Contractor dossier
484 projects on file, including joint ventures this contractor is part of.
Total projects
484
Total budget
₱13.1B
Average progress
95.9%
Completion rate
92.6%
Average risk score
38.9
Medium risk on average, out of 100
Flagged as unusual
21
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 435 | ₱10.1B | 37.8 | 20 | 95.7% |
| Cordillera Administrative Region | 15 | ₱1.3B | 54.9 | 0 | 100.0% |
| Region III | 11 | ₱871.1M | 50.2 | 1 | 94.0% |
| Region VI | 8 | ₱151.6M | 40.2 | 0 | 100.0% |
| Region VIII | 5 | ₱167M | 53.1 | 0 | 100.0% |
| Region IV-A | 4 | ₱57M | 35.7 | 0 | 99.9% |
| National Capital Region | 3 | ₱114.7M | 40.4 | 0 | 100.0% |
| Region II | 2 | ₱247.3M | 55.0 | 0 | 77.4% |
| Region IV-B | 1 | ₱19.6M | 38.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 182 | ₱1.5B | 28.6 | 0 | 98.9% |
| Roads | 179 | ₱5.7B | 40.3 | 7 | 95.0% |
| Bridges | 54 | ₱2B | 49.4 | 7 | 88.1% |
| Flood Control and Drainage | 51 | ₱2.9B | 48.6 | 2 | 97.8% |
| OTHER | 9 | ₱360.1M | 70.9 | 1 | 100.0% |
| GAA 2025 SSP | 4 | ₱239.1M | 95.1 | 4 | 68.0% |
| Bridges, Roads | 2 | ₱232.4M | 62.7 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7M | 32.2 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱94.6M | 64.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AG0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, BANI, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱93.1M | 49% | High risk96 | Flagged0.041 |
| 25AG0177SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE ALONG BARANGAY CABUYAO,SITIO LUBIGAN TO BARANGAY TUPA SITIO PANSUR | Region I | Pangasinan 1st DEO | On-Going | ₱93.1M | 61% | High risk95 | Flagged0.039 |
| 25AH0092INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING)ALONG PANG.-ZAM.RD.-K0358+(-910) | Region I | Pangasinan 2nd DEO | On-Going | ₱48.1M | 89% | High risk95 | Flagged0.017 |
| 25AJ0105CONCRETING OF ROAD, BRGY. CARUNGAY, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 73% | High risk94 | Flagged0.019 |
| 17AH0127CONSTRUCTION/REHABILITATION OF MANGATAREM DISTRICT HOSPITAL, MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱19.3M | 100% | High risk84 | Flagged0.014 |
| 24C00233CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES-CONST. OF SEAWALL PROTECTION STRUCTURES (PHASE I), ORION, BATAAN, PROVINCE OF BATAAN | Region III | Region III | On-Going | ₱241.2M | 98% | High risk80 | Flagged0.003 |
| 17P00001ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD K0330+722 - K0333+401 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | High risk78 | —-0.002 |
| 18IH0004REHABILITATION OF PAVED ROAD - DAANG MAHARLIKA (SM)(SN ISIDRO - SN JUANICO BR) - K0686+300 - K0686+525, K0686+565 - K0686+700, K0694+470 - K0694+970, BRGY. JUBASAN, ALLEN AND BRGY. ERENAS, VICTORIA ALL IN NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱22.3M | 100% | High risk75 | —-0.038 |
| 23CB0063CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF ROAD LEADING TO MT. SAMAT NATIONAL SHRINE PROJECT IN PILAR, BATAAN (PHASE III) | Region III | Bataan 2nd DEO | Completed | ₱93.6M | 100% | High risk73 | —-0.028 |
| 18AH0116ROAD WIDENING INCL.DRAINAGE ALONG PANG.-TARLAC RD.KO 168+136-KO 168+KO851,MANGATAREM,PANG. | Region I | Pangasinan 2nd DEO | Completed | ₱17.9M | 100% | High risk73 | —-0.032 |
| 17AH0023OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG LINGAYEN-LABRADOR RD.KO366+873-KO368+329 | Region I | Pangasinan 2nd DEO | Completed | ₱14.3M | 100% | High risk71 | —-0.028 |
