Opening the dossier…
Opening the dossier…
Contractor dossier
90 projects on file, including joint ventures this contractor is part of.
Total projects
90
Total budget
₱2.2B
Average progress
93.4%
Completion rate
78.9%
Average risk score
54.7
Medium risk on average, out of 100
Flagged as unusual
3
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 88 | ₱2.1B | 54.9 | 3 | 93.2% |
| Region IV-A | 2 | ₱31.9M | 42.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱875.9M | 53.0 | 0 | 91.1% |
| Buildings and Facilities | 28 | ₱552.2M | 52.2 | 0 | 99.4% |
| Flood Control and Drainage | 14 | ₱445.2M | 56.3 | 1 | 92.8% |
| Water Provision and Storage | 5 | ₱56.3M | 47.4 | 0 | 90.6% |
| GAA 2025 SSP | 3 | ₱154.6M | 95.1 | 1 | 89.0% |
| OTHER | 2 | ₱93.2M | 65.0 | 1 | 68.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FL0072CONST. OF MP BUILDING (COVERED COURT) AT BRGY. ABAD SANTOS, BRGY. FABRICA, BRGY. G. DEL PILAR, BRGY. | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 94% | High risk95 | —-0.000 |
| 25FL0073CONST OF MP BUILDING (COVERED COURT) AT BRGY. HIDHID, BRGY. LABOY, MATNOG, BRGY. JAMORAWON, BRGY. LA | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 74% | High risk95 | Flagged0.007 |
| 25FL0051CONSTRUCTION OF FLOOD MITIGATION STRUCTUIRE, SITIO PANGDAN, BARANGAY BULACAO, GUBAT, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱57.6M | 99% | High risk95 | —-0.002 |
| 24FB0274OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGSAWA FLOOD MITIGATION STRUCTURE ALONG TRIBUTARIES OF BARANGAY BUDIAO, DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱93.1M | 25% | High risk82 | Flagged0.032 |
| 25FK0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE II P | Region V | Sorsogon DEO | On-Going | ₱48M | 38% | High risk79 | Flagged0.005 |
| 22FK0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP) ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION TO MONTE CARMELO-MILUYA-AMUMUNTING ROAD, CASTILLA | Region V | Sorsogon DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.087 |
| 22FK0064CLUSTER XXVI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION_IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS) 1.) CONSTRUCTION OF SORSOGON CITY POLI | Region V | Sorsogon DEO | On-Going | ₱86.1M | 100% | High risk66 | —-0.013 |
| 25FL0042CONST. OF RIVERBANK PROCTECTION ALONG CADAC-AN RIVER, PHASE 4, BARANGAY GURUYAN, JUBAN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱96.5M | 75% | High risk65 | —-0.039 |
| 24FL0060CONST. OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), BULAN NATIONAL HIGH SCHOOL, BULAN, SOR (PHASE 2) | Region V | Sorsogon 2nd DEO | On-Going | ₱38.8M | 100% | High risk61 | —-0.055 |
| 18FM0017CONCRETING OF ROADS JUNCTION NATIONAL ROAD - SITIO TACDUGAN. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.094 |
| 23FL0062CONCRETING OF FARM TO MARKET ROAD AT JUBAN, IROSIN AND PRIETO DIAZ, SORSOGON (CLUSTER XVIII) BRGY. C | Region V | Sorsogon 2nd DEO | Completed | ₱38.8M | 100% | High risk61 | —-0.040 |
| 18FB0076CONSTRUCTION OF ROAD, BRGY. ALOBO - BURGOS, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.098 |
| 24FK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY BON-OT, BACON DISTRICT, SORSOGON CIT | Region V | Sorsogon DEO | Completed | ₱48M | 100% | High risk60 | —-0.098 |
| 25FK0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE III | Region V | Sorsogon DEO | On-Going | ₱47.8M | 49% | High risk60 | —-0.057 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FB0274OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGSAWA FLOOD MITIGATION STRUCTURE ALONG TRIBUTARIES OF BARANGAY BUDIAO, DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱93.1M | 25% | High risk82 | Flagged0.032 |
| 25FL0073CONST OF MP BUILDING (COVERED COURT) AT BRGY. HIDHID, BRGY. LABOY, MATNOG, BRGY. JAMORAWON, BRGY. LA | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 74% | High risk95 | Flagged0.007 |
| 25FK0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE II P | Region V | Sorsogon DEO | On-Going | ₱48M | 38% | High risk79 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25FL0072CONST. OF MP BUILDING (COVERED COURT) AT BRGY. ABAD SANTOS, BRGY. FABRICA, BRGY. G. DEL PILAR, BRGY. | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 94% | High risk95 | —-0.000 |
| 2 | 25FL0073CONST OF MP BUILDING (COVERED COURT) AT BRGY. HIDHID, BRGY. LABOY, MATNOG, BRGY. JAMORAWON, BRGY. LA | Region V | Sorsogon 2nd DEO | On-Going | ₱48.5M | 74% | High risk95 | Flagged0.007 |
| 3 | 25FL0051CONSTRUCTION OF FLOOD MITIGATION STRUCTUIRE, SITIO PANGDAN, BARANGAY BULACAO, GUBAT, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱57.6M | 99% | High risk95 | —-0.002 |
