Contractor dossier
130 projects on file, including joint ventures this contractor is part of.
Total projects
130
Total budget
₱9.9B
Average progress
98.9%
Completion rate
86.9%
Average risk score
52.8
Medium risk on average, out of 100
Flagged as unusual
9
6.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 73 | ₱4.3B | 51.1 | 0 | 99.2% |
| Region XI | 26 | ₱2B | 52.1 | 5 | 99.3% |
| Central Office | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| Region XIII | 6 | ₱488.3M | 43.4 | 1 | 100.0% |
| Region III | 4 | ₱216.3M | 35.9 | 1 | 99.0% |
| Region X | 3 | ₱291.7M | 55.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱289.2M | 66.2 | 0 | 100.0% |
| Region VI | 2 | ₱434.2M | 64.0 | 1 | 79.9% |
| Region V | 2 | ₱187.4M | 62.4 | 0 | 100.0% |
| Region XII | 2 | ₱240.2M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 90 | ₱6.4B | 53.1 | 2 | 99.3% |
| Roads | 21 | ₱1.2B | 49.5 | 0 | 100.0% |
| Buildings and Facilities | 7 | ₱837.9M | 50.8 | 1 | 93.6% |
| Bridges, Roads | 5 | ₱599.4M | 59.3 | 3 | 98.1% |
| Bridges | 4 | ₱329.4M | 46.4 | 2 | 99.3% |
| OTHER | 3 | ₱575.6M | 71.9 | 1 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20O00074REPLACEMENT OF TWO (2) BOX CULVERT ALONG LONGOS CREEK LEADING TO LONGOS PUMPING STATION AND REHABILITATION OF BOX CULVERT AT P. AQUINO AVE., BRGY. LONGOS, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱161.1M | 100% | High risk77 | —-0.053 |
| 22O00073CONSTRUCTION OF PUMPING STATION AND IMPROVEMENT OF EXISTING FACILITIES AT LAKANDULA DRAINAGE MAIN CORNER R-10 AND PACHECO DRAINAGE MAIN CORNER R-10, TONDO, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱180.8M | 100% | High risk76 | —-0.043 |
| 19Z00035PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Central Office | Flood Control Management Cluster | Completed | ₱279.6M | 100% | High risk76 | —-0.039 |
| 20O00065REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE I PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱92.3M | 100% | High risk75 | —-0.070 |
| 17OB0419REVETMENT AND DREDGING WORKS ALONG SALAPAN CREEK, REVETMENT LEFT AND RIGHT BANK (STA. 1+633.977 TO STA. 1+834.710) DREDGING (STA. 1+700 TO STA. 1+800 AND STA. 1+900 TO STA. 2+300) | Central Office | Flood Control Management Cluster | Completed | ₱93.3M | 100% | High risk74 | —-0.048 |
| 20O00090CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER: ACACIA PS TO PNR, PNR TO MCARTHUR BRIDGE, MCARTHUR BRIDGE TO BAILEY BRIDGE, BAILEY BRIDGE TO MALABON BOUNDARY, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱74.8M | 100% | High risk72 | —-0.021 |
| 20O00091CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER, C4 ROAD, LONGOS PS TO MALABON BRIDGE, TONSUYA-MALABON BRIDGE, NIUGAN, LAMBINGAN BRIDGE, REMIGIO (MAYSILO), MUZON, IBABA, SAN AGUSTIN, TANONG, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱77.2M | 93% | High risk72 | —-0.017 |
| 21O00108CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-NAVOTAS RIVER, (BARANGAY TAÑONG UP TO BARANGAY HULONG DUHAT), MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱77.8M | 100% | High risk72 | —-0.062 |
| 20O00066REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE II PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱89.2M | 100% | High risk72 | —-0.070 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 18D00040PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION INCL. BRIDGE & MAINTENANCE ROAD ALONG ZAPOTE RIVER (UPSTREAM), BACOOR SIDE, CAVITE | Region IV-A | Region IV-A | Completed | ₱186.2M | 100% | High risk68 | —-0.024 |
