Contractor dossier
541 projects on file, including joint ventures this contractor is part of.
Total projects
541
Total budget
₱15.7B
Average progress
91.7%
Completion rate
80.8%
Average risk score
47.7
Medium risk on average, out of 100
Flagged as unusual
32
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 288 | ₱10.1B | 54.6 | 32 | 87.2% |
| National Capital Region | 82 | ₱1.7B | 37.0 | 0 | 95.2% |
| Region III | 63 | ₱1.8B | 31.9 | 0 | 98.5% |
| Region IV-A | 46 | ₱720.8M | 48.4 | 0 | 95.6% |
| Region IV-B | 25 | ₱622.4M | 41.9 | 0 | 96.6% |
| Region II | 16 | ₱335.8M | 45.5 | 0 | 100.0% |
| Cordillera Administrative Region | 15 | ₱254.1M | 48.2 | 0 | 96.8% |
| Region VII | 4 | ₱29.3M | 42.4 | 0 | 100.0% |
| Region VIII | 2 | ₱113.5M | 52.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 491 | ₱13.4B | 45.2 | 26 | 91.9% |
| GAA 2025 OO-1 | 33 | ₱871.8M | 81.8 | 5 | 89.3% |
| Roads | 9 | ₱1.3B | 64.9 | 1 | 81.6% |
| Buildings and Facilities | 6 | ₱69.7M | 33.3 | 0 | 100.0% |
| OTHER | 1 | ₱55.6M | 74.8 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱13.8M | 47.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00118REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0565 + 850 - K0565+865, K0572+465 - K0572+540, K0578+380 - K0578+390, K0578+711 - K0578+855 | Region I | Region I | On-Going | ₱203.6M | 81% | High risk94 | Flagged0.035 |
| 25A00427CONSTRUCTION OF NEW BRIDGES, PANCIAN VIADUCT ALONG MANILA NORTH RD (PHASE IV) | Region I | Region I | On-Going | ₱298.6M | 1% | High risk94 | Flagged0.066 |
| 25AA0019BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, TULNAGAN BR. 1 (B04885LZ) ALONG MANILA NORTH RD | Region I | Ilocos Norte 1st DEO | On-Going | ₱23.8M | 86% | High risk93 | Flagged0.004 |
| 25EI0177RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: BATANGAN BRIDGE, BATANGAN, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱42.7M | 90% | High risk91 | —-0.005 |
| 25A00029RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, CABAROAN BR. (B04862LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱20.1M | 100% | High risk91 | —-0.004 |
| 25C00482BRIDGE PROGRAM-1.)RETROFITTING/STRENGHTENING OF PERMANENT BRIDGES-AGUANG BRIDGE (BO3015LZ) ALONG BALER-CASIGURAN ROAD (BALER-DINADIAWAN, AND 2.) REHAB./MAJOR REPAIR OF PERMANENT BRIDGES-MALUPA BRIDGE (BO3007LZ) ALONG CASTANEDA-MA. AURORA-SAN LUIS ROAD | Region III | Region III | On-Going | ₱40.6M | 100% | High risk91 | —-0.013 |
| 25DM0035BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - MULIGUIN BR. 3 (B02960LZ) ALONG P BURGOS-POTOTANIN JCT, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱6.7M | 100% | High risk91 | —-0.014 |
| 25A00054RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, OAIG DAYA PARALLEL BR. (B04997LZ) ALONG CANDON BYPASS RD | Region I | Region I | On-Going | ₱16.3M | 100% | High risk90 | —-0.004 |
| 25A00072RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - PALARIS BR. (B01619LZ) ALONG BINALONAN-ASINGAN-SANTA MARIA RD | Region I | Region I | On-Going | ₱6.6M | 100% | High risk90 | —-0.006 |
| 25O00030REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES - EDSA/SANTOLAN FLYOVER (NB) (B02931LZ) ALONG EDSA/SANTOLAN FLYOVER | National Capital Region | National Capital Region | On-Going | ₱28.4M | 89% | High risk89 | —-0.018 |
| 25A00045RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BONCATO BR.(B00745LZ) ALONG PANGASINAN-NUEVA VIZCAYA RD | Region I | Region I | On-Going | ₱6.2M | 100% | High risk89 | —-0.005 |
| 25A00027RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, OLD POBLACION BR.(B04859LZ) ALONG ALILEM-SUGPON-SUDIPEN RD | Region I | Region I | On-Going | ₱14.6M | 100% | High risk88 | —-0.005 |
| 25A00065RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, AMLANG BR.(B02629LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱7M | 100% | High risk87 | —-0.006 |
| 25A00047RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, NINING BR. 1(B00839LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD | Region I | Region I | On-Going | ₱11.8M | 100% | High risk87 | —-0.007 |
| 25A00025RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, BAGUI-ING BR. (B02655LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱6.7M | 100% | High risk87 | —-0.004 |
| 25A00069RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, STA. RITA BR. (B02653LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱6.7M | 0% | High risk86 | Flagged0.027 |
| 25A00033RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - AMANDIEGO BRIDGE (B00705LZ) ALONG PANGASINAN-ZAMBALES RD | Region I | Region I | On-Going | ₱5.6M | 100% | High risk85 | —-0.001 |
| 25A00053RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, OAIG DAYA BR. (B04996LZ) ALONG CANDON BYPASS RD | Region I | Region I | Completed | ₱16.3M | 100% | High risk84 | —-0.028 |
