Contractor dossier
164 projects on file, including joint ventures this contractor is part of.
Total projects
164
Total budget
₱10.7B
Average progress
86.0%
Completion rate
64.0%
Below 70%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
14
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 69 | ₱3.2B | 51.4 | 3 | 87.9% |
| Region IV-A | 28 | ₱2B | 56.4 | 0 | 78.5% |
| Region III | 24 | ₱1.8B | 55.6 | 2 | 93.3% |
| Region IV-B | 12 | ₱1.6B | 55.1 | 4 | 85.6% |
| Region I | 8 | ₱385.3M | 56.4 | 2 | 51.8% |
| Region XI | 8 | ₱387.7M | 49.4 | 0 | 100.0% |
| Negros Island Region | 7 | ₱418.7M | 55.6 | 2 | 93.1% |
| Region X | 3 | ₱213.7M | 50.5 | 0 | 98.4% |
| Region VIII | 2 | ₱384.3M | 68.2 | 0 | 84.2% |
| Region VI | 2 | ₱289.5M | 64.2 | 1 | 74.9% |
| Region II | 1 | ₱34.3M | 44.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 76 | ₱6.3B | 56.9 | 6 | 91.5% |
| Buildings and Facilities | 44 | ₱2.3B | 52.1 | 6 | 74.5% |
| Roads | 36 | ₱1.9B | 49.4 | 0 | 89.2% |
| OTHER | 3 | ₱121M | 59.1 | 1 | 83.6% |
| Bridges | 2 | ₱27.1M | 47.2 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7.4M | 30.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱94.6M | 94.9 | 1 | 15.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 24CL0005CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.1M | 100% | High risk81 | —-0.045 |
| 24CL0063CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24C00470FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0005CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 25DB0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF A MULTI-PURPOSE BUILDING IN BARANGAY BURGOS, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | —-0.008 |
| 23CC0533CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. TELAPAYONG, BALIUAG, BULACAN STA. 001+300 TO STA. 001+500 | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | High risk72 | —-0.007 |
| 24I00045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱191.9M | 84% | High risk69 | —-0.006 |
| 24I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.4M | 85% | High risk68 | —-0.002 |
| 25DD0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 68% | High risk68 | —-0.024 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 24CL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 24CL0069CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 23CC0595CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱47.2M | 0% | Medium risk55 | Flagged0.042 |
| 24OB0500COMPLETION OF 4-STOREY 32-CLASSROOM AT PARANG ELEMENTARY SCHOOL, BARANGAY PARANG, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱147.7M | 0% | High risk64 | Flagged0.039 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24E00155BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROAD/S AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MULTI-PURPOSE BUILDING, BRGY. IV, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱193.6M | 0% | High risk61 | Flagged0.012 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24OE0084CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 598, ZONE 59, STA. MESA, MANILA | National Capital Region | North Manila DEO | On-Going | ₱49.5M | 51% | High risk64 | Flagged0.007 |
| 24E00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF CRUISE PORT AND FACILITIES, PACKAGE H, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.3M | 82% | Medium risk55 | Flagged0.004 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24G00062CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE II, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱154.4M | 50% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 2 | 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 3 | 24CL0005CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.1M | 100% | High risk81 | —-0.045 |
| 4 | 24CL0063CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 5 | 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 6 | 24C00470FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 7 | 24CC0005CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 8 | 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 9 | 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 10 | 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 11 | 25DB0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF A MULTI-PURPOSE BUILDING IN BARANGAY BURGOS, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | —-0.008 |
| 12 | 23CC0533CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. TELAPAYONG, BALIUAG, BULACAN STA. 001+300 TO STA. 001+500 | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | High risk72 | —-0.007 |
| 13 | 24I00045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱191.9M | 84% | High risk69 | —-0.006 |
| 14 | 24I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.4M | 85% | High risk68 | —-0.002 |
| 15 | 25DD0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 68% | High risk68 | —-0.024 |
| 16 | 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 17 | 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 18 | 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 19 | 24CL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 20 | 24CL0069CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 21 | 24GB0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HAMTIC RIVER AT HAMTIC BRIDGE (ABUTMENT B, UPSTREAM), | Region VI | Antique DEO | On-Going | ₱135.1M | 100% | High risk66 | —-0.015 |
| 22 | 24CL0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE IX, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk65 | —-0.038 |
| 23 | 23E00204SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG CAVILLAN RIVER UPSTREAM, BULALACAO, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱202.6M | 100% | High risk65 | —-0.043 |
| 24 | 24D00153DAANG MAHARLIKA (LZ) - K0156 + 911 - K0156 + 932, K0157 + 000 - K0157 + 150, K0158 + -672 - K0158 + -500, K0158 + 1140 - K0159 + 000, K0159 + 940 - K0159 + 1045, K0160 + 000 - K0160 + 150, K0160 + 560 - K0161 + 070, K0161 + 230- K0161 + 255, K0162 + 464 - | Region IV-A | Region IV-A | On-Going | ₱140.4M | 28% | High risk65 | —-0.031 |
| 25 | 25OA0013CONSTRUCTION OF DAMPALIT RIVERWALL (KAYLANAN CREEK) PHASE 11, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 88% | High risk65 | —-0.043 |