Opening the dossier…
Opening the dossier…
Contractor dossier
375 projects on file, including joint ventures this contractor is part of.
Total projects
375
Total budget
₱12.4B
Average progress
98.7%
Completion rate
95.2%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
7
1.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 256 | ₱8.1B | 34.7 | 3 | 99.5% |
| Region I | 80 | ₱2.1B | 44.7 | 2 | 98.5% |
| Region II | 36 | ₱2B | 49.8 | 1 | 95.8% |
| Region XII | 2 | ₱192M | 45.5 | 1 | 59.3% |
| Region VI | 1 | ₱32.4M | 46.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 140 | ₱7.3B | 46.2 | 3 | 98.8% |
| Roads | 117 | ₱2.4B | 30.9 | 0 | 98.9% |
| Buildings and Facilities | 111 | ₱2.3B | 34.5 | 1 | 98.9% |
| OTHER | 4 | ₱201.9M | 64.4 | 1 | 85.5% |
| GAA 2025 SSP | 2 | ₱193M | 95.4 | 2 | 95.6% |
| Bridges | 1 | ₱2.9M | 27.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17CE0157REHABILITATION OF FLOOD CONTROL ALONG BALIWAG RIVER, BRGY. MAPANGPANG, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱81.3M | 100% | High risk72 | —-0.052 |
| 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 17CE0130CONSTRUCTION OF ONE (1) EVACUATION CENTER, BRGY. SAMPALOC, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱34.7M | 100% | High risk70 | —-0.067 |
| 21CF0144CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF ADMINISTRATION BUILDING AT SPECIAL FORCES REGIMENT (AIRBORNE), PHILIPPINE ARMY, F | Region III | Nueva Ecija 2nd DEO | Completed | ₱24.3M | 100% | High risk70 | —-0.071 |
| 21CF0185CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY BAGTING, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.069 |
| 25CK0118REHABILITATION OF ROAD AT BARANGAY SAN ROQUE, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱49M | 100% | High risk70 | —-0.044 |
| 21CF0146CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF 2ND ADA BATTERY BASING FACILITIES, PHILIPPINE ARMY, FORT RAMON MAGSAYSAY, PALAYAN | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.6M | 100% | High risk70 | —-0.072 |
| 21CF0149CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF MOBILE STRUCTURES FOR 2ND 155MM SELF- PROPELLED BATTERY FACILITY, FMNE, NUEVA ECI | Region III | Nueva Ecija 2nd DEO | Completed | ₱11.7M | 100% | High risk70 | —-0.073 |
| 20CF0057REHABILITATION OF PAMPANGA RIVER FLOOD CONTROL, BRGY. TABUATING, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱46.8M | 100% | High risk67 | —-0.062 |
| 16CE0163REPAIR/REHABILITATION OF TALAVERA RIVER, ALIAGA SECTION, SAN EUSTACIO, ALIAGA, NUEVA ECIJA, 1ST LD | Region III | Nueva Ecija 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.062 |
| 17CN0070CONCRETING/IMPROVEMENT OF ROAD, BRGY. TANAWAN, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.039 |
| 17CN0051CONCRETING OF BRGY. UMIRAY ROAD DINGALAN (INFRONT OF UMIRAY NATIONAL HIGH SCHOOL), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.042 |
| 17CN0065CONCRETING OF POBLACION ROAD DINGALAN (MAGSAYSAY ST.), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱5M | 100% | High risk66 | —-0.068 |
| 16CE0225REHABILITATION/IMPROVEMENT OF BALIWAG RIVER CONTROL, MAPANGPANG, STA. 8+193.60-STA. 9+308.70, LUPAO, | Region III | Nueva Ecija 1st DEO | Completed | ₱16.2M | 100% | High risk66 | —-0.063 |
| 20CE0184CONCRETING OF TALUGTUG-UMINGAN ROAD, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱24.7M | 100% | High risk66 | —-0.067 |
| 24CE0360REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY VILLA VINIEGAS, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱95.5M | 100% | High risk65 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 24M00226CONSTRUCTION OF SPECIAL CARE COMPLEX AT DR. JORGE P. ROYECA CITY HOSPITAL (PHASE 1), BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱95.5M | 19% | Medium risk46 | Flagged0.024 |
| 17AI0033CONSTN/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-AGNO RIVER BASIN & ALLIED RIVERS FLOO | Region I | Pangasinan 3rd DEO | Completed | ₱47.6M | 100% | High risk63 | Flagged0.012 |
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17AI0038REPAIR/REHAB OF RIVER BANK RIVER CTRL PROJ, BRGY. AGNO C, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱7.2M | 100% | Medium risk56 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 18CF0100CONCRETE SLOPE PROTECTION PAMPANGA RIVER FLOOD CONTROL, TABUATING, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱28.5M | 100% | Low risk30 | —-0.092 |