| 17AG0057OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-SECONDARY ROADS BANI-AGNO RD-(KO349+051-KO350+134) AT | Region I | Pangasinan 1st DEO | Completed | ₱11.9M | 100% | High risk70 | —-0.026 |
| 17AH0032OFF-CARRIAGEWAY IMPRV'T.INCLUDING DRAINAGE ALONG PANG.-ZAM. RD.KO341+(-229)-KO341+476,KO341+528-KO34 | Region I | Pangasinan 2nd DEO | Completed | ₱34.2M | 100% | High risk70 | —-0.023 |
| 24A00353CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG AGNO RIVER, DARAWEY, BAYAMBANG, PANGASINAN, PHASE II | Region I | Region I | Completed | ₱48.2M | 100% | High risk69 | —-0.045 |
| 25AF0017SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF COASTAL ACCESS ROAD FROM AGOO TO ARINGAY, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱96.5M | 77% | High risk69 | Flagged0.010 |
| 22A00271CONSTRUCTION OF MISSING LINKS/NEW ROADS - ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD, ILOCOS NORTE (PACKAGE 3) | Region I | Region I | Completed | ₱96.5M | 100% | High risk69 | —-0.059 |
| 17A00008IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD K0183+580 - K0185+150; K0186+782 - K0187+000;K0194+693 - K0195+530 ; K0195+730 - K0196+250; K0199+412 - K0199+972 | Region I | Region I | Completed | ₱106.4M | 100% | High risk69 | —-0.042 |
| 17A00041CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF LINGAYEN BAYWALK TO BINMALEY, PANGASINAN | Region I | Region I | Completed | ₱144.7M | 100% | High risk68 | —-0.029 |
| 25A00278CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PANGASINAN-ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 2, PANGASINAN | Region I | Region I | On-Going | ₱65.5M | 1% | High risk65 | Flagged0.028 |
| 25A00277CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PANGASINAN-ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 1, PANGASINAN | Region I | Region I | On-Going | ₱65.5M | 0% | High risk65 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AG0184SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE CONNECTING SANTIAGO ISLAND TO BOLINAO(PACKAGEB)BOLINAO,PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱94.5M | 37% | High risk65 | Flagged0.053 |
| 25AG0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, BANI, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱93.1M | 49% | High risk96 | Flagged0.041 |
| 25AG0177SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE ALONG BARANGAY CABUYAO,SITIO LUBIGAN TO BARANGAY TUPA SITIO PANSUR | Region I | Pangasinan 1st DEO | On-Going | ₱93.1M | 61% | High risk95 | Flagged0.039 |
| 24AI0323CONCRETING OF PANGANG-GAAN-PRADO ROAD WITH BRIDGE REHABILITATION, BRGY. PANGANG-GAAN, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱49M | 0% | Medium risk55 | Flagged0.031 |
| 25A00278CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PANGASINAN-ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 2, PANGASINAN | Region I | Region I | On-Going | ₱65.5M | 1% | High risk65 | Flagged0.028 |
| 25A00277CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PANGASINAN-ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 1, PANGASINAN | Region I | Region I | On-Going | ₱65.5M | 0% | High risk65 | Flagged0.028 |
| 24AI0297CONCRETING OF DIKET-ANNAM ROAD, BRGY. DIKET, UMINGAN | Region I | Pangasinan 3rd DEO | On-Going | ₱3M | 0% | Medium risk37 | Flagged0.028 |
| 24AI0284CONCRETING OF SITIO AREOLA FARM TO MARKET ROAD AT BARANGAY STA. MARIA, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱13.7M | 0% | Medium risk46 | Flagged0.027 |
