Contractor dossier
56 projects on file, including joint ventures this contractor is part of.
Total projects
56
Total budget
₱5.1B
Average progress
98.0%
Completion rate
76.8%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
6
10.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 42 | ₱4B | 57.7 | 4 | 98.4% |
| Region X | 12 | ₱846.7M | 49.2 | 1 | 100.0% |
| Central Office | 2 | ₱261.6M | 76.8 | 1 | 78.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 40 | ₱3.3B | 53.8 | 1 | 98.7% |
| Bridges, Roads | 6 | ₱864.5M | 71.3 | 5 | 90.0% |
| OTHER | 3 | ₱161.5M | 74.6 | 0 | 100.0% |
| Bridges | 3 | ₱188.4M | 49.3 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱222.3M | 55.9 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱294.5M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17L00069WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON ROAD INCLUDING RROW, (BRGY. BUDA SECT.),DAVAO CITY 3RD L | Region XI | Region XI | Completed | ₱104.4M | 100% | High risk80 | —-0.013 |
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Central Office | Bridges Management Cluster | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 17Z00026BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP II), CONTRACT PACKAGE 12, KAY TIALO BRIDGE (BRGY. STO CRISTO, DEL MONTE NORZAGARAY ROAD, SAN JOSE DEL MONTE, BULACAN, REGION III | Central Office | Bridges Management Cluster | Terminated | ₱52.7M | 100% | High risk75 | —-0.024 |
| 17LD0029WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, QUINOKOL BR. (BO0122MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO ROAD, (DAVAO CITY-JCT. DIGOS SECT.), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱45.1M | 100% | High risk72 | —-0.026 |
| 17LD0033WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, INAWAYAN BR. (BO1491MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO RD. (DAVAO CITY-JCT. DIGOS SECT.) (PHASE II), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱12M | 100% | High risk72 | —-0.027 |
| 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 20L00083REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱132.5M | 98% | High risk68 | Flagged0.008 |
| 20L00084REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱130.9M | 95% | High risk68 | Flagged0.009 |
| 21L00093CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, BARANGAY RUPARAN, BARANGAY TRES DE MAYO, BARANGAY COGON, BARANGAY ZONE 1 & BARANGAY APLAYA, DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱173.4M | 100% | High risk66 | —-0.037 |
| 20L00055REPLACEMENT OF BRIDGE (2 INTO 4 LANES) - ANGALAN BRIDGE 3 (B00216MN) ALONG DAVAO - BUKIDNON ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱143.8M | 100% | High risk65 | —-0.020 |
| 18L00188CONST. OF CONCRETE ROAD-BYPASS ROAD AT JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (AL | Region XI | Region XI | Completed | ₱270.5M | 100% | High risk65 | —-0.042 |
| 18L00040CONC. OF JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR RD) BYPASS RD, | Region XI | Region XI | Completed | ₱186.3M | 100% | High risk65 | —-0.057 |
| 18L00017WIDENING (2 INTO 4 LANES) OF DVO.-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT. | Region XI | Region XI | Completed | ₱137.4M | 100% | High risk64 | —-0.062 |
| 18K00149ROAD WIDENING OF BUKIDNON DAVAO CITY RD-K1606+987-K1608+271,K1608+315-K1611+000, BUKIDNON | Region X | Region X | Completed | ₱145.6M | 100% | High risk62 | —-0.067 |
| 18K00148ROAD WIDENING OF BUKIDNON-DAVAO CITY RD-K1592+203-K1597+300, BUKIDNON | Region X | Region X | Completed | ₱145M | 100% | High risk62 | —-0.068 |
| 22LB0274CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD - K1509+340 - K1509+440 | Region XI | Davao City DEO | On-Going | ₱94.6M | 58% | High risk62 | —-0.010 |
| 22L00077CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 1, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱116.7M | 98% | High risk62 | —-0.015 |
| 22L00078CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 2, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱117.6M | 99% | High risk62 | —-0.016 |
| 22LD0093RECONSTRUCTION TO CONCRETE PAVEMENT-JCT. SULOP (ALONG DIGOS-MAKAR ROAD) WATERFALL-LABON-OSMEÑA-BANATE (ALONG DIGOS-MAKAR ROAD), PACKAGE 3, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Central Office | Bridges Management Cluster | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 20L00084REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱130.9M | 95% | High risk68 | Flagged0.009 |
| 20L00083REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱132.5M | 98% | High risk68 | Flagged0.008 |
