Contractor dossier
869 projects on file, including joint ventures this contractor is part of.
Total projects
869
Total budget
₱44B
Average progress
96.1%
Completion rate
90.6%
Average risk score
44.8
Medium risk on average, out of 100
Flagged as unusual
22
2.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 228 | ₱11B | 49.4 | 3 | 96.0% |
| Region IV-B | 126 | ₱4.3B | 29.0 | 2 | 95.4% |
| Region III | 113 | ₱5.6B | 38.2 | 1 | 96.3% |
| Region XI | 99 | ₱4.5B | 43.3 | 2 | 99.9% |
| Region IV-A | 97 | ₱5.7B | 52.9 | 1 | 97.3% |
| Region I | 48 | ₱4.1B | 54.8 | 5 | 92.2% |
| Region VIII | 32 | ₱1.9B | 51.9 | 0 | 98.6% |
| Region II | 27 | ₱562.8M | 36.8 | 0 | 100.0% |
| Region VI | 26 | ₱1.6B | 53.9 | 3 | 87.8% |
| Region XII | 22 | ₱787.9M | 26.4 | 0 | 99.8% |
| Region IX | 18 | ₱2.1B | 70.8 | 3 | 90.4% |
| Region V | 15 | ₱605.6M | 53.0 | 1 | 85.1% |
| Region X | 7 | ₱414.9M | 35.8 | 0 | 100.0% |
| Region VII | 6 | ₱589.5M | 60.7 | 1 | 89.6% |
| Negros Island Region | 3 | ₱190.6M | 50.6 | 0 | 100.0% |
| Central Office | 2 | ₱147.6M | 68.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 314 | ₱20B | 50.2 | 4 | 96.7% |
| Buildings and Facilities | 314 | ₱8.8B | 35.3 | 3 | 98.8% |
| Roads | 200 | ₱12.1B | 48.1 | 2 | 96.3% |
| Bridges | 21 | ₱1.5B | 54.2 | 9 | 49.7% |
| OTHER | 15 | ₱1.2B | 65.8 | 3 | 94.6% |
| Bridges, Roads | 2 | ₱374.9M | 66.4 | 0 | 82.2% |
| Water Provision and Storage | 2 | ₱6.5M | 41.9 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱63.7M | 94.6 | 1 | 35.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OI0095RETROFITTING OF PLEASANT DRIVE BRIDGE, BRGY. BAYANAN, MUNTINLUPA CITY. | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱63.7M | 35% | High risk95 | Flagged0.024 |
| 24JA0146CONSTRUCTION/REHABILITATION OF ZAMBOANGA CONVENTION CENTER, PASONANCA, ZAMBOANGA CITY PHASE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱117.6M | 30% | High risk84 | Flagged0.031 |
| 23GE0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SEBARIO RIVER, BARANGAY SEBARIO, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱57.9M | 99% | High risk82 | Flagged0.016 |
| 24CC0546CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY MEYTO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk81 | Flagged0.008 |
| 24CM0078FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱386M | 100% | High risk80 | —-0.019 |
| 24JK0003CONSTRUCTION OF FLOOD CONTROL PROJECT IN BARANGAY PASONANCA, PHASE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱143.3M | 59% | High risk80 | Flagged0.050 |
| 24CC0550CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH WATER PUNMPING STATION AT BARANGAY PANGINAY, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 74% | High risk79 | —-0.015 |
| 25DI0006CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SAN LORENZO ROAD, PHASE 1, SANTA ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.3M | 69% | High risk79 | —-0.009 |
| 24C00158ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱174.2M | 67% | High risk77 | —-0.002 |
| 24HC0019ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF BIEN UNIDO SEAWALL AT BIEN UNIDO, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱144.7M | 89% | High risk77 | Flagged0.030 |
| 25CC0462SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES 9ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) PULILAN-BALIUAG BYPASS ROAD - BARANGAY SANTA PEREGRINA (PHASE 2), CHAINAGE 1300-CHAINAGE 3890, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 25% | High risk76 | —-0.012 |