| 4 | 24FB0274OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CAGSAWA FLOOD MITIGATION STRUCTURE ALONG TRIBUTARIES OF BARANGAY BUDIAO, DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱93.1M | 25% | High risk82 | Flagged0.032 |
| 5 | 25FK0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE II P | Region V | Sorsogon DEO | On-Going | ₱48M | 38% | High risk79 | Flagged0.005 |
| 6 | 22FK0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP) ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION TO MONTE CARMELO-MILUYA-AMUMUNTING ROAD, CASTILLA | Region V | Sorsogon DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.087 |
| 7 | 22FK0064CLUSTER XXVI-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-CONSTRUCTION_IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS) 1.) CONSTRUCTION OF SORSOGON CITY POLI | Region V | Sorsogon DEO | On-Going | ₱86.1M | 100% | High risk66 | —-0.013 |
| 8 | 25FL0042CONST. OF RIVERBANK PROCTECTION ALONG CADAC-AN RIVER, PHASE 4, BARANGAY GURUYAN, JUBAN, SORSOGON | Region V | Sorsogon 2nd DEO | On-Going | ₱96.5M | 75% | High risk65 | —-0.039 |
| 9 | 24FL0060CONST. OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), BULAN NATIONAL HIGH SCHOOL, BULAN, SOR (PHASE 2) | Region V | Sorsogon 2nd DEO | On-Going | ₱38.8M | 100% | High risk61 | —-0.055 |
| 10 | 18FM0017CONCRETING OF ROADS JUNCTION NATIONAL ROAD - SITIO TACDUGAN. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.094 |
| 11 | 23FL0062CONCRETING OF FARM TO MARKET ROAD AT JUBAN, IROSIN AND PRIETO DIAZ, SORSOGON (CLUSTER XVIII) BRGY. C | Region V | Sorsogon 2nd DEO | Completed | ₱38.8M | 100% | High risk61 | —-0.040 |
| 12 | 18FB0076CONSTRUCTION OF ROAD, BRGY. ALOBO - BURGOS, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱4.8M | 100% | High risk60 | —-0.098 |
| 13 | 24FK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY BON-OT, BACON DISTRICT, SORSOGON CIT | Region V | Sorsogon DEO | Completed | ₱48M | 100% | High risk60 | —-0.098 |
| 14 | 25FK0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE III | Region V | Sorsogon DEO | On-Going | ₱47.8M | 49% | High risk60 | —-0.057 |
| 15 | 20FK0048LOCAL ROAD AND BRIDGES-LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF SITIO MADAN-AN ROAD, SAN LORENZO, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱28.7M | 100% | Medium risk60 | —-0.062 |
| 16 | 19FL0083CONSTRUCTION AND REPAIR OF BULAN PUBLIC MARKET, BULAN, SORSOGON, BRGY. ZONE 4, BULAN, SORSOGON | Region V | Sorsogon 2nd DEO | Completed | ₱28.5M | 100% | Medium risk59 | —-0.092 |
| 17 | 22FK0082CLUSTER XXXIV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-1.) CONSTRUCTION OF ABAS CIRCUMFERENTIAL ROAD, BRGY | Region V | Sorsogon DEO | Completed | ₱14.4M | 100% | Medium risk59 | —-0.097 |
| 18 | 23FL0054CONST. OF MP BLDG. (MUN. SR. CITIZEN'S BLDG.), BARCELONA, (HALF-WAY HOME)BULAN, (LTO OFFICE BLDG.), | Region V | Sorsogon 2nd DEO | Completed | ₱34M | 100% | Medium risk59 | —-0.085 |
| 19 | 25FK0059CLUSTER XVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) REHABILITATION OF MONTE-CARMELO-ORAS ROAD, CASTI | Region V | Sorsogon DEO | On-Going | ₱32.2M | 6% | Medium risk59 | —-0.044 |
| 20 | 25FK0047CLUSTER X-CONVERGENCE AND SPECIAL SUPPORT (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) CONSTRUCTION OF ROAD, BRGY. SACLAYAN, CASTILLA, SORSOGON 2.) | Region V | Sorsogon DEO | On-Going | ₱39M | 22% | Medium risk59 | —-0.050 |
| 21 | 22FK0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF WATER SYSTEM AT BRGY. ABAS, BRGY. BAYAWAS, BRGY. LIPASON, BRGY. MALBOG, BRGY. PAMPANG AND BRGY. PUDO, PILAR | Region V | Sorsogon DEO | Completed | ₱17.9M | 100% | Medium risk58 | —-0.063 |
| 22 | 25FK0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BRGY. CADITAAN TO BRGY. MALBOG, MAGALLANES, SORSOGO | Region V | Sorsogon DEO | On-Going | ₱46.3M | 45% | Medium risk58 | —-0.056 |
| 23 | 24FK0010CLUSTER III-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES-1.) CONST. OF ROAD, BARANGAY PAMURAYAN, SOR. CITY 2.) CONST. | Region V | Sorsogon DEO | Completed | ₱45.5M | 100% | Medium risk58 | —-0.098 |
| 24 | 20FB0096FLOOD CONTROL STRUCTURES/FACILITIES: LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION AND IMPROVEMENT OF SUHA FLOOD CONTROL DIKE, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱9.9M | 100% | Medium risk58 | —-0.085 |
| 25 | 23FL0019COST. OF MP BUILDING AT BARCELONA, BULUSAN AND PRIETO DIAZ, SORSOGON (CLUSTER III) BRGY. ALEGRIA, BA | Region V | Sorsogon 2nd DEO | Completed | ₱36M | 100% | Medium risk58 | —-0.092 |