Contractor dossier
25 projects on file, including joint ventures this contractor is part of.
Total projects
25
Total budget
₱3.2B
Average progress
82.1%
Completion rate
24.0%
Below 70%
Average risk score
61.6
High risk on average, out of 100
Flagged as unusual
3
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 16 | ₱1.4B | 60.9 | 1 | 91.7% |
| Region IV-B | 8 | ₱1.6B | 63.3 | 2 | 60.5% |
| Region IV-A | 1 | ₱99M | 60.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 16 | ₱1.9B | 59.2 | 0 | 80.6% |
| Flood Control and Drainage | 8 | ₱1.2B | 65.8 | 2 | 82.7% |
| OTHER | 1 | ₱96.5M | 67.3 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OE0078REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 3), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱141.8M | 100% | High risk69 | —-0.075 |
| 25E00166CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 46% | High risk67 | Flagged0.000 |
| 25E00165CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 45% | High risk67 | Flagged0.000 |
| 25E00174BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱236.1M | 71% | High risk67 | —-0.006 |
| 24OE0236REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 1 TO 67, MANILA, METROPOLITAN MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk67 | Flagged0.027 |
| 25OH0004ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 2B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.051 |
| 25OH0002ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 1B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.052 |
| 25OH0001ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 1A, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.052 |
| 25OH0003ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 2A, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.6M | 100% | High risk65 | —-0.051 |
| 23OH0050ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT OF HARBOR VIEW PUMPING STATION, SOUTH DR.ERMITA, MANILA CITY PHASE I | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 25E00277SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, TIGUISAN, STA. 000+000-STA. 000+375, BANSUD, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 19% | High risk63 | —-0.016 |
| 25E00272SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+354.06 (RIGHT SIDE), BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 25% | High risk63 | —-0.017 |
| 24E00031ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+959-K0052+000; K0052+400-K0052+448, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱193M | 85% | High risk63 | —-0.029 |
| 24E00030ASSET PRESERVATIION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+870-K0051+959, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱193M | 93% | High risk63 | —-0.029 |
| 25OG0072PREVENTIVE MAINTENANCE - TERTIARY ROADS: E RODRIGUEZ SR - K0009 + 000 - K0010 + 290, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.4M | 100% | High risk62 | —-0.063 |
| 25OG0087IMPROVEMENT OF ROAD, BARANGAY SAN ROQUE, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 51% | High risk62 | —-0.049 |
| 25OE0073REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 5), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱101.1M | 100% | High risk61 | —-0.082 |
| 25OG0069PREVENTIVE MAINTENANCE - TERTIARY ROADS: KAMIAS RD - K0010 + 469 - K0010 + (-716), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱105.8M | 98% | High risk61 | —-0.060 |
| 25DP0022CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BARANGAY MANAOL TO BARANGAY DITA, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱99M | 100% | High risk60 | —-0.096 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OE0236REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 1 TO 67, MANILA, METROPOLITAN MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk67 | Flagged0.027 |
| 25E00166CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 46% | High risk67 | Flagged0.000 |
| 25E00165CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 45% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OE0078REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 3), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱141.8M | 100% | High risk69 | —-0.075 |
| 2 | 25E00166CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 46% | High risk67 | Flagged0.000 |
| 3 | 25E00165CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 45% | High risk67 | Flagged0.000 |
| 4 | 25E00174BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱236.1M | 71% | High risk67 | —-0.006 |
| 5 | 24OE0236REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 1 TO 67, MANILA, METROPOLITAN MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk67 | Flagged0.027 |
| 6 | 25OH0004ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 2B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.051 |
| 7 | 25OH0002ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 1B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.052 |
| 8 | 25OH0001ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 1A, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk65 | —-0.052 |
| 9 | 25OH0003ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-INSTALLATION OF BOOSTER PUMP AT ESTERO DE TRIPA DE GALLINA, PACKAGE 2A, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.6M | 100% | High risk65 | —-0.051 |
| 10 | 23OH0050ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT OF HARBOR VIEW PUMPING STATION, SOUTH DR.ERMITA, MANILA CITY PHASE I | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 11 | 25E00277SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, TIGUISAN, STA. 000+000-STA. 000+375, BANSUD, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 19% | High risk63 | —-0.016 |
| 12 | 25E00272SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+354.06 (RIGHT SIDE), BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 25% | High risk63 | —-0.017 |
| 13 | 24E00031ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+959-K0052+000; K0052+400-K0052+448, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱193M | 85% | High risk63 | —-0.029 |
| 14 | 24E00030ASSET PRESERVATIION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+870-K0051+959, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱193M | 93% | High risk63 | —-0.029 |
| 15 | 25OG0072PREVENTIVE MAINTENANCE - TERTIARY ROADS: E RODRIGUEZ SR - K0009 + 000 - K0010 + 290, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.4M | 100% | High risk62 | —-0.063 |
| 16 | 25OG0087IMPROVEMENT OF ROAD, BARANGAY SAN ROQUE, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 51% | High risk62 | —-0.049 |
| 17 | 25OE0073REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 5), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱101.1M | 100% | High risk61 | —-0.082 |
| 18 | 25OG0069PREVENTIVE MAINTENANCE - TERTIARY ROADS: KAMIAS RD - K0010 + 469 - K0010 + (-716), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱105.8M | 98% | High risk61 | —-0.060 |
| 19 | 25DP0022CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BARANGAY MANAOL TO BARANGAY DITA, NAGCARLAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱99M | 100% | High risk60 | —-0.096 |
| 20 | 25OH0116IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM WITHIN ZONE 6-7, PASAY CITY | National Capital Region | South Manila DEO | On-Going | ₱66.1M | 31% | Medium risk55 | —-0.044 |
| 21 | 25OG0066PREVENTIVE MAINTENANCE - PRIMARY ROADS: AURORA BLVD - K0013 + 290 - K0011 + 599, K0010 + 213 - K0010 +364, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱75.6M | 92% | Medium risk55 | —-0.062 |
| 22 | 25OG0062PREVENTIVE MAINTENANCE - PRIMARY ROADS: AURORA BLVD - K0010 + (-408) - K0011 + 000, K0012 + 453 - K0013 + 079, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱75.6M | 96% | Medium risk55 | —-0.065 |
| 23 | 25OG0060PREVENTIVE MAINTENANCE - TERTIARY ROADS: GILMORE AVE - K0009 + (-459) - K0009 + 753, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱66.1M | 100% | Medium risk55 | —-0.067 |
| 24 | 23E00134SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONS. OF SLOPE PROTECTION STRUCTURE ALONG PAGASA SABLAYAN TO VICTORIA ROAD, MAYBA SECTION (PHASE 1), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 25 | 25OH0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE /ASPHALT OVERLAY ALONG PRES QUIRINO AVE-K0004+391-KOOO4+926 | National Capital Region | South Manila DEO | On-Going | ₱50M | 100% | Medium risk51 | —-0.070 |