| 16KB0014CONCRETING OF BARANGAY MAGSAYSAY FARM TO MARKET, BARANGAY MAGSAYSAY, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱12.8M | 100% | Medium risk36 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17L00069WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON ROAD INCLUDING RROW, (BRGY. BUDA SECT.),DAVAO CITY 3RD L | Region XI | Region XI | Completed | ₱104.4M | 100% | High risk80 | —-0.013 |
| 2 | 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Central Office | Bridges Management Cluster | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 3 | 17Z00026BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP II), CONTRACT PACKAGE 12, KAY TIALO BRIDGE (BRGY. STO CRISTO, DEL MONTE NORZAGARAY ROAD, SAN JOSE DEL MONTE, BULACAN, REGION III | Central Office | Bridges Management Cluster | Terminated | ₱52.7M | 100% | High risk75 | —-0.024 |
| 4 | 17LD0029WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, QUINOKOL BR. (BO0122MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO ROAD, (DAVAO CITY-JCT. DIGOS SECT.), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱45.1M | 100% | High risk72 | —-0.026 |
| 5 | 17LD0033WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, INAWAYAN BR. (BO1491MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO RD. (DAVAO CITY-JCT. DIGOS SECT.) (PHASE II), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱12M | 100% | High risk72 | —-0.027 |
| 6 | 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 7 | 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 8 | 20L00083REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱132.5M | 98% | High risk68 | Flagged0.008 |
| 9 | 20L00084REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱130.9M | 95% | High risk68 | Flagged0.009 |
| 10 | 21L00093CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, BARANGAY RUPARAN, BARANGAY TRES DE MAYO, BARANGAY COGON, BARANGAY ZONE 1 & BARANGAY APLAYA, DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱173.4M | 100% | High risk66 | —-0.037 |
| 11 | 20L00055REPLACEMENT OF BRIDGE (2 INTO 4 LANES) - ANGALAN BRIDGE 3 (B00216MN) ALONG DAVAO - BUKIDNON ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱143.8M | 100% | High risk65 | —-0.020 |
| 12 | 18L00188CONST. OF CONCRETE ROAD-BYPASS ROAD AT JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (AL | Region XI | Region XI | Completed | ₱270.5M | 100% | High risk65 | —-0.042 |
| 13 | 18L00040CONC. OF JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR RD) BYPASS RD, | Region XI | Region XI | Completed | ₱186.3M | 100% | High risk65 | —-0.057 |
| 14 | 18L00017WIDENING (2 INTO 4 LANES) OF DVO.-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT. | Region XI | Region XI | Completed | ₱137.4M | 100% | High risk64 | —-0.062 |
| 15 | 18K00149ROAD WIDENING OF BUKIDNON DAVAO CITY RD-K1606+987-K1608+271,K1608+315-K1611+000, BUKIDNON | Region X | Region X | Completed | ₱145.6M | 100% | High risk62 | —-0.067 |
| 16 | 18K00148ROAD WIDENING OF BUKIDNON-DAVAO CITY RD-K1592+203-K1597+300, BUKIDNON | Region X | Region X | Completed | ₱145M | 100% | High risk62 | —-0.068 |
| 17 | 22LB0274CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD - K1509+340 - K1509+440 | Region XI | Davao City DEO | On-Going | ₱94.6M | 58% | High risk62 | —-0.010 |
| 18 | 22L00077CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 1, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱116.7M | 98% | High risk62 | —-0.015 |
| 19 | 22L00078CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 2, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱117.6M | 99% | High risk62 | —-0.016 |
| 20 | 22LD0093RECONSTRUCTION TO CONCRETE PAVEMENT-JCT. SULOP (ALONG DIGOS-MAKAR ROAD) WATERFALL-LABON-OSMEÑA-BANATE (ALONG DIGOS-MAKAR ROAD), PACKAGE 3, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.075 |
| 21 | 19L00028RECONST. OF CONCRETE PAVEMENT-ON SPECIFIC LOCATIONS ALONG DAVAO-BUKIDNON RD.(S01406MN) K1629+120-K16 | Region XI | Region XI | Completed | ₱99.3M | 100% | High risk61 | —-0.076 |
| 22 | 19K00011ROAD WIDENING, SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY ROAD-COTABATO BDRY.), K1592+197 - K1593+042, K1593+712 - K1596+058, K1596+088 - K1598+000, BUKIDNON | Region X | Region X | Completed | ₱137.8M | 100% | High risk61 | —-0.069 |
| 23 | 20L00119CONSTRUCTION OF CONCRETE ROAD - BYPASS ROAD, JCT. BABAK - SAMAL - KAPUTIAN ROAD - BRGY. SAN ANTONIO - TAGPOPONGAN, IGACOS CIRCUMFERENTIAL ROAD, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱90.6M | 100% | Medium risk58 | —-0.070 |
| 24 | 20L00166CONSTRUCTION OF ESPLANADE (TIMES BEACH SECTION) ALONG DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), DAVAO CITY | Region XI | Region XI | Completed | ₱289.5M | 100% | Medium risk58 | —-0.031 |
| 25 | 21L00092ROAD WIDENING - BYPASS ROAD, JCT. PADADA (ALONG DIGOS - MAKAR ROAD) - KIBLAWAN - JCT. MALUNGON (ALONG DIGOS - MAKAR ROAD), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱73.9M | 99% | Medium risk57 | —-0.017 |