Opening the dossier…
Opening the dossier…
Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱182.3M
Average progress
100.0%
Completion rate
66.7%
Below 70%
Average risk score
62.4
High risk on average, out of 100
Flagged as unusual
1
33.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 3 | ₱182.3M | 62.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| OTHER | 1 | ₱131.2M | 83.6 | 1 | 100.0% |
| Flood Control and Drainage | 1 | ₱39.2M | 55.6 | 0 | 100.0% |
| Roads | 1 | ₱11.9M | 48.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24JA0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (STA. MARIA SECTION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱131.2M | 100% | High risk84 | Flagged0.024 |
| 2 | 23JA0015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MAASIN CREEK, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.2M | 100% | Medium risk56 | —-0.069 |
| 3 | 21JA0137CONCRETING OF SITIO PAPAYA BRGY. PAMUCUTAN, BRGY. PAMUCUTAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱11.9M | 100% | Medium risk48 | —-0.029 |