Contractor dossier
164 projects on file, including joint ventures this contractor is part of.
Total projects
164
Total budget
₱10.7B
Average progress
86.0%
Completion rate
64.0%
Below 70%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
14
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 69 | ₱3.2B | 51.4 | 3 | 87.9% |
| Region IV-A | 28 | ₱2B | 56.4 | 0 | 78.5% |
| Region III | 24 | ₱1.8B | 55.6 | 2 | 93.3% |
| Region IV-B | 12 | ₱1.6B | 55.1 | 4 | 85.6% |
| Region I | 8 | ₱385.3M | 56.4 | 2 | 51.8% |
| Region XI | 8 | ₱387.7M | 49.4 | 0 | 100.0% |
| Negros Island Region | 7 | ₱418.7M | 55.6 | 2 | 93.1% |
| Region X | 3 | ₱213.7M | 50.5 | 0 | 98.4% |
| Region VIII | 2 | ₱384.3M | 68.2 | 0 | 84.2% |
| Region VI | 2 | ₱289.5M | 64.2 | 1 | 74.9% |
| Region II | 1 | ₱34.3M | 44.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 76 | ₱6.3B | 56.9 | 6 | 91.5% |
| Buildings and Facilities | 44 | ₱2.3B | 52.1 | 6 | 74.5% |
| Roads | 36 | ₱1.9B | 49.4 | 0 | 89.2% |
| OTHER | 3 | ₱121M | 59.1 | 1 | 83.6% |
| Bridges | 2 | ₱27.1M | 47.2 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7.4M | 30.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱94.6M | 94.9 | 1 | 15.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 24CL0005CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.1M | 100% | High risk81 | —-0.045 |
| 24CL0063CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24C00470FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0005CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 25DB0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF A MULTI-PURPOSE BUILDING IN BARANGAY BURGOS, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | —-0.008 |
| 23CC0533CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. TELAPAYONG, BALIUAG, BULACAN STA. 001+300 TO STA. 001+500 | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | High risk72 | —-0.007 |
| 24I00045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱191.9M | 84% | High risk69 | —-0.006 |
| 24I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.4M | 85% | High risk68 | —-0.002 |
| 25DD0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 68% | High risk68 | —-0.024 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 24CL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 24CL0069CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 23CC0595CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱47.2M | 0% | Medium risk55 | Flagged0.042 |
| 24OB0500COMPLETION OF 4-STOREY 32-CLASSROOM AT PARANG ELEMENTARY SCHOOL, BARANGAY PARANG, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱147.7M | 0% | High risk64 | Flagged0.039 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24E00155BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROAD/S AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MULTI-PURPOSE BUILDING, BRGY. IV, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱193.6M | 0% | High risk61 | Flagged0.012 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24OE0084CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 598, ZONE 59, STA. MESA, MANILA | National Capital Region | North Manila DEO | On-Going | ₱49.5M | 51% | High risk64 | Flagged0.007 |
| 24E00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF CRUISE PORT AND FACILITIES, PACKAGE H, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.3M | 82% | Medium risk55 | Flagged0.004 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24G00062CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE II, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱154.4M | 50% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 23OH0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING BARANGAY 195, ZONE 20 AND ITS VICINITY,PASAY CITY | National Capital Region | South Manila DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.103 |
| 102 | 24HL0026ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF SIATON RIVER CONTROL, | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱48.4M | 100% | Medium risk48 | —-0.066 |
| 103 | 21OG0134CONSTRUCTION / REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY OBRERO, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱16.8M | 100% | Medium risk48 | —-0.099 |
| 104 | 22OC0089CONSTRUCTION OF MULTI-PURPOSE BUILDING AT AREA 5, UPS 5, BARANGAY SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱8.8M | 100% | Medium risk48 | —-0.101 |
| 105 | 24A00253CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF AMBURAYAN RIVER CONTROL, BARANGAY CONSUEGRA TO BARANGAY ALZATE, BANGAR, LA UNION | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk48 | —-0.069 |
| 106 | 22OH0130CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING,MALATE, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.103 |
| 107 | 24A00313CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), POBLACION-PUGUIL-TUBADAY ROAD CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT | Region I | Region I | On-Going | ₱48.2M | 94% | Medium risk48 | —-0.046 |
| 108 | 22OH0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. 649, BASECO, PORT AREA, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.101 |
| 109 | 22OB0355CONSTRUCTION/REHABILITATION OF BARANGAY FORTUNE MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY FORTUNE, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.102 |
| 110 | 22OH0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM/BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BULDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING,BRGY. 649,BASECO, PORT AREA, MANILA | National Capital Region | South Manila DEO | Completed | ₱6.7M | 100% | Medium risk48 | —-0.100 |
| 111 | 22OH0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, ZONE 74, PACO, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.102 |
| 112 | 22OH0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING, BRGY. 898, PUNTA, STA.ANA, MANILA | National Capital Region | South Manila DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.103 |
| 113 | 22DP0030BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROADS - SAMBAT BR. (B03141LZ) ALONG SN PABLO-CALAUAN RD | Region IV-A | Laguna 3rd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.067 |
| 114 | 21OB0230CONSTRUCTION/COMPLETION OF TWO (2) STOREY BUILDING OF QUALITY ASSURANCE OFFICE DPWH-MM1DEO, BRGY. ROSARIO, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱5.7M | 100% | Medium risk47 | —-0.099 |
| 115 | 24OD0175REHABILITATION OF ROAD AND DRAINAGE ALONG BARANGAYS 16, 18, 20 AND 22, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱38.8M | 84% | Medium risk47 | —-0.054 |
| 116 | 24OD0178REHABILITATION OF ROAD AND DRAINAGE ALONG BARANGAYS 23, 25, 25, 26, 27 AND 30, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱38.8M | 81% | Medium risk47 | —-0.054 |
| 117 | 22OH0063BASIC INFRASTRUCTURE PROGRAM (BIP)- MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES-STRUCTURAL AND RESILIENCE PROGRAM-REHAB. OF AURORA QUEZON ELEMENTARY SCHOOL BUILDING/FACILITIES, BRGY. 703, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.103 |
| 118 | 22DP0031BASIC INFRASTRUCTURE PROGRAM - CONSTRUCTION OF BRIDGE IN BARANGAY SAN ANTONIO I, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱12.4M | 100% | Medium risk47 | —-0.067 |
| 119 | 23DH0046REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MAJAYJAY - LUCBAN RD - K00118+870 - K00118+897 | Region IV-A | Laguna 1st DEO | Completed | ₱43.6M | 100% | Medium risk47 | —-0.107 |
| 120 | 25DI0031CONSTRUCTION OF RIVER PROTECTION STRUCTURE, LANDAYAN CREEK NEAR BOUNDARY, SAN PEDRO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱38.7M | 38% | Medium risk47 | —-0.034 |
| 121 | 22LE0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE H-WAY JCT MANA-TICULON-LAGUMIT-LITTLE BAGUIO RD- K1670+013-K1670+160,MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.089 |
| 122 | 21DO0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-SAN MATEO-RODRIGUEZ RD-K0032+100-K0032+150, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.103 |
| 123 | 21LE0042CONSTRUCTION/IMPROVEMENT OF ACCES ROADS LEADING TO PUTING BALAS BEACH RESORT AND KISULAD WHITE SAND BEACHES, BRGY. BASIAWAN, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.090 |
| 124 | 21OH0125CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRUKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS), REHAB. OF MANILA POLICE STATION DISTRICT HEADQUARTERS, ERMITA, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.073 |
| 125 | 25OI0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BULI CREEK, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱42M | 25% | Medium risk46 | —-0.034 |