Opening the dossier…
Opening the dossier…
Contractor dossier
2 projects on file, including joint ventures this contractor is part of.
Total projects
2
Total budget
₱25.4M
Average progress
100.0%
Completion rate
100.0%
Average risk score
24.2
Low risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 2 | ₱25.4M | 24.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 1 | ₱23.5M | 38.6 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱1.9M | 9.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18CB0075FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION AT TALISAY RIVER, ALA-ULI SECTION, PILAR, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱23.5M | 100% | Medium risk39 | —-0.089 |
| 2 | 18CI0020LOCAL INFRA PROGRAM/BUILDING AND OTHER STRUCTURE/MULTI-PURPOSE/FSCILITIES; CONST/REHAB OF MULTI PURPOSE BUILDING, BRGY NINOY AQUINO, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱1.9M | 100% | Low risk10 | —-0.104 |