| 20OC0032CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱95.3M | 100% | High risk68 | —-0.028 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 21O00101REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱193M | 99% | High risk67 | —-0.007 |
| 24OC0063CONSTRUCTION OF REVETMENT WALL AND GROUNDSILL ALONG VILLANUEVA CREEK, GOV. A. SANTOS SECTION, BRGY. BF HOMES,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.063 |
| 18L00115CARMEN-TAGUM CITY COASTAL ROAD, INCL. ROW, CARMEN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱127.5M | 100% | High risk66 | —-0.030 |
| 19F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN NICOLAS RIVER CONTROL (RIGHT SIDE), BRGY. CABANBANAN, SAN VICENTE, CAMARINES NORTE, SAN VICENTE, CAMARI | Region V | Region V | Completed | ₱111M | 100% | High risk66 | —-0.070 |
| 19OC0032REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAQUE RIVER MOUTH (PHASE VIII),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱94.7M | 100% | High risk64 | —-0.077 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20G00076CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱241.2M | 60% | High risk64 | Flagged0.029 |
| 21L00135CONSTRUCTION OF FLOOD PROTECTION DIKE GABION TYPE, TAMIA, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱187.7M | 100% | High risk64 | Flagged0.013 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 22LG0022WIDENING OF TIBANBAN BR. (B00030MN) ALONG PRES. DIOSDADO P.MACAPAGAL NATL HI-WAY | Region XI | Davao Oriental 2nd DEO | On-Going | ₱52M | 97% | Medium risk52 | Flagged0.008 |
| 18NH0165CONSTRUCTION OF SITIO KAPATAGAN, MABUHAY TO MAITUM (IRRIGATION SITE)-MAHANON FMR WITH 2 SINGLE LANE RCDG BRIDGE,BRGY. MABUHAY, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱78.4M | 100% | Medium risk49 | Flagged0.006 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 24CI0122FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER AT QUITANGIL CREEK (RIGHT DIKE), TALIMUNDOC, MAGALANG, PAMP | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 100% | Medium risk45 | Flagged0.004 |
| 22LG0047REPLACEMENT OF BAGNAN BRIDGE, ALONG NHJ-DMM BAGNAN-TAGBOBOLO RD, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱37.3M | 100% | Medium risk48 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22OC0101IMPROVEMENT OF DON GALO RIVER FROM ALDRIN GOING RODRIGUEZ BRIDGE, BRGY. MOONWALK,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 77 | 22OA0019CONSTRUCTION OF RIVERWALL ALONG SOUTH PINAGKABALIAN RIVER (PHASE 8), BRGY. PANGHULO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 78 | 22LG0047REPLACEMENT OF BAGNAN BRIDGE, ALONG NHJ-DMM BAGNAN-TAGBOBOLO RD, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱37.3M | 100% | Medium risk48 | Flagged0.003 |
| 79 | 20OC0080REPAIR/REHABILITATION OF MCKINLEY ROAD FROM EDSA TO MAKATI-TAGUIG BOUNDARY (INTERMITTENT SECTION), MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.098 |
| 80 | 22OI0004PREVENTIVE MAINTENANCE - TERTIARY ROAD SOUTH SUPER H-WAY WEST SERVICE RD - K0021+465 - K0022+901, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.093 |
| 81 | 21OC0035CONSTRUCTION OF REVETMENT WALL/SHEETPILING ALONG DON GALO RIVER FROM RODRIGUEZ ST. TO MULTINATIONAL ROAD,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.6M | 100% | Medium risk47 | —-0.088 |
