Contractor dossier
164 projects on file, including joint ventures this contractor is part of.
Total projects
164
Total budget
₱10.7B
Average progress
86.0%
Completion rate
64.0%
Below 70%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
14
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 69 | ₱3.2B | 51.4 | 3 | 87.9% |
| Region IV-A | 28 | ₱2B | 56.4 | 0 | 78.5% |
| Region III | 24 | ₱1.8B | 55.6 | 2 | 93.3% |
| Region IV-B | 12 | ₱1.6B | 55.1 | 4 | 85.6% |
| Region I | 8 | ₱385.3M | 56.4 | 2 | 51.8% |
| Region XI | 8 | ₱387.7M | 49.4 | 0 | 100.0% |
| Negros Island Region | 7 | ₱418.7M | 55.6 | 2 | 93.1% |
| Region X | 3 | ₱213.7M | 50.5 | 0 | 98.4% |
| Region VIII | 2 | ₱384.3M | 68.2 | 0 | 84.2% |
| Region VI | 2 | ₱289.5M | 64.2 | 1 | 74.9% |
| Region II | 1 | ₱34.3M | 44.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 76 | ₱6.3B | 56.9 | 6 | 91.5% |
| Buildings and Facilities | 44 | ₱2.3B | 52.1 | 6 | 74.5% |
| Roads | 36 | ₱1.9B | 49.4 | 0 | 89.2% |
| OTHER | 3 | ₱121M | 59.1 | 1 | 83.6% |
| Bridges | 2 | ₱27.1M | 47.2 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7.4M | 30.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱94.6M | 94.9 | 1 | 15.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 24CL0005CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.1M | 100% | High risk81 | —-0.045 |
| 24CL0063CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24C00470FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0005CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 25DB0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF A MULTI-PURPOSE BUILDING IN BARANGAY BURGOS, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | —-0.008 |
| 23CC0533CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. TELAPAYONG, BALIUAG, BULACAN STA. 001+300 TO STA. 001+500 | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | High risk72 | —-0.007 |
| 24I00045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱191.9M | 84% | High risk69 | —-0.006 |
| 24I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.4M | 85% | High risk68 | —-0.002 |
| 25DD0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 68% | High risk68 | —-0.024 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 24CL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 24CL0069CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 23CC0595CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱47.2M | 0% | Medium risk55 | Flagged0.042 |
| 24OB0500COMPLETION OF 4-STOREY 32-CLASSROOM AT PARANG ELEMENTARY SCHOOL, BARANGAY PARANG, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱147.7M | 0% | High risk64 | Flagged0.039 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24E00155BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROAD/S AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MULTI-PURPOSE BUILDING, BRGY. IV, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱193.6M | 0% | High risk61 | Flagged0.012 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24OE0084CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 598, ZONE 59, STA. MESA, MANILA | National Capital Region | North Manila DEO | On-Going | ₱49.5M | 51% | High risk64 | Flagged0.007 |
| 24E00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF CRUISE PORT AND FACILITIES, PACKAGE H, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.3M | 82% | Medium risk55 | Flagged0.004 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24G00062CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE II, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱154.4M | 50% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22OB0071BANK IMPROVEMENT ALONG EASTBANK, MANGGAHAN FLOODWAY, (PACKAGE 3), PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱74.5M | 100% | Medium risk53 | —-0.084 |
| 77 | 24OB0175CONSTRUCTION OF SLOPE PROTECTION ALONG PANDAY RIVER, (PHASE 5), PATEROS | National Capital Region | Metro Manila 1st DEO | Completed | ₱70.9M | 100% | Medium risk53 | —-0.086 |
| 78 | 23OC0097CONSTRUCTION OF REVETMENT ALONG FISHERMA'S WHARF (PHASE II), BRGY. LA HUERTA, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.080 |
