Opening the dossier…
Opening the dossier…
Contractor dossier
50 projects on file, including joint ventures this contractor is part of.
Total projects
50
Total budget
₱1.3B
Average progress
92.8%
Completion rate
88.0%
Average risk score
34.1
Medium risk on average, out of 100
Flagged as unusual
1
2.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 50 | ₱1.3B | 34.1 | 1 | 92.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 20 | ₱489.3M | 39.7 | 0 | 90.2% |
| Flood Control and Drainage | 17 | ₱697.1M | 36.0 | 0 | 95.9% |
| Buildings and Facilities | 9 | ₱64.5M | 12.8 | 0 | 100.0% |
| Bridges | 3 | ₱65.4M | 29.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱19.3M | 93.0 | 1 | 5.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CI0056SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY STO ROSARIO, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.3M | 5% | High risk93 | Flagged0.027 |
| 17CI0007NETWORK DEV'T-IMPROVEMENT/WIDENING OF NATL ROADS-SECONDARY: FRIENDSHIP CIRCUMFERENTIAL ROAD(WEST CIR | Region III | Pampanga 3rd DEO | Completed | ₱30.8M | 100% | High risk69 | —-0.065 |
| 25CI0063SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS 9SIPAG):SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADFING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BY-PASS ROAD CONNECTING ABACAN ROAD DIKE, ANGELES CITY, PAMPANG | Region III | Pampanga 3rd DEO | On-Going | ₱19.2M | 0% | High risk69 | —-0.011 |
| 25CI0042SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BY-PASS ROAD AT MAGALANG AVE. BRGY SALAPUNGAN TO PANDAN, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱14.4M | 3% | High risk69 | —-0.012 |
| 25CI0052SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT ANGELES CITY, PAMPANGA (PHASE 2) | Region III | Pampanga 3rd DEO | On-Going | ₱19.2M | 31% | High risk68 | —-0.010 |
| 17CI0003NATL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATL ROADS, REHAB/RECONST/UPGRADING OF DAMAGED PAV | Region III | Pampanga 3rd DEO | Completed | ₱11.2M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CI0056SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY STO ROSARIO, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.3M | 5% | High risk93 | Flagged0.027 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CI0056SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY STO ROSARIO, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.3M | 5% | High risk93 | Flagged0.027 |
| 2 | 17CI0007NETWORK DEV'T-IMPROVEMENT/WIDENING OF NATL ROADS-SECONDARY: FRIENDSHIP CIRCUMFERENTIAL ROAD(WEST CIR | Region III | Pampanga 3rd DEO | Completed | ₱30.8M | 100% | High risk69 | —-0.065 |
| 3 | 25CI0063SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS 9SIPAG):SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADFING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BY-PASS ROAD CONNECTING ABACAN ROAD DIKE, ANGELES CITY, PAMPANG | Region III | Pampanga 3rd DEO | On-Going | ₱19.2M | 0% | High risk69 | —-0.011 |
| 4 | 25CI0042SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BY-PASS ROAD AT MAGALANG AVE. BRGY SALAPUNGAN TO PANDAN, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱14.4M | 3% | High risk69 | —-0.012 |
| 5 | 25CI0052SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT ANGELES CITY, PAMPANGA (PHASE 2) | Region III | Pampanga 3rd DEO | On-Going | ₱19.2M | 31% | High risk68 | —-0.010 |
| 6 | 17CI0003NATL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATL ROADS, REHAB/RECONST/UPGRADING OF DAMAGED PAV | Region III | Pampanga 3rd DEO | Completed | ₱11.2M | 100% | High risk68 | —-0.068 |
| 7 | 25CI0001FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY SAPALIBUTAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱96.6M | 100% | Medium risk57 | —-0.050 |
| 8 | 24CI0004SIPAG-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY PAMPAN | Region III | Pampanga 3rd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 9 | 18CI0085NETWORK DEVELOPMENT PROGRAM; ROAD WIDENING SECONDARY ROADS; FRIENDSHIP CIRCUMFERENTIAL ROAD (WEST CIRCUM ROAD) INCLUDING ROW K0082+282 - K0084+400, K0086+589 - K0086+595, K0087+781 - K0088+086, K0088+327 - K0088+460, K0089+187 - K0089+589, A.C., PAMP. | Region III | Pampanga 3rd DEO | Completed | ₱54.5M | 100% | Medium risk38 | —-0.097 |