| 25CC0457SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - PULILAN-BALIUAG BYPASS ROAD - DULONG MALABON, CHAINAGE 0-CHAINAGE 1300, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 53% | High risk76 | —-0.020 |
| 22GA0030CONSTRUCTION OF REVETMENT WALL ALONG IBAJAY RIVER BRGY. LAGUINBANWA, IBAJAY, AKLAN | Region VI | Aklan DEO | Completed | ₱86.8M | 100% | High risk76 | —-0.018 |
| 25CD0178CONSTRUCTION OF BARANGAY ROADS, BRGY. CAYSIO, CAYPOMBO AND MAG-ASAWANG SAPA, SANTA MARIA, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 0% | High risk76 | —-0.007 |
| 23CC0284CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PAGALA, BALIUAG, BULACAN (K005+681 TO K005+981), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23JF0048CONSTRUCTION OF SHORELINE PROTECTION, BARANGAY PRESIDENT ROXAS, R.T. LIM, ZAMBOANGA SIBUGAY PACKAGE 1 | Region IX | Zamboanga Sibugay 2nd DEO | On-Going | ₱144.7M | 98% | High risk75 | —-0.011 |
| 25JK0028CONSTRUCTION OF FLOOD MITIGATION PROJECT (PHASE 2) IN BARANGAY PASONANCA, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱95M | 72% | High risk75 | —-0.017 |
| 24CD0259REHABILITATION OF PUMPING STATIONS WITHIN MARILAO AND MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱56.9M | 100% | High risk74 | —-0.058 |
| 23OE0216CONSTRUCTION OF PUMPING STATION AT ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.6M | 100% | High risk74 | —-0.005 |
| 18J00085CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL-DRAINAGE AT ISABELA CITY PROPER, ISABELA CITY, BASILAN | Region IX | Region IX | Completed | ₱130.3M | 100% | High risk73 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JK0003CONSTRUCTION OF FLOOD CONTROL PROJECT IN BARANGAY PASONANCA, PHASE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱143.3M | 59% | High risk80 | Flagged0.050 |
| 24JA0146CONSTRUCTION/REHABILITATION OF ZAMBOANGA CONVENTION CENTER, PASONANCA, ZAMBOANGA CITY PHASE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱117.6M | 30% | High risk84 | Flagged0.031 |
| 24HC0019ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF BIEN UNIDO SEAWALL AT BIEN UNIDO, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱144.7M | 89% | High risk77 | Flagged0.030 |
| 25OI0095RETROFITTING OF PLEASANT DRIVE BRIDGE, BRGY. BAYANAN, MUNTINLUPA CITY. | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱63.7M | 35% | High risk95 | Flagged0.024 |
| 23J00212CONSTRUCTION OF NEW PROVINCIAL GOVERNMENT CAPITOL BUILDING, KARUNGDUNG, BONGAO, TAWI-TAWI | Region IX | Region IX | On-Going | ₱240.8M | 80% | High risk72 | Flagged0.023 |
| 23GE0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SEBARIO RIVER, BARANGAY SEBARIO, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱57.9M | 99% | High risk82 | Flagged0.016 |
| 25D00172CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE S, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱187.2M | 11% | High risk66 | Flagged0.014 |
| 24EF0065WIDENING OF PERMANENT BRIDGES BATANG-BATANG BR. (B00035PW) ALONG PUERTO PRINCESA SOUTH RD., NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱117M | 58% | High risk60 | Flagged0.014 |
| 24G00041CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG-BUNGOL RIVER (SO. LAPAK), ILOG, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱193M | 40% | High risk66 | Flagged0.013 |
| 23A00451REPAIR/ REHABILITATION OF CALUNGBUYAN BR. ALONG SANTA-RANCHO ROAD, SANTA, ILOCOS SUR | Region I | Region I | On-Going | ₱178.5M | 90% | High risk63 | Flagged0.012 |
| 25A00159CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG - SAN FERNANDO - SAN JUAN BYPASS ROAD, (SAN FERNANDO- SAN JUAN SECTION), PACKAGE 2, LA UNION | Region I | Region I | On-Going | ₱88.7M | 10% | Medium risk52 | Flagged0.012 |
