Contractor dossier
164 projects on file, including joint ventures this contractor is part of.
Total projects
164
Total budget
₱10.7B
Average progress
86.0%
Completion rate
64.0%
Below 70%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
14
8.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 69 | ₱3.2B | 51.4 | 3 | 87.9% |
| Region IV-A | 28 | ₱2B | 56.4 | 0 | 78.5% |
| Region III | 24 | ₱1.8B | 55.6 | 2 | 93.3% |
| Region IV-B | 12 | ₱1.6B | 55.1 | 4 | 85.6% |
| Region I | 8 | ₱385.3M | 56.4 | 2 | 51.8% |
| Region XI | 8 | ₱387.7M | 49.4 | 0 | 100.0% |
| Negros Island Region | 7 | ₱418.7M | 55.6 | 2 | 93.1% |
| Region X | 3 | ₱213.7M | 50.5 | 0 | 98.4% |
| Region VIII | 2 | ₱384.3M | 68.2 | 0 | 84.2% |
| Region VI | 2 | ₱289.5M | 64.2 | 1 | 74.9% |
| Region II | 1 | ₱34.3M | 44.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 76 | ₱6.3B | 56.9 | 6 | 91.5% |
| Buildings and Facilities | 44 | ₱2.3B | 52.1 | 6 | 74.5% |
| Roads | 36 | ₱1.9B | 49.4 | 0 | 89.2% |
| OTHER | 3 | ₱121M | 59.1 | 1 | 83.6% |
| Bridges | 2 | ₱27.1M | 47.2 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7.4M | 30.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱94.6M | 94.9 | 1 | 15.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 24CL0005CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.1M | 100% | High risk81 | —-0.045 |
| 24CL0063CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 1, SAGPAT SECTION, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24C00470FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER (PACKAGE 1),BRGY.UPIG, SAN ILDEFONSOL,BUL | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0005CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BALAGTAS RIVER, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 25DB0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF A MULTI-PURPOSE BUILDING IN BARANGAY BURGOS, TUY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱9.6M | 0% | High risk72 | —-0.008 |
| 23CC0533CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. TELAPAYONG, BALIUAG, BULACAN STA. 001+300 TO STA. 001+500 | Region III | Bulacan 1st DEO | Completed | ₱48.2M | 100% | High risk72 | —-0.007 |
| 24I00045CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱191.9M | 84% | High risk69 | —-0.006 |
| 24I00046CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱192.4M | 85% | High risk68 | —-0.002 |
| 25DD0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 68% | High risk68 | —-0.024 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 24CL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VI, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
| 24CL0069CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAUIS RIVER, PHASE VII, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 100% | High risk66 | —-0.038 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HM0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE II AT LIKI RIVER | Negros Island Region | Siquijor DEO | On-Going | ₱94.6M | 83% | High risk82 | Flagged0.045 |
| 23CC0595CONSTRUCTION OF MULTI-PURPOSE BUILDING TAAL NATUIONAL HIGH SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱47.2M | 0% | Medium risk55 | Flagged0.042 |
| 24OB0500COMPLETION OF 4-STOREY 32-CLASSROOM AT PARANG ELEMENTARY SCHOOL, BARANGAY PARANG, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱147.7M | 0% | High risk64 | Flagged0.039 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 24A00225CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 67% | High risk76 | Flagged0.019 |
| 24E00179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186.2M | 86% | High risk66 | Flagged0.016 |
| 25E00025CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱225.6M | 85% | High risk78 | Flagged0.014 |
| 24HM0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE II AT DATAG RIVER (DOW | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 69% | High risk77 | Flagged0.014 |
| 24E00155BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROAD/S AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MULTI-PURPOSE BUILDING, BRGY. IV, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱193.6M | 0% | High risk61 | Flagged0.012 |
| 24A00383NATIONAL BUILDING PROGRAM, CONSTRUCTION OF COMMISSION ON POPULATION AND DEVELOPMENT (POPCOM) REGION I OFFICE, SAN JUAN, LA UNION | Region I | Region I | On-Going | ₱38.5M | 12% | High risk67 | Flagged0.008 |
| 24OE0084CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 598, ZONE 59, STA. MESA, MANILA | National Capital Region | North Manila DEO | On-Going | ₱49.5M | 51% | High risk64 | Flagged0.007 |
| 24E00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF CRUISE PORT AND FACILITIES, PACKAGE H, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.3M | 82% | Medium risk55 | Flagged0.004 |
| 24CL0026CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE III | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 64% | High risk80 | Flagged0.002 |