| 79 | 23OC0082CONSTRUCTION OF BOX CULVERT WITH REVETMENT ALONG COASTAL ROAD (SAN DIONISIO SECTION, PHASE I)PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.086 |
| 80 | 24OH0040OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT.PROGRAM-CONST./MAINT.OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST.OF DRAINAGE SYSTEM ALONG LIBERTAD MAIN (FROM ROXAS BLVD. TO TAFT AVE., PASAY CITY,STA.0+322 TO STA.0+483),PHASE 5 | National Capital Region | South Manila DEO | Completed | ₱89.1M | 100% | Medium risk53 | —-0.080 |
| 81 | 22E00051REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TABLAS CIRCUMFERENTIAL ROAD, KO032+867-KO033+327, ROMBLON | Region IV-B | Region IV-B | Completed | ₱110M | 100% | Medium risk53 | —-0.079 |
| 82 | 24OA0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MUZON AND DAMPALIT RIVER (PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱69.3M | 100% | Medium risk53 | —-0.083 |
| 83 | 23OG0059CONSTRUCTION OF MULTI-PURPOSE BUILDING AT KAMUNING ELEMENTARY SCHOOL, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱39.2M | 100% | Medium risk52 | —-0.099 |
| 84 | 23LE0017CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL), PANGIAN FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱86.8M | 100% | Medium risk51 | —-0.064 |
| 85 | 24A00046CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CABUGAO-NUEVA ERA-DANGLAS, NUEVA ERA SECTION, ILOCOS NORTE | Region I | Region I | On-Going | ₱46.8M | 41% | Medium risk51 | —-0.020 |
| 86 | 24KE0045CONSTRUCTION OF SLOPE PROTECTION ALONG CAMIGUIN CIRCUMFERENTIAL ROAD CATIBAC SECTION, CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.2M | 98% | Medium risk51 | —-0.041 |
| 87 | 24KE0046CONSTRUCTION OF SLOPE PROTECTION ALONG CAMIGUIN CIRCUMFERENTIAL ROAD LAWIGAN, CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.2M | 99% | Medium risk51 | —-0.041 |
| 88 | 24KE0048CONSTRUCTION OF SLOPE PROTECTION ALONG CAMIGUIN CIRCUMFERENTIAL ROAD BENONI SECTION 1 (NEAR BENONI ES), MAHINOG, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱71.2M | 99% | Medium risk50 | —-0.040 |
| 89 | 24DI0023CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN ANTONIO, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱47.8M | 0% | Medium risk50 | —-0.013 |
| 90 | 25DI0032REHABILITATION OF BINAN RIVER CONTROL STRUCTURE (STAGGERED), PHASE 2, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47.8M | 100% | Medium risk50 | —-0.088 |
| 91 | 24DI0012CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY CUYAB, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱47.7M | 88% | Medium risk50 | —-0.037 |
| 92 | 25OG0017REHABILITATION OF SAN JUAN RIVER, PHASE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 18% | Medium risk50 | —-0.032 |
| 93 | 24OF0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TALAYAN CREEK, BARANGAY STO. DOMINGO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱48.5M | 100% | Medium risk49 | —-0.088 |
| 94 | 23OH0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF DRAINAGE WITHIN ZONE 68-89, DISTRICT 5, MANILA | National Capital Region | South Manila DEO | Completed | ₱48.4M | 100% | Medium risk49 | —-0.084 |
| 95 | 24OH0090ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF DRAINAGE SYSTEM, ZONE 60,61 AND 62, BACOOD,STA.MESA, MANILA | National Capital Region | South Manila DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.087 |
| 96 | 23OG0066REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE XXI), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.089 |
| 97 | 21OC0173CONSTRUCTION OF MULTI-PURPOSE BUILDING J. DE LEON ST.,BARANGAY SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱7.7M | 100% | Medium risk49 | —-0.100 |
| 98 | 22OI0111REHABILITATION OF SCHOOL BUILDING AT LP ELEM SCHOOL CENTRAL, BRGY. ELIAS ALDANA, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.101 |
| 99 | 23OI0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PALIWAS CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 100 | 22OH0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES-STRUCTURAL AND RESILIENCE PROGRAM-REHAB. OF SCHOOL BLDG. AT KALAYAAN HIGH SCHOOL, BRGY. 201 ZONE 20 AND ITS VICINITY, PASAY CITY | National Capital Region | South Manila DEO | Completed | ₱9.8M | 100% | Medium risk48 | —-0.103 |