| 25A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTE | Region I | Region I | On-Going | ₱112.3M | 0% | High risk66 | Flagged0.009 |
| 24A00621CONSTRUCTION/REPAIR/REHABILITATION OF DORMITORY - MARIANO MARCOS STATE UNIVERSITY | Region I | Region I | On-Going | ₱48.8M | 90% | Medium risk50 | Flagged0.009 |
| 24CC0546CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY MEYTO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk81 | Flagged0.008 |
| 22E00133SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF CRUISE PORT AND FACILITIES-PACKAGE F, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱95.5M | 52% | Medium risk52 | Flagged0.007 |
| 23OI0103CONSTRUCTION OF BYPASS / ALTERNATE DIVERSION ROAD, ALABANG ZAPOTE ROAD, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱46.7M | 0% | Medium risk50 | Flagged0.006 |
| 24F00007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-DARAGA ALBAY DIVERSION ROAD (TABON-TABON FLYOVER), ALBAY, BRGY. TABON-TABON, DARAGA, AL | Region V | Region V | On-Going | ₱139.4M | 3% | High risk72 | Flagged0.005 |
| 25GD0060WIDENING OF BRIDGE - ANHAWON BR. (B00244PN) ALONG ILOILO EAST COAST-CAPIZ RD (PHASE II) | Region VI | Capiz 1st DEO | On-Going | ₱37M | 7% | Medium risk48 | Flagged0.003 |
| 21L00012CONSTRUCTION OF ROAD, POBLACION, MARAGUSAN - PALOC ROAD, PACKAGE 3, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱125.4M | 91% | High risk63 | Flagged0.002 |
| 25A00226CONSTRUCTION OF MISSING LINKS/NEW ROADS - SANTOL (LA UNION) - KIBUNGAN (BENGUET) ROAD (SUGPON SECTION), LA UNION | Region I | Region I | On-Going | ₱56.1M | 25% | Medium risk53 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 18IL0014REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS/DAANG MAHARLIKA (LT) - K1015+996-K1016+038 (CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱58.8M | 100% | Medium risk55 | —-0.090 |
| 202 | 25IL0024NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BDRY SOUTHERN LEYTE-MAASIN-MACROHON-SOGOD-JCT DAANG MAHARLIKA - K1154+262 - K1156+000 | Region VIII | Southern Leyte 1st DEO | On-Going | ₱57.9M | 65% | Medium risk55 | —-0.045 |
| 203 | 19OE0237CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM SCHOOL BUILDING AT MANUEL L. QUEZON ELEMENTARY SCHOOL (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱68M | 100% | Medium risk55 | —-0.039 |
| 204 | 18OH0173PROPOSED CONSTRUCTION OF FOUR (4) STOREY, TWENTY FOUR (24) CLASSROOMS SCHOLL BUILDING AT JOSE RIZAL | National Capital Region | South Manila DEO | Completed | ₱63.5M | 100% | Medium risk55 | —-0.029 |
| 205 | 24GJ0010(RE-AD) REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - ILOILO BR.2 (B00557PN) ALONG PRESIDENT CORAZON C. AQUINO AVE. | Region VI | Iloilo City DEO | Completed | ₱10.8M | 100% | Medium risk55 | —-0.030 |
| 206 | 21O00107MANILA BAY REHABILITATION PROGRAM: INSTALLATION OF CONTAINMENT DEVICES (TRASHBOOM/SILT CURTAIN) | National Capital Region | National Capital Region | Completed | ₱57.6M | 100% | Medium risk55 | —-0.044 |
| 207 | 22OH0015ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-PRES. QUIRINO AVE.-K0005+883-K0006+778 | National Capital Region | South Manila DEO | Completed | ₱57.8M | 100% | Medium risk54 | —-0.095 |
| 208 | 24M00158REPLACEMENT OF BRIDGE - APOPONG BR. (B01019MN) ALONG MAKAR-MARBEL RD, K1659 + 301 - K1659 + 358, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱135.1M | 96% | Medium risk54 | —-0.003 |