| 24AI0283CONCRETING OF BRGY. SAN VICENTE FARM TO MARKET ROAD, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱3M | 0% | Medium risk36 | Flagged0.027 |
| 24AI0296CONCRETING OF PUROK 3, BRGY. CABALITIAN FARM-TO-MARKET ROAD | Region I | Pangasinan 3rd DEO | On-Going | ₱3M | 0% | Medium risk37 | Flagged0.027 |
| 24AI0298CONCRETING OF ZONE 3 AND ZONE 4, BRGY CABARUAN FARM TO MARKET ROAD | Region I | Pangasinan 3rd DEO | On-Going | ₱3M | 0% | Medium risk37 | Flagged0.026 |
| 25AJ0105CONCRETING OF ROAD, BRGY. CARUNGAY, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱4.8M | 73% | High risk94 | Flagged0.019 |
| 25A00285WIDENING OF PERMANENT BRIDGES - BALANGOBONG BR. (B02152LZ) ALONG PANGASINAN-LA UNION INTER PROVL ROAD | Region I | Region I | On-Going | ₱136.6M | 12% | High risk62 | Flagged0.018 |
| 25AH0092INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING)ALONG PANG.-ZAM.RD.-K0358+(-910) | Region I | Pangasinan 2nd DEO | On-Going | ₱48.1M | 89% | High risk95 | Flagged0.017 |
| 17AH0127CONSTRUCTION/REHABILITATION OF MANGATAREM DISTRICT HOSPITAL, MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱19.3M | 100% | High risk84 | Flagged0.014 |
| 24A00021CONSTRUCTION OF BYPASS AND DIVERSION ROADS, PANGASINAN - ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 1, PANGASINAN | Region I | Region I | On-Going | ₱88.8M | 0% | Medium risk53 | Flagged0.011 |
| 25AF0017SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF COASTAL ACCESS ROAD FROM AGOO TO ARINGAY, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱96.5M | 77% | High risk69 | Flagged0.010 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24A00022CONSTRUCTION OF BYPASS AND DIVERSION ROADS, PANGASINAN - ZAMBALES ROAD TO JUDGE JOSE DE VENECIA BOULEVARD EXT'N ROAD (DAGUPAN CITY SECTION), PACKAGE 2, PANGASINAN | Region I | Region I | On-Going | ₱46.8M | 0% | Medium risk51 | Flagged0.007 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23AG0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE III | Region I | Pangasinan 1st DEO | Completed | ₱53.1M | 100% | Medium risk48 | —-0.080 |
| 127 | 23AG0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE II | Region I | Pangasinan 1st DEO | Completed | ₱53.1M | 100% | Medium risk48 | —-0.081 |
| 128 | 22AG0017FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (TAMBACAN SECTION) STA. 018+674 - STA. 019+323, BRGY. TAMBACAN, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.064 |
| 129 | 23AG0028FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (POBLACION WEST SECTION), STA. 001 + 900 - STA. 002 + 680, BARANGAY POBLACION WEST, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱51.1M | 100% | Medium risk47 | —-0.060 |
| 130 | 18AG0131BRIDGE-WIDENING OF PERMANENT BRIDGES-MATALAKITIK 2 BR. (B00713LZ) ALONG PANGASINAN-ZAMBALES ROAD KO334+750, BRGY. CAOAYAN, SUAL, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱41.9M | 100% | Medium risk47 | —-0.040 |
| 131 | 18DG0033ROAD WIDENING-SECONDARY ROADS-MAHOGANY AVE-K0059+211-K0060+174, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱33.3M | 100% | Medium risk47 | —-0.101 |
| 132 | 23AG0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN PACKAGE IV | Region I | Pangasinan 1st DEO | Completed | ₱48.2M | 100% | Medium risk47 | —-0.080 |
| 133 | 18AG0182BOBONOT-TAMBOBONG ROAD LEADING TO TAMBOBONG BEACH (BRIDGE REHABILITATION) DASOL, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.046 |
