 | —-0.077 |
| 21 | 19D00016PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BACOOR FLOOD CONTROL PROJECT INCL. A PUMPING STATION, (PACKAGE A), BACOOR CITY, CAVITE | Region IV-A | Region IV-A | Completed | ₱103M | 100% | High risk64 | —-0.058 |
| 22 | 19L00091CONST. OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG MANAT RIVER,TAPIA SECTION,MONTEVISTA,COMPOST | Region XI | Region XI | Completed | ₱170.8M | 100% | High risk64 | —-0.018 |
| 23 | 21L00135CONSTRUCTION OF FLOOD PROTECTION DIKE GABION TYPE, TAMIA, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱187.7M | 100% | High risk64 | Flagged0.013 |
| 24 | 20G00076CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱241.2M | 60% | High risk64 | Flagged0.029 |
| 25 | 20G00077CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), DUMALAG, CAPIZ | Region VI | Region VI | Completed | ₱193M | 100% | High risk64 | —-0.038 |