| 209 | 18OB0457CONSTRUCTION OF FOUR (4) STOREY, TWELVE (12) CLASSROOM, SSS VILLAGE ELEMENTARY SCHOOL, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱58.5M | 100% | Medium risk54 | —-0.041 |
| 210 | 20LH0010CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG DAVAO RIVER, PANGYAN, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱90.5M | 100% | Medium risk54 | —-0.066 |
| 211 | 22OB0102CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER, FACING DOWNSTREAM (EAST BANK), PACKAGE 4, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱91.6M | 100% | Medium risk54 | —-0.077 |
| 212 | 22OB0107CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER, FACING DOWNSTREAM (EAST BANK), PACKAGE 6, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱91.6M | 100% | Medium risk54 | —-0.078 |
| 213 | 18LA0062CONCRETING OF PANTUKAN MARICULTURE PARK ACCESS ROAD CONNECTING TO PANTUKAN PUBLIC TRANSPORT TERMINAL AND MARICULTURE PARK LANDING FACILITIES, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.084 |
| 214 | 21DO0057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WIH SLIPS SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS MANILA EAST RD K0039+(-644.10) - K0039+(-473.90) AND K0039 | Region IV-A | Rizal 2nd DEO | Completed | ₱62.7M | 100% | Medium risk54 | —-0.102 |
| 215 | 22OB0159CONSTRUCTION OF SLOPE PROTECTION AT LABASAN PUMPING STATION RETARDING POND, TAGUIG CITY (PACKAGE 2) | National Capital Region | Metro Manila 1st DEO | Completed | ₱89.8M | 100% | Medium risk54 | —-0.079 |
| 216 | 24DP0032ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - LIPA CITY - ALAMINOS RD - K0079 + 000 - K0079 + 300 | Region IV-A | Laguna 3rd DEO | Completed | ₱86.8M | 100% | Medium risk54 | —-0.097 |
| 217 | 23DP0001ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0073 + 000 - K0074 + 367 | Region IV-A | Laguna 3rd DEO | Completed | ₱62.8M | 100% | Medium risk54 | —-0.100 |
| 218 | 20EE0016REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE ANDLANDSLIDE ALONG EL NIDO-JCT. NEW IBAJAY ROAD, KO299+000-KO299+284EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱95.6M | 100% | Medium risk54 | —-0.066 |
| 219 | 18LE0078NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS-SECONDARY ROADS, DAVAO-SARANGANI COASTAL ROAD (MALALAG-MALITA-JAS-GLAN)KM. 1683 + 1009- KM. 1685 + 458 | Region XI | Davao Occidental DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.080 |
| 220 | 18BA0063COMPLETION OF IVANA PORT, BRGY. RADIWAN, IVANA, BATANES | Region II | Batanes DEO | Completed | ₱45M | 100% | Medium risk54 | —-0.045 |
| 221 | 22IL0015NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS BDRY SOUTHERN LEYTE-MAASIN-MACROHON-SOGOD-JCT DAANG MAHARLIKA - K1151+000 - K1153+931 MACROHON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱55.3M | 100% | Medium risk54 | —-0.088 |
| 222 | 21AE0047CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF PROVINCIAL EXECUTIVE BUILDING (PHASE 3) | Region I | La Union 1st DEO | Completed | ₱47M | 100% | Medium risk54 | —-0.079 |
| 223 | 19L00150ROAD WIDENING ON SPECIFIC LOCATIONS ALONG BABAK-SAMAL-KAPUTIAN ROAD (S00095MN), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱55.6M | 100% | Medium risk54 | —-0.079 |
| 224 | 18EE0028REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSEAND LANDSLIDE ALONG PUERTO PRINCESA NORTH RD. K00266+067-K00266+140; K00266+240-K0266+290; K00225+026-K00225+086EL NIDO & TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱94.6M | 100% | Medium risk54 | —-0.063 |
| 225 | 20GA0119ROAD WIDENING- JAIME CARDINAL SIN AVE. -K0279+955 -K0282+453, KALIBO, AKLAN | Region VI | Aklan DEO | Completed | ₱82.1M | 100% | Medium risk53 | —-0.075 |