| 134 | 22AI0192CONSTRUCTION OF TWO (2) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING SAN VICENTE INTEGRATED SCHOOL AT UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.042 |
| 135 | 22AG0018FLOOD MANAGEMENT PROGRAM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ALAMINOS RIVER, PALAMIS SECTION, STA. 015+979 - STA. 016+495, ALAMINOS CITY, PANGASINAN AT BRGY. PALAMIS, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.062 |
| 136 | 24AG0016FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG ALAMINOS RIVER (BARANGAY CABATUAN-VICTORIA SECTION), STA.024+385- STA.024+629 AT ALAMINOS CITY, PANG | Region I | Pangasinan 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.065 |
| 137 | 23AH0013WIDENING OF PERMANENT BRIDGE AT BAGKET BR. (B02153LZ) ALONG PANG-LA UNION INTER-PROVL RD, SAN FABIAN | Region I | Pangasinan 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.050 |
| 138 | 18AG0142RETROFITTING/STRENGTHENING OF PERMANENT BRDIGES, TAMBACAN BR. (B00712LZ) ALONG PANGASINAN-ZAMBALES ROAD AT BURGOS, PANGASINAN KO301+380 | Region I | Pangasinan 1st DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.043 |
| 139 | 18GA0063ACCESS ROAD FROM MAKATO PROPER TO HAGACHAC LEADING TO BAYBAY BEACH AND ALIBAGON BAKHAWAN PARK, MAKATO, AKLAN | Region VI | Aklan DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.085 |
| 140 | 22AH0008WIDENING OF PERMANENT BRIDGE-CARPIO BR.(B00674LZ)ALONG PANG.-TARLAC RD. MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱23.6M | 100% | Medium risk47 | —-0.036 |
| 141 | 18DI0111ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - SECONDARY ROADS - STA. ROSA - ULAT - TAGAYTAY RD., K0040+670 - K0041+264, K0041+336 - K0041+400, STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.107 |
| 142 | 20AG0025REPLACEMENT OF PERMANENT WEAK BRIDGES-BARACBAC BR. (B00704LZ) ALONG PANGASINAN-ZAMBALES RD MABINI, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱31.7M | 100% | Medium risk47 | —-0.040 |
| 143 | 22AH0010WIDENING OF PERMANENT BRIDGES-GODOY BR.(B00672LZ)ALONG PANG.-TARLAC ROAD, MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱23.5M | 100% | Medium risk47 | —-0.050 |
| 144 | 22GA0039ACCESS ROAD FROM MAKATO PROPER TO HAGACHAC LEADING TO BAYBAY BEACH & ALIBAGON BAKHAWAN PARK MAKATO, AKLAN | Region VI | Aklan DEO | Completed | ₱33.3M | 100% | Medium risk47 | —-0.081 |
| 145 | 22AG0091BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TUPA, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.079 |
| 146 | 19II0010ROAD WIDENING, SECONDARY ROADS, LAOANG-CALOMOTAN RD, K0794+673 - K0796+823, SECOND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱32.6M | 100% | Medium risk47 | —-0.093 |
| 147 | 18AI0015CONSTN/IMPVT OF ACCESS RD LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS RD LEADING TO DEPALO FALL | Region I | Pangasinan 3rd DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.088 |
| 148 | 21A00098ROAD WIDENING - CARMEN JCT - MANAT ROAD - K0172+(-697)-K0172+620 | Region I | Region I | Completed | ₱34.8M | 100% | Medium risk47 | —-0.088 |
| 149 | 21BA0051CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO ITBAYAT AIRPORT/ NIA CIRCUMFERENTIAL ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | Completed | ₱60M | 100% | Medium risk47 | —-0.062 |
| 150 | 18AI0017NETWORK DEVT-IMPVT/WIDENING OF NATL RD ALONG BAKIT-BAKIT JCT-UMINGAN RD INCL ROW KO 200+000 - KO 200 | Region I | Pangasinan 3rd DEO | Completed | ₱41.3M | 100% | Medium risk47 | —-0.085 |