| 24G00062CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE II, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱154.4M | 50% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22OB0169REHABILITATION OF ROAD AND DRAINAGE AT BARANGAY SOUTH SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱23.3M | 100% | Medium risk46 | —-0.099 |
| 127 | 21OB0072CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - PPTA RD - K0017 + (-145) - K0017 + 1263, + K0017 + (-437) - K0017 + (-165) | National Capital Region | Metro Manila 1st DEO | Completed | ₱21.7M | 100% | Medium risk46 | —-0.099 |
| 128 | 24A00625CONSTRUCTION OF ACADEMIC BUILDING WITH COMPLETE AMENITIES, PHASE II, TAGUDIN CAMPUS - ILOCOS SUR POLYTECHNIC STATE COLLEGE | Region I | Region I | Completed | ₱19.8M | 100% | Medium risk46 | —-0.041 |
| 129 | 23DO0014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - SN MATEO - RODRIGUEZ RD - K0028+805 - K0029+000 | Region IV-A | Rizal 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.106 |
| 130 | 23OA0008ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - C-3 ROAD - (S02120LZ) - CHAINAGE 20 - CHAINAGE 378 | National Capital Region | Malabon-Navotas DEO | Completed | ₱20.6M | 100% | Medium risk46 | —-0.100 |
| 131 | 22OG0124REHABILITATION OF FLOOD CONTROL STRUCTURE, LAGARIAN CREEK, BRGY. KRISTONG HARI, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.080 |
| 132 | 24OH0020ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF DRAINAGE SYSTEM, LAURA ST., (BEATA ST. TO MENANDRO),PANDACAN, MANILA | National Capital Region | South Manila DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.089 |
| 133 | 24DB0067ORG OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROG-CONST/ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PALICO RIS WATER MGMT FLOOD CONTROL PROJECT OF PALICO RIVER, LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.087 |
| 134 | 23DP0006ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0072 + 000 - K0072 + 478 | Region IV-A | Laguna 3rd DEO | Completed | ₱12.6M | 100% | Medium risk46 | —-0.104 |
| 135 | 23DP0008ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0088 + 500 - K0089 + 000 | Region IV-A | Laguna 3rd DEO | Completed | ₱13.3M | 100% | Medium risk46 | —-0.104 |
| 136 | 22OI0079REHABILITATION OF ROAD AND DRAINAGE SYSTEM AT BRGY. ZAPOTE, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.098 |
| 137 | 24HL0021ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF CANAWAY RIVER CONTROL (DOWNSTREAM B), SIATON, NEGRO | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.067 |
| 138 | 24HL0013ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: REHABILITATION OF RIVER CONTROL ALONG | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.067 |
| 139 | 24HL0017ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF MANTUYOP RIVER CONTROL, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.067 |
| 140 | 24OH0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS-PRES. QUIRINO AVE- K0007 + 811 - K0007 + 936 | National Capital Region | South Manila DEO | Completed | ₱6.2M | 100% | Medium risk46 | —-0.094 |
| 141 | 22OH0144REHABILITATION OF DAMAGED MANHOLE ALONG ROXAS BLVD. SERVICE ROAD FROM BUENDIA AVE. TO P. OCAMPO ST., PASAY CITY AND MANILA CITY | National Capital Region | South Manila DEO | Completed | ₱6.4M | 100% | Medium risk46 | —-0.098 |
| 142 | 22OI0109REHABILITATION OF ROAD, TALON 5, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱6.9M | 100% | Medium risk46 | —-0.097 |
| 143 | 22OB0170REHABILITATION OF ROAD AT BARANGAY CENTRAL SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.099 |
| 144 | 24HL0042ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF RIVER CONTROL ALONG SI | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk45 | —-0.067 |
| 145 | 21LE0007REHABILITATION/RECONSTRUCTION OF ROADS WIITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - ALONG H-WAY JCT. MANA-TICULON-LAGUMIT-LITTLE BAGUIO ROAD, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱25.2M | 100% | Medium risk45 | —-0.099 |
| 146 | 23BH0227OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - JCT. IPIL - QUIRINO BDRY. RD - K0357+830 - K0358+498 | Region II | Isabela 4th DEO | Completed | ₱34.3M | 100% | Medium risk45 | —-0.084 |
| 147 | 23CC0531CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. PIEL BALIUAG, BULACAN STA. 004+451 TO STA. 004+751 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk44 | —-0.026 |
| 148 | 24EB0038CONSTRUCTION OF SALAGAN FLOOD CONTROL STRUCTURE, SO. PROPER SECTION, BARANGAY CASAGUE, SANTA CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.073 |
| 149 | 21LE0177CONCRETING OF BRGY. CADAATAN FMR, BRGY. CADAATAN, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.032 |
| 150 | 21LE0175CONCRETING OF UPPER KINANGAN-UPPER TICATIG-SITIO TABODOKON-MACOL ROAD FMR, BRGY. KINANGAN, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.032 |