| 10 | 20CI0016CONVERGENCE AND SPECIAL PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES;ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX IN SUPPORT OF HANDICRAFT, FURNITURE,MANUFACTURING,HOTEL, IT-IBPM GARMENTS AND TEXTILES IND | Region III | Pampanga 3rd DEO | Completed | ₱57.9M | 100% | Medium risk38 | —-0.097 |
| 11 | 23CI0131SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ABACAN RIVER, BRGYS. MALABANAS TO ANUNAS, ANGELES CITY, PAMPAN | Region III | Pampanga 3rd DEO | Completed | ₱67.5M | 100% | Medium risk34 | —-0.088 |
| 12 | 24CI0084FLOOF MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN ANGELES CITY, PAMPANGA (PHASE I) | Region III | Pampanga 3rd DEO | Completed | ₱62.7M | 100% | Medium risk34 | —-0.088 |
| 13 | 19CI0003NETWORK DEVELOPMENT-OFF CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS FRIENDSHIP CIRCUM ROAD(WEST CIRCUM ROAD) K0084+400 TO K0085+800, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱41.2M | 100% | Medium risk34 | —-0.101 |
| 14 | 23CI0071ASSET PRESERVATION PROGRAM; CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS, WEST CIRCUMFERENCIAL ROAD K0082+680-K0083+820 LEFT SIDE | Region III | Pampanga 3rd DEO | Completed | ₱39.2M | 100% | Medium risk34 | —-0.101 |
| 15 | 22CI0013FLOOD MANAGEMENT PROGRAM; CONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY TABUN TO CAPAYA, ANGELES CITY, PAMPANGA-STA 1+949-2+6 | Region III | Pampanga 3rd DEO | Completed | ₱56M | 100% | Medium risk34 | —-0.089 |
| 16 | 22CI0123ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM; ASSET PRESERVATION PROGRAM; CONST/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS MANILA NORTH ROAD K0086+740-K0086+970 | Region III | Pampanga 3rd DEO | Completed | ₱24.1M | 100% | Medium risk33 | —-0.103 |
| 17 | 18CI0006ASSET PRESERVATION PROGRAM-REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-ARAYAT-MAGALANG-MABALACAT ROAD-K0105+200 TO K0106+219,K0106+509 TO K0106+780,MAGALANG, PAMP | Region III | Pampanga 3rd DEO | Completed | ₱32.1M | 100% | Medium risk32 | —-0.103 |
| 18 | 19CI0117CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES,NLEX-SCTEX CONNECTING ROAD IN SUPPORT OF FURNITURE, IT-BPM,HOTELS,GARMRNTS AND TEXTILES INDUSRIES, ANGELES CITY PAMP. PHASE 2 | Region III | Pampanga 3rd DEO | Completed | ₱24.5M | 100% | Medium risk32 | —-0.104 |
| 19 | 21CI0017CONVERGENCE AND SPECIAL SUPPORT PROGRAM;CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES; NLEX-SCTEX CONNECTING ROADS IN SUPPORT OF FURNITURE, IT-IBM,HOTELS,GARMENTS AND TEXTILE INDUSTRIES,ANGELES CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱14.5M | 100% | Medium risk32 | —-0.103 |
| 20 | 19CI0096LOCAL PROGRAM;CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS,LOCAL ROADS AND BRIDGES,LOCAL ROADS,RECONST/REHAB OF PSAU-AYALA,MAGALANG,PAMPANGA ROAD | Region III | Pampanga 3rd DEO | Completed | ₱28.9M | 100% | Medium risk32 | —-0.104 |
| 21 | 19CI0094LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK,MABALACAT CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.089 |
| 22 | 20CI0070LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION OF SLOPE PROTECTION WORKS WITH CONCRETE PAVEMENT ALONG ABACAN RIVER STA. 2+300 TO STA 2+852, ANGELES CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49.5M | 100% | Medium risk32 | —-0.091 |
| 23 | 22CI0099NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING-SECONDARY ROADS ARAYAT-MAGALANG-MABALACAT ROAD KO107+705-KO108+000, MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱19.1M | 100% | Medium risk32 | —-0.104 |
| 24 | 25CI0029SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF BY-PASS ROAD INCLUDING DRAINAGE SYSTEM, PHASE VI, BRGY CUTUD TO BRGY SAPALIBUTAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.6M | 100% | Medium risk32 | —-0.073 |
| 25 | 20CI0009NETWORK DEVELOPMENT-OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS; ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN ROAD -KO084+920, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱13.7M | 100% | Medium risk31 | —-0.104 |