130 projects on file, including joint ventures this contractor is part of.
Total projects
130
Total budget
₱9.9B
Average progress
98.9%
Completion rate
86.9%
Average risk score
52.8
Medium risk on average, out of 100
Flagged as unusual
9
6.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 73 | ₱4.3B | 51.1 | 0 | 99.2% |
| Region XI | 26 | ₱2B | 52.1 | 5 | 99.3% |
| Central Office | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| Region XIII | 6 | ₱488.3M | 43.4 | 1 | 100.0% |
| Region III | 4 | ₱216.3M | 35.9 | 1 | 99.0% |
| Region X | 3 | ₱291.7M | 55.4 | 0 | 100.0% |
| Region IV-A | 2 | ₱289.2M | 66.2 | 0 | 100.0% |
| Region VI | 2 | ₱434.2M | 64.0 | 1 | 79.9% |
| Region V | 2 | ₱187.4M | 62.4 | 0 | 100.0% |
| Region XII | 2 | ₱240.2M | 42.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 90 | ₱6.4B | 53.1 | 2 | 99.3% |
| Roads | 21 | ₱1.2B | 49.5 | 0 | 100.0% |
| Buildings and Facilities | 7 | ₱837.9M | 50.8 | 1 | 93.6% |
| Bridges, Roads | 5 | ₱599.4M | 59.3 | 3 | 98.1% |
| Bridges | 4 | ₱329.4M | 46.4 | 2 | 99.3% |
| OTHER | 3 | ₱575.6M | 71.9 | 1 | 95.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20O00074REPLACEMENT OF TWO (2) BOX CULVERT ALONG LONGOS CREEK LEADING TO LONGOS PUMPING STATION AND REHABILITATION OF BOX CULVERT AT P. AQUINO AVE., BRGY. LONGOS, MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱161.1M | 100% | High risk77 | —-0.053 |
| 22O00073CONSTRUCTION OF PUMPING STATION AND IMPROVEMENT OF EXISTING FACILITIES AT LAKANDULA DRAINAGE MAIN CORNER R-10 AND PACHECO DRAINAGE MAIN CORNER R-10, TONDO, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱180.8M | 100% | High risk76 | —-0.043 |
| 19Z00035PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Central Office | Flood Control Management Cluster | Completed | ₱279.6M | 100% | High risk76 | —-0.039 |
| 20O00065REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE I PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱92.3M | 100% | High risk75 | —-0.070 |
| 17OB0419REVETMENT AND DREDGING WORKS ALONG SALAPAN CREEK, REVETMENT LEFT AND RIGHT BANK (STA. 1+633.977 TO STA. 1+834.710) DREDGING (STA. 1+700 TO STA. 1+800 AND STA. 1+900 TO STA. 2+300) | Central Office | Flood Control Management Cluster | Completed | ₱93.3M | 100% | High risk74 | —-0.048 |
| 20O00090CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER: ACACIA PS TO PNR, PNR TO MCARTHUR BRIDGE, MCARTHUR BRIDGE TO BAILEY BRIDGE, BAILEY BRIDGE TO MALABON BOUNDARY, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱74.8M | 100% | High risk72 | —-0.021 |
| 20O00091CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER, C4 ROAD, LONGOS PS TO MALABON BRIDGE, TONSUYA-MALABON BRIDGE, NIUGAN, LAMBINGAN BRIDGE, REMIGIO (MAYSILO), MUZON, IBABA, SAN AGUSTIN, TANONG, MALABON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱77.2M | 93% | High risk72 | —-0.017 |
| 21O00108CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-NAVOTAS RIVER, (BARANGAY TAÑONG UP TO BARANGAY HULONG DUHAT), MALABON CITY | Central Office | Flood Control Management Cluster | Completed | ₱77.8M | 100% | High risk72 | —-0.062 |
| 20O00066REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE II PARANAQUE | Central Office | Flood Control Management Cluster | Completed | ₱89.2M | 100% | High risk72 | —-0.070 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 18D00040PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION INCL. BRIDGE & MAINTENANCE ROAD ALONG ZAPOTE RIVER (UPSTREAM), BACOOR SIDE, CAVITE | Region IV-A | Region IV-A | Completed | ₱186.2M | 100% | High risk68 | —-0.024 |