| 82 | 19LG0035ROAD JUNCTION PRRD TO BRGY. SITE , BRGY. SAN JOSE CONNECTING LUPON PUBLIC TERMINAL AND BANANA AND COCONUT PROCESSING SITES IN SUPPORT OF AGRIBUSINESS : BANANA AND CACAO INDUSTRIES, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱22.1M | 100% | Medium risk47 | —-0.080 |
| 83 | 21LA0117ASPHALT OVERLAY - ALONG NABUNTURAN - MARAGUSAN RD. (S00127MN) MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱37.9M | 100% | Medium risk47 | —-0.081 |
| 84 | 19LG0097BRGY. PANIKIAN CENTRO TO BRGY. MAHAYAG ROAD CONNECTING BANAYBANAY PUBLIC TERMINAL AND COCONUT AND CORN PROCESSING SITES IN SUPPORT OF AGRIBUSINESS; COCONUT AND CORN INDUSTRIES , BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.083 |
| 85 | 21LC0046TAGUM-PANABO CIRCUM. RD - K1491+593 - K1492+324, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱28.6M | 100% | Medium risk46 | —-0.089 |
| 86 | 24OC0026CONSTRUCTION OF REVETMENT WALL ALONG DON GALO RIVER FROM RODRIGUEZ TO MULTINATIONAL AVE., (PHASE II), PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱32.9M | 100% | Medium risk46 | —-0.086 |
| 87 | 22OC0140IMPROVEMENT/SHEETPILING OF VILLANUEVA CREEK TRIBUTARY NEAR BOUGAINVILLE AVE.,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.086 |
| 88 | 18OI0103CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM OF JAPANESE CEMETERY ROAD AND BURMA STREET, NBP ROAD | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱19.4M | 100% | Medium risk46 | —-0.090 |
| 89 | 18OI0036WIDENING INCLUDING DRAINAGE SYSTEM OF BIAZON ROAD, BRGY. POBLACION, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.097 |
| 90 | 18OC0043IMPROVEMENT/SHEET PILING OF PARAÑAQUE RIVER SOUTH NEAR AVIDA TOWER,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.078 |
| 91 | 18OC0067BANK IMPROVEMENT/SHEET PILING OF PARAÑAQUE RIVER DIVERSION CHANNEL, PHASE III, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.085 |
| 92 | 18OC0060BANK IMPROVEMENT/SHEET PILING OF PARAÑAQUE RIVER FROM BALOC-BALOC CREEK TOWARDS CARLOS P. GARCIA EXTENSION, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.086 |
| 93 | 20OC0037REHABILITATION OF PARAÑAQUE RIVER MOUTH (PHASE 1), BRGY. DON GALO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱44.7M | 100% | Medium risk46 | —-0.086 |
| 94 | 19OC0198CONSTRUCTION OF REVETMENT WALL ALONG MAKATI-PATEROS RIVER (NORTH SIDE), BRGY. EAST REMBO, MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱32.2M | 100% | Medium risk46 | —-0.088 |
| 95 | 24OC0108REHABILITATION ALONG SAPANG BUWAYA CREEK, GREENHEIGHTS VILLAGE, BARANGAY SAN ANTONIO, DISTRICT II,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.086 |
| 96 | 19LB0035CONSTRUCTION OF REVETMENT-DAVAO RIVER, GENEROSO BRIDGE SECTION STA. 2+912-STA. 3+176, LEFT BANK, BRGY.5-A, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.075 |
| 97 | 19LB0034CONSTRUCTION OF REVETMENT-DAVAO RIVER, GENEROSO BRIDGE SECTION, STA. 2+550-STA, 2+687, STA. 2+782-STA. 2+912, LEFT BANK, BRGY.5-A, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.075 |
| 98 | 18OC0044IMPROVEMENT/SHEET PILING OF PARAÑAQUE MOUTH (PHASE II), PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.081 |
| 99 | 18OC0057IMPROVEMENT/SHEETPILING OF PARAÑAQUEMOUTH (PHASE IV), PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.086 |
| 100 | 18OC0099REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAQUE MOUTH (PHASE V)PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.087 |