Opening the dossier…
Opening the dossier…
Contractor dossier
28 projects on file, including joint ventures this contractor is part of.
Total projects
28
Total budget
₱1.4B
Average progress
95.2%
Completion rate
85.7%
Average risk score
60.9
High risk on average, out of 100
Flagged as unusual
1
3.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 28 | ₱1.4B | 60.9 | 1 | 95.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 14 | ₱749.3M | 63.0 | 1 | 90.4% |
| Flood Control and Drainage | 13 | ₱628.9M | 57.5 | 0 | 100.0% |
| OTHER | 1 | ₱18.9M | 75.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FB0262CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF IMALNOD-MARIAWA ROAD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 50% | High risk76 | Flagged0.007 |
| 17FL0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BULAN SEAPORT, BULAN, SORSOGON AND OFF-CARRIAGEWA | Region V | Sorsogon 2nd DEO | Completed | ₱18.9M | 100% | High risk75 | —-0.035 |
| 24FB0104SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF GOTOB-TALADONG ROAD AT BARANGAY GOTOB AND BARANGAY TALADONG, CAMALIG, | Region V | Albay 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.090 |
| 18F00069OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, JCT. DONSOL-BANUANG GURANG ROAD, SORSOGON 1ST DISTRICT | Region V | Region V | Completed | ₱117.6M | 100% | High risk67 | —-0.078 |
| 24FB0013BIP: CONSTRUCTION OF ROAD, IRAYA -DAGINDINGAN - ABGAO, BARANGAY LACAG, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱57.6M | 48% | High risk67 | —-0.050 |
| 19FK0039CLUSTER VII-LOCAL ROADS AND BRIDGES-CONSTRUCTION/REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, PILAR | Region V | Sorsogon DEO | Completed | ₱83.8M | 100% | High risk66 | —-0.093 |
| 17FK0033REHAB. /RECONST. OF NAT'L. ROADS W/SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG DAANG MAHARLIKA TERTIARY ROADS-JCT-DONSOL-BANUANG GURANG ROAD, DONSOL, SORSOGON | Region V | Sorsogon DEO | Completed | ₱10.3M | 100% | High risk66 | —-0.067 |
| 17FK0031ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF MAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) TERTIARY RECONSTRUCTION FROM CONCRETE TO CONCRETE JCT. DONSOL-BANUAN | Region V | Sorsogon DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.056 |
| 22FB0118BIP: CONSTRUCTION OF LIGBAN-GOTOB ROAD, BARANGAY LIGBAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱47.8M | 94% | High risk64 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FB0262CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF IMALNOD-MARIAWA ROAD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 50% | High risk76 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24FB0262CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF IMALNOD-MARIAWA ROAD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 50% | High risk76 | Flagged0.007 |
| 2 | 17FL0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BULAN SEAPORT, BULAN, SORSOGON AND OFF-CARRIAGEWA | Region V | Sorsogon 2nd DEO | Completed | ₱18.9M | 100% | High risk75 | —-0.035 |
| 3 | 24FB0104SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF GOTOB-TALADONG ROAD AT BARANGAY GOTOB AND BARANGAY TALADONG, CAMALIG, | Region V | Albay 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.090 |
| 4 | 18F00069OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, JCT. DONSOL-BANUANG GURANG ROAD, SORSOGON 1ST DISTRICT | Region V | Region V | Completed | ₱117.6M | 100% | High risk67 | —-0.078 |
| 5 | 24FB0013BIP: CONSTRUCTION OF ROAD, IRAYA -DAGINDINGAN - ABGAO, BARANGAY LACAG, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱57.6M | 48% | High risk67 | —-0.050 |
| 6 | 19FK0039CLUSTER VII-LOCAL ROADS AND BRIDGES-CONSTRUCTION/REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, PILAR | Region V | Sorsogon DEO | Completed | ₱83.8M | 100% | High risk66 | —-0.093 |
| 7 | 17FK0033REHAB. /RECONST. OF NAT'L. ROADS W/SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG DAANG MAHARLIKA TERTIARY ROADS-JCT-DONSOL-BANUANG GURANG ROAD, DONSOL, SORSOGON | Region V | Sorsogon DEO | Completed | ₱10.3M | 100% | High risk66 | —-0.067 |