| 25A00066RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, TUBOD BR.(B02630LZ) ALONG MANILA NORTH RD | Region I | Region I | Completed | ₱10.7M | 100% | High risk78 | —-0.031 |
| 25A00076RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MALABAGO BR.(B01965LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD | Region I | Region I | Completed | ₱7.7M | 100% | High risk78 | —-0.032 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00427CONSTRUCTION OF NEW BRIDGES, PANCIAN VIADUCT ALONG MANILA NORTH RD (PHASE IV) | Region I | Region I | On-Going | ₱298.6M | 1% | High risk94 | Flagged0.066 |
| 25A00118REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0565 + 850 - K0565+865, K0572+465 - K0572+540, K0578+380 - K0578+390, K0578+711 - K0578+855 | Region I | Region I | On-Going | ₱203.6M | 81% | High risk94 | Flagged0.035 |
| 25A00014RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GILBERT BR. 1 (B00897LZ) ALONG MANILA NORTH RD. | Region I | Region I | On-Going | ₱140.4M | 0% | High risk74 | Flagged0.029 |
| 25A00074RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - NARCISO RAMOS BR. (B01626LZ) ALONG BINALONAN-ASINGAN-SANTA MARIA RD (PHASE III) | Region I | Region I | On-Going | ₱234M | 18% | High risk64 | Flagged0.028 |
| 25A00011RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, PAGUDPUD BR. (B00669LZ) ALONG SAN FERNANDO AIRPORT RD | Region I | Region I | On-Going | ₱1.2M | 0% | High risk66 | Flagged0.027 |
| 25A00069RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, STA. RITA BR. (B02653LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱6.7M | 0% | High risk86 | Flagged0.027 |
| 25A00016RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BAGBAG BR. 2 (B00813LZ) ALONG LAOAG-SARRAT-PIDDIG-SOLSONA RD | Region I | Region I | On-Going | ₱140.4M | 2% | High risk72 | Flagged0.027 |
| 25A00013RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GILBERT BR. 2 (B00842LZ) ALONG MANILA NORTH RD. | Region I | Region I | On-Going | ₱140.4M | 16% | High risk74 | Flagged0.024 |
| 24A00663REPAIR/REHABILITATION OF MANAT BRIDGE 2 (B02148LZ) ALONG PANGASINAN-ZAMBALES ROAD | Region I | Region I | On-Going | ₱25.3M | 72% | Medium risk51 | Flagged0.021 |
| 24A00679REPAIR / REHABILITATION OF CADARATAN BR. (B00528LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱4.1M | 0% | Medium risk43 | Flagged0.014 |
| 24A00681REPAIR / REHABILITATION OF PATAPAT VIADUCT (B00547LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱18.8M | 0% | High risk67 | Flagged0.012 |
| 24A00678REPAIR / REHABILITATION OF BAAG BR. (B04590LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱18.7M | 0% | High risk67 | Flagged0.012 |
| 25A00044RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - HECTOR MENDOZA BR. (B03217LZ) ALONG CARMEN JCT-MANAT RD (PHASE IV) | Region I | Region I | On-Going | ₱115.7M | 11% | High risk62 | Flagged0.010 |
| 25A00028RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES, MASUPE BR. (B04861LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱2.9M | 0% | Low risk29 | Flagged0.009 |
| 25A00070RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, BANILA BR.(B00850LZ) ALONG SN NICOLAS-NATIVIDAD-SN QUINTIN-UMINGAN-GUIMBA RD | Region I | Region I | On-Going | ₱97.8M | 13% | High risk62 | Flagged0.009 |
| 23A00460REPAIR / REHABILITATION OF CARAYUNGAN BR. (B00878LZ) ALONG BAKIT-BAKIT JCT. - UMINGAN RD | Region I | Region I | On-Going | ₱28.9M | 8% | Medium risk49 | Flagged0.009 |
| 25A00020RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, SUSO BR.(B04993LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱25.9M | 0% | Medium risk47 | Flagged0.009 |
| 25A00035RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - COLOS BOA BRIDGE (B00710LZ) ALONG PANGASINAN-ZAMBALES RD | Region I | Region I | On-Going | ₱2.8M | 0% | Low risk26 | Flagged0.009 |
| 25A00004RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, PIAS BR. (B02422LZ) ALONG SN FERNANDO-BAGULIN RD | Region I | Region I | On-Going | ₱6.3M | 0% | Medium risk46 | Flagged0.008 |
| 25A00002RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, NAGYUBUYUBAN BR. (B04928LZ) ALONG SN FERNANDO-BAGULIN RD | Region I | Region I | On-Going | ₱9.8M | 0% | Medium risk46 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 401 | 25ED0130RETROFITTING/STRENGTHENING OF NAGPANTAY BRIDGE, SAN RAFAEL, SAN TEODORO,ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱19.6M | 100% | Medium risk40 | —-0.053 |
| 402 | 22CL0002RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MACULCOL BR. (B01393LZ) ALONG OLONGAPO-BUGALLON RD, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱91.5M | 100% | Medium risk40 | —-0.047 |