| 20OC0032CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱95.3M | 100% | High risk68 | —-0.028 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 21O00101REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱193M | 99% | High risk67 | —-0.007 |
| 24OC0063CONSTRUCTION OF REVETMENT WALL AND GROUNDSILL ALONG VILLANUEVA CREEK, GOV. A. SANTOS SECTION, BRGY. BF HOMES,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.063 |
| 18L00115CARMEN-TAGUM CITY COASTAL ROAD, INCL. ROW, CARMEN, TAGUM CITY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱127.5M | 100% | High risk66 | —-0.030 |
| 19F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN NICOLAS RIVER CONTROL (RIGHT SIDE), BRGY. CABANBANAN, SAN VICENTE, CAMARINES NORTE, SAN VICENTE, CAMARI | Region V | Region V | Completed | ₱111M | 100% | High risk66 | —-0.070 |
| 19OC0032REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAQUE RIVER MOUTH (PHASE VIII),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱94.7M | 100% | High risk64 | —-0.077 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 20G00076CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING), DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱241.2M | 60% | High risk64 | Flagged0.029 |
| 21L00135CONSTRUCTION OF FLOOD PROTECTION DIKE GABION TYPE, TAMIA, COMPOSTELA, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱187.7M | 100% | High risk64 | Flagged0.013 |
| 21L00071CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE D), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱168.7M | 98% | High risk68 | Flagged0.009 |
| 22LG0022WIDENING OF TIBANBAN BR. (B00030MN) ALONG PRES. DIOSDADO P.MACAPAGAL NATL HI-WAY | Region XI | Davao Oriental 2nd DEO | On-Going | ₱52M | 97% | Medium risk52 | Flagged0.008 |
| 18NH0165CONSTRUCTION OF SITIO KAPATAGAN, MABUHAY TO MAITUM (IRRIGATION SITE)-MAHANON FMR WITH 2 SINGLE LANE RCDG BRIDGE,BRGY. MABUHAY, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱78.4M | 100% | Medium risk49 | Flagged0.006 |
| 21L00072CONSTRUCTION OF CONCRETE BRIDGE - CARMEN - TAGUM CITY COASTAL ROAD (PACKAGE E), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱136.5M | 93% | High risk68 | Flagged0.006 |
| 24CI0122FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER AT QUITANGIL CREEK (RIGHT DIKE), TALIMUNDOC, MAGALANG, PAMP | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 100% | Medium risk45 | Flagged0.004 |
| 22LG0047REPLACEMENT OF BAGNAN BRIDGE, ALONG NHJ-DMM BAGNAN-TAGBOBOLO RD, MATI CITY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱37.3M | 100% | Medium risk48 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18OC0106REHABILITATION OF CONCRETE REVETMENT WALL ALONG PARAÑAUE MOUTH (PHASE VI)PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.087 |
| 102 | 24OC0012CONSTRUCTION (IMPROVEMENT) OF DON GALO RIVER FROM ALDRIN GOING RODRIGUEZ BRIDGE (PHASE 2), BARANGAY MOONWALK,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.086 |
| 103 | 21OC0160CONSTRUCTION OF PUMPING STATION (PHASE II). BARANGAY RIZAL,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱38.4M | 100% | Medium risk46 | —-0.087 |
| 104 | 18OC0117IMPROVEMENT OF SAPANG BUWAYA CREEK, REMANVILLE VILLAGE, BARANGAY SAN ANTONIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱18.5M | 100% | Medium risk46 | —-0.087 |
