Opening the dossier…
Opening the dossier…
Contractor dossier
74 projects on file, including joint ventures this contractor is part of.
Total projects
74
Total budget
₱851.3M
Average progress
100.0%
Completion rate
100.0%
Average risk score
32.4
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 74 | ₱851.3M | 32.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 43 | ₱186.1M | 29.0 | 0 | 100.0% |
| Roads | 15 | ₱353.7M | 39.2 | 0 | 100.0% |
| Bridges | 6 | ₱96M | 37.4 | 0 | 100.0% |
| Water Provision and Storage | 5 | ₱11.2M | 19.2 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱175.1M | 47.0 | 0 | 100.0% |
| OTHER | 2 | ₱29.2M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22HB0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF BUGSOC BRIDGE AT BUGSOC, | Region VII | Bohol 3rd DEO | Completed | ₱24.5M | 100% | High risk62 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22HB0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF BUGSOC BRIDGE AT BUGSOC, | Region VII | Bohol 3rd DEO | Completed | ₱24.5M | 100% | High risk62 | —-0.030 |
| 2 | 23HB0124CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF SLOPE PROTECTION A | Region VII | Bohol 3rd DEO | Completed | ₱98.8M | 100% | Medium risk57 | —-0.080 |
| 3 | 20HB0053LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES CONSTRUCTION OF BATO MULTI-PURPOSE BUILDING, BRGY. BATO, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk52 | —-0.063 |
| 4 | 23HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF SLOPE PROTECTION ALONG JCT. (TER) DIMIAO-OAC-BILA | Region VII | Bohol 3rd DEO | Completed | ₱78.9M | 100% | Medium risk52 | —-0.085 |
| 5 | 23HB0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF GUINSULARAN RIVER CONTROL LOBOGON, DUERO, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱79M | 100% | Medium risk50 | —-0.070 |
| 6 | 21HB0089OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES - TERTIARY ROADS - TAGB. CITY - CORELLA-SIKATUNA-LOBOC ROAD, K0026+260 - K0026+421.70 | Region VII | Bohol 3rd DEO | Completed | ₱28.8M | 100% | Medium risk46 | —-0.094 |
| 7 | 22HB0152CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ABACHANAN BRIDGE, BRGY. ABACHANAN, SIERRA BULLONES | Region VII | Bohol 3rd DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.053 |
| 8 | 22HB0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ABACHANAN BRIDGE AT ABACHANAN, | Region VII | Bohol 3rd DEO | Completed | ₱34M | 100% | Medium risk46 | —-0.053 |
| 9 | 21HB0087OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES - TERTIARY ROADS - TAGBILARAN CITY - CORELLA-SIKATUNA-LOBOC ROAD, K0025+660 - K0025+724, K0025+790 - K0025 | Region VII | Bohol 3rd DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.095 |
| 10 | 20HB0161LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT WAHIG RIVER, SIERRA BULLONES, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱47M | 100% | Medium risk46 | —-0.075 |
| 11 | 23HB0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF TANGOHAY RIVER CONTROL, SITIO PONOD , SAWANG, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱49.1M | 100% | Medium risk46 | —-0.075 |
| 12 | 21HB0088OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES - TERTIARY ROADS - TAGBILARAN CITY -CORELLA-SIKATUNA-LOBOC RD., K0025+911.10 - K0026+043, K0026+200.30 | Region VII | Bohol 3rd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.095 |
| 13 | 23HB0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PUBLIC MARKET) IN LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.091 |
| 14 | 23HB0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING , BRGY. CALUNASAN SUR, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.094 |
| 15 | 20HB0046RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BAGASIKO I BRIDGE (B00029BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN - JAGNA) KO 156 + 464, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱7.4M | 100% | Medium risk45 | —-0.055 |
| 16 | 21HB0046LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES MULTI-PURPOSE/FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GOTOZON, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.094 |
| 17 | 23HB0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICE - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CANDIJAY MUNICIPAL HIGHSCHOOL), BRGY. POBLACION, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱19.8M | 100% | Medium risk45 | —-0.084 |
| 18 | 21HB0155ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- TERTIARY ROADS- JCT DAT-AN-CARMEN-SIERRA BULLONES-PILAR-ALICIA ROAD- KO | Region VII | Bohol 3rd DEO | Completed | ₱29.2M | 100% | Medium risk44 | —-0.094 |
| 19 | 20HB0073LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES- REPLACEMENT OF BRIDGE (TEMPORARY TO PERMANENT) OF LOMBOG BRIDGE, GUINDULMAN, BOHOL STA. 0 + 067.70 | Region VII | Bohol 3rd DEO | Completed | ₱14.7M | 100% | Medium risk44 | —-0.021 |
| 20 | 22HB0011CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)- POB. ONDOL, TAYTAY, CAMBANCE ROAD LEADING TO CRUZ DAKO, BRGY. POBLACION ONDOL, LOBOC, | Region VII | Bohol 3rd DEO | Completed | ₱7.3M | 100% | Medium risk44 | —-0.095 |
| 21 | 20HB0113LOCAL PROGRAM - LOCAL INFRA PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. GON-OB, LOBOC, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk44 | —-0.094 |
| 22 | 21HB0130ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN - JAGNA) - KO 195+10 | Region VII | Bohol 3rd DEO | Completed | ₱19.1M | 100% | Medium risk44 | —-0.094 |
| 23 | 23HB0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF MALINAO IRRIGATION SYSTEM, MAI | Region VII | Bohol 3rd DEO | Completed | ₱14.7M | 100% | Medium risk44 | —-0.095 |
| 24 | 22HB0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TUBOD MONTE, JAGNA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.093 |
| 25 | 22HB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT)-JCT. (TER) ITUM-DUAY-PAYAO-ESKAYA ROAD | Region VII | Bohol 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.093 |