| 403 | 25ED0129RETROFITTING/STRENGTHENING OF PULA BRIDGE, PULA, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱43.6M | 96% | Medium risk40 | —-0.032 |
| 404 | 24EH0038RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - LIMON NORTE BR. (B00039TL) ALONG LOOC (COGON TULAY)-ODIONGAN RD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱38.2M | 100% | Medium risk39 | —-0.054 |
| 405 | 25EI0179RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: NAWA BRIDGE, MORENTE, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | Completed | ₱28.8M | 100% | Medium risk39 | —-0.057 |
| 406 | 25EI0178RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES: HAGAN BRIDGE, HAGAN, BONGABONG, ORIENTAL MINDORO | Region IV-B | Southern Mindoro DEO | On-Going | ₱24.1M | 100% | Medium risk39 | —-0.035 |
| 407 | 20A00005RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, IRRIGATION BRIDGE 2 (B04481LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱2.7M | 100% | Medium risk38 | —-0.043 |
| 408 | 23EH0046RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - LUNAS BR. (B00038TL) ALONG LOOC (COGON TULAY) - ODIONGAN RD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱8.3M | 100% | Medium risk38 | —-0.055 |
| 409 | 21EH0015RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MADALAG BR. (B00006TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱7M | 100% | Medium risk38 | —-0.055 |
| 410 | 21A00006RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BOCAL BRIDGE (B00532LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱2.5M | 100% | Medium risk38 | —-0.043 |
| 411 | 20EH0017RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - BARIRI BR. 1 (B00050TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱5.9M | 100% | Medium risk38 | —-0.054 |
| 412 | 20EH0007RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BAÑADERO BR. (B00025TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱4.9M | 100% | Medium risk38 | —-0.054 |
| 413 | 21CJ0031NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS NINOY AQUINO BRIDGE TO ROMULO HIGHWAY, TARLAC | Region III | Tarlac DEO | Completed | ₱15.4M | 100% | Medium risk38 | —-0.065 |
| 414 | 24EH0060RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - BANGON BR. 2 (B00044TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱22.5M | 100% | Medium risk38 | —-0.056 |
| 415 | 21EH0020RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - LIBERTAD BR. (B00012TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱16M | 100% | Medium risk38 | —-0.056 |
| 416 | 22EH0048RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - TAN-AGAN BR. 1 (B00016TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, K0013+693 - K0013+733.20, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱17.6M | 100% | Medium risk38 | —-0.057 |
| 417 | 22EH0062RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - ITURALBA BR (B00020SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD | Region IV-B | Romblon DEO | Completed | ₱9.3M | 100% | Medium risk38 | —-0.054 |
| 418 | 24EH0037RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DAPAWAN BR. (B00054TL) ALONG DAPAWAN-TORREL RD, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱9.8M | 100% | Medium risk38 | —-0.055 |
| 419 | 20EH0057RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - GUINTAC-AN BR. (B00015SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, SIBUYAN ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱6.7M | 100% | Medium risk38 | —-0.053 |
| 420 | 23EH0014RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - TULAY BR. (B00043TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND ROMBLON | Region IV-B | Romblon DEO | Completed | ₱6.9M | 100% | Medium risk38 | —-0.055 |
| 421 | 20A00002RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, ABUT BRIDGE (B00539LZ) ALONG MANILA NORTH ROAD | Region I | Region I | Completed | ₱3.6M | 100% | Medium risk38 | —-0.043 |
| 422 | 22EH0024RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - TORREL BR (B00009TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱6.9M | 100% | Medium risk38 | —-0.055 |
| 423 | 19EH0019RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - LINAWAN BR. (B00022TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, K0021 + 914 - K0021 + 944.50, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱9.1M | 100% | Medium risk38 | —-0.056 |
| 424 | 22CL0008RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BUCAO BR. (B00040LZ) ALONG OLONGAPO-BUGALLON RD, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱87.1M | 100% | Medium risk37 | —-0.051 |
| 425 | 19CL0011RETROFITTING/STRENGTHENING OF BRIDGE, GABOR BR. (B01395LZ) ALONG OLONGAPO-BUGALLON ROAD, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱77.9M | 100% | Medium risk37 | —-0.052 |