| 105 | 18OC0078CONSTRUCTION OF STEEL SHEET PILE ALONG PARAÑAQUE RIVER SOUTH, PHASE II, BARANGAY MOONWALK, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.082 |
| 106 | 18OC0118IMPROVEMENT/DREDGING OF VILLANUEVA CREEK & SAPANG BUWAYA CREEK JUNCTION, BARANGAY SAN DIONISIO, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.085 |
| 107 | 18OC0004IMPROVEMENT/SHEET PILING OF KAYBUBOY CREEK (NORTH SIDE), BARANGAY SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.6M | 100% | Medium risk46 | —-0.085 |
| 108 | 18OC0074CONSTRUCTION OF STEEL SHEET PILE ALONG PARAÑAQUE RIVER SOUTH, PHASE I, BARANGAY MOONWALKPARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.086 |
| 109 | 22OA0071CONSTRUCTION OF RIVERWALL ALONG MUZON RIVER, BARANRANGAY MUZON, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱39.6M | 100% | Medium risk46 | —-0.086 |
| 110 | 20M00010WIDENING OF PERMANENT BRIDGE - CARMEN PARALLEL BR. ALONG BUKIDNON-COTABATO ROAD, K1652+008 - K1652+230.55, CARMEN, NORTH COTABATO | Region XII | Region XII | Completed | ₱143.7M | 100% | Medium risk46 | —-0.034 |
| 111 | 20OC0085CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF MOONWALK CREEK,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.087 |
| 112 | 20OC0083CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF BALIUAG CREEK (PHASE 1),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.087 |
| 113 | 18OC0061IMPROVEMENT/SHEET PILING OF DON GALO RIVER (NORTH SIDE) PHASE 2, BARANGAY STO. NIÑO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.059 |
| 114 | 18OC0151IMPROVEMENT OF PARAÑAQUE RIVER (NORTH & SOUTH JUNCTION),PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.081 |
| 115 | 18OC0104CONSTRUCTION OF REVETMENT WALL ALONG MAKATI-PATEROS RIVER, BARANGAY PEMBO PHASE 2, DISTRICT II, MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱18.4M | 100% | Medium risk46 | —-0.088 |
| 116 | 18OI0047REHABILITATION OF ROAD, PHASE 1, VICTORIA HOMES, BRGY. TUNASAN, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱13.9M | 100% | Medium risk46 | —-0.096 |
| 117 | 22LC0097CONSTRUCTION OF DIKE ALONG LOCUTAN BRIDGE TO MACTAN CHANNEL DOWN TO TUGANAY RIVER, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.067 |
| 118 | 18NH0097LANUZA BYPASS ROAD (SDCR ALTERNATE ROUTE), INCLUDING ROW, LANUZA,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱88.3M | 100% | Medium risk45 | —-0.055 |
| 119 | 24CI0122FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER AT QUITANGIL CREEK (RIGHT DIKE), TALIMUNDOC, MAGALANG, PAMP | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 100% | Medium risk45 | Flagged0.004 |
| 120 | 18LB0283IMPROVEMENT/CONSTRUCTION OF DRAINAGE ALONG ACASIA STREET JCT. PATNUBAY STREET, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱15.6M | 100% | Medium risk44 | —-0.075 |
| 121 | 19LC0319CONSTRUCTION OF CONCRETE REVETMENT, MANGALCAL BANK PROTECTION ALONG CARMEN- DAPECOL COMPOUND ROAD, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱44.9M | 100% | Medium risk44 | —-0.075 |
| 122 | 20M00011WIDENING OF PERMANENT BRIDGE LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO ROAD, K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱96.5M | 100% | Medium risk40 | —-0.047 |
| 123 | 19NH0022JCT. GAMUT -SAN MIGUEL BAYUGAN ROAD K1310+(-105) - K1311+012 ROAD WIDENING, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱21.2M | 100% | Medium risk38 | —-0.077 |