| 8 | 17FK0031ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF MAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT (HDM-4) TERTIARY RECONSTRUCTION FROM CONCRETE TO CONCRETE JCT. DONSOL-BANUAN | Region V | Sorsogon DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.056 |
| 9 | 22FB0118BIP: CONSTRUCTION OF LIGBAN-GOTOB ROAD, BARANGAY LIGBAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱47.8M | 94% | High risk64 | —-0.045 |
| 10 | 23FK0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE_FACILITIES-CONSTRUCTION OF RIVER CONTROL AT SITIO GAYONG, BRGY. STO. NIÑO, BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱69.2M | 100% | Medium risk60 | —-0.082 |
| 11 | 18FK0041CLUSTER VIII-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONST./OF ALIN-BANBAN-CABIGUAN ROAD INCLUDING DRAINAGE, CONST. OF SAN ISIDRO-SAN ANTONIO ROAD INCLUDING DRAINAGE AND CONST. OF | Region V | Sorsogon DEO | Completed | ₱42.6M | 100% | Medium risk60 | —-0.101 |
| 12 | 24FB0258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF PUROK 1, CAGBACONG BARANGAY ROAD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱14M | 73% | Medium risk59 | —-0.010 |
| 13 | 20FB0093FLOOD CONTROL STRUCTURES/FACILITIES: LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION/ENHANCEMENT OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BRGY. ARIMBAY, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱49.5M | 100% | Medium risk58 | —-0.088 |
| 14 | 21FB0049LIP - FLOOD CONTROL AND DRAINAGE: CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG SITIO BUGIT, IMALNOD, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.087 |
| 15 | 18FL0016OFF-CARRIAGEWAY IMPRVT. - TERTIARY ROADS - ARIMAN-BULUSAN LAKE RD K0607+370-K0607+899,K0626+511-K062 | Region V | Sorsogon 2nd DEO | Completed | ₱47.4M | 100% | Medium risk58 | —-0.098 |
| 16 | 19FB0162FLOOD CONTROL STRUCTURES / FACILITIES: FLOOD MITIGATION SYSTEM (DIKE WITH SHEET PILES) ALONG LACAG-INARADO-GAPO RIVER, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱23.6M | 100% | Medium risk58 | —-0.087 |
| 17 | 23FB0142SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG PUROK 3 SITIO LAOM, BRGY. PADANG (UPSTREAM) PHASE 2, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱48.9M | 100% | Medium risk58 | —-0.088 |
| 18 | 20FK0035CONSTRUCTION OF RIVER CONTROL, BARANGAY OSIAO BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱57.1M | 100% | Medium risk58 | —-0.085 |
| 19 | 21FB0155LIP - FLOOD CONTROL STRUCTURES/FACILITIES: CONSTRUCTION/ENHANCEMENT OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG HOMAPON-MARIAWA RIVER, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱39.6M | 100% | Medium risk58 | —-0.088 |
| 20 | 22FB0049BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE AND DRAINAGE SYSTEM ALONG BARANGAY 49-BIGAA RIVER (UPSTREAM SECTION), LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.088 |
| 21 | 22FK0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES_FACILITIES-CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BRGY. OSIAO, BACON DISTRICT, SORSOGON | Region V | Sorsogon DEO | Completed | ₱55.9M | 100% | Medium risk57 | —-0.085 |
| 22 | 22FB0134FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER BANK PROTECTION WORKS (DOWNSTREAM) OF BARANGAY PADANG, PADANG, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱39.2M | 100% | Medium risk57 | —-0.088 |
| 23 | 23FK0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE_FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS ALONG GAYONG RIVER, BRGY. STO. NIÑO, BACON DISTRICT, SORSO | Region V | Sorsogon DEO | Completed | ₱49.5M | 100% | Medium risk57 | —-0.087 |
| 24 | 17FL0038OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG ARIMAN-JCT BULUSAN LAKE ROAD, K0618+408-K0619+7 | Region V | Sorsogon 2nd DEO | Completed | ₱48.2M | 100% | Medium risk56 | —-0.051 |
| 25 | 18FK0034FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER CONTROL AT OSIAO, BACON DISTRICT, SORSOGON CITY | Region V | Sorsogon DEO | Completed | ₱47.1M | 100% | Medium risk55 | —-0.086 |