| 252 | 18CF0094REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER CONTROL, STA. 36+986.66 - STA. 37+146.66, BRGY. LA FUENTE, STA. ROSA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱18.6M | 100% | Low risk30 | —-0.092 |
| 253 | 18CF0090CONSTRUCTION OF A CONCRETE RIVER WALL ALONG PAMPANGA RIVER, BARANGAY SAN ANTON, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱18.2M | 100% | Low risk30 | —-0.093 |
| 254 | 18CF0062CONSTRUCTION OF SLOPE PROTECTION WITH EARTH DIKE ALONG PAMPANGA RIVER, BRGY. APO ESQUIVEL, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.9M | 100% | Low risk30 | —-0.094 |
| 255 | 19CF0158MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING SAN NICOLAS CENTRAL SCHOOL, GAPAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱21.2M | 100% | Low risk30 | —-0.049 |
| 256 | 17CE0136CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAASIN, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.072 |
| 257 | 20CE0157CONSTRUCTION OF LOCAL ROADS, BARANGAY BAGONG SILANG, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.104 |
| 258 | 19CF0166MODIFIED STANDARD DPWH-DEPED THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING GAPAN SOUTH CENTRAL SCHOOL, GAPAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱28M | 100% | Low risk29 | —-0.046 |
| 259 | 18CF0060CONCRETE SLOPE PROTECTION PEÑARANDA RIVER FLOOD CONTROL, BRGY. SAN ROQUE, SAN LEONARDO NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱27.7M | 100% | Low risk29 | —-0.093 |
| 260 | 18CF0059CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER FLOOD CONTROL, BRGY. LANGLA, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱27.2M | 100% | Low risk29 | —-0.093 |
| 261 | 18CF0061CONTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PAMPANGA RIVER, STA. 33+494.64- STA. 33+749.64 BRGY. SAN ANTON, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱25.8M | 100% | Low risk29 | —-0.093 |
| 262 | 21CN0135CONSTRUCTION/COMPLETION (2STY 6CL), DINGALAN CS, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱15.4M | 100% | Low risk29 | —-0.050 |
| 263 | 19CE0248CONSTRUCTION OF 4STY20CL, TALAVERA CS, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱46.1M | 100% | Low risk29 | —-0.041 |
| 264 | 19CE0247CONSTRUCTION OF 4STY20CL, TALAVERA NATIONAL HIGH SCHOOL, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱42.9M | 100% | Low risk29 | —-0.041 |
| 265 | 18CC0340CONSTRUCTION OF FOUR STOREY SIXTEEN CLASSROOM - BAJET-CASTILLO HIGH SCHOOL PULILAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱36.2M | 100% | Low risk29 | —-0.046 |
| 266 | 18CC0353CONSTRUCTION OF FOUR STOREY TWELVE CLASSROOM - VIRGEN DELAS FLORES HIGH SCHOOL BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱36.8M | 100% | Low risk29 | —-0.046 |
| 267 | 18CF0070CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER FLOOD CONTROL, BRGY. ALUA, SAN ISIDRO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱18.1M | 100% | Low risk29 | —-0.093 |
| 268 | 17CE0149CONSTRUCTION OF MULTI-PURPOSE BUILDING, HABITAT, STO. NIÑO 3RD, SAN JOSE CITY | Region III | Nueva Ecija 1st DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.072 |
| 269 | 19CE0112CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG DIBABUYAN, BRGY. BALOC, STO. DOMINGO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱37.2M | 100% | Low risk29 | —-0.090 |
| 270 | 20CE0007ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, NUEVA ECIJA-PANGASINAN RD. K0150+000 - K0150+300 | Region III | Nueva Ecija 1st DEO | Completed | ₱5.2M | 100% | Low risk29 | —-0.103 |
| 271 | 17CE0142CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALALAY GRANDE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.072 |
| 272 | 18CE0243CONSTRUCTION OF THREE (3) STOREY, SIX (6) WORKSHOP SCHOOL BUILDING MUÑOZ NATIONAL HS, SCIENCE CITY OF MUÑOZ | Region III | Nueva Ecija 1st DEO | Completed | ₱29.9M | 100% | Low risk29 | —-0.044 |
| 273 | 17CE0143CONSTRUCTION OF MULTI-PURPOSE BUILDING, AGUPALO WESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.072 |
| 274 | 20CE0219CONSTRUCTION OF 3STY15CL, CUYAPO CS, CUYAPO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱41M | 100% | Low risk29 | —-0.039 |
| 275 | 17CE0148CONSTRUCTION OF MULTI-PURPOSE BUILDING, STO. NIÑO 2ND, SAN JOSE CITY | Region III | Nueva Ecija 1st DEO | Completed | ₱1.9M | 100% | Low risk29 | —-0.072 |