Contractor dossier
375 projects on file, including joint ventures this contractor is part of.
Total projects
375
Total budget
₱12.4B
Average progress
98.7%
Completion rate
95.2%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
7
1.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 256 | ₱8.1B | 34.7 | 3 | 99.5% |
| Region I | 80 | ₱2.1B | 44.7 | 2 | 98.5% |
| Region II | 36 | ₱2B | 49.8 | 1 | 95.8% |
| Region XII | 2 | ₱192M | 45.5 | 1 | 59.3% |
| Region VI | 1 | ₱32.4M | 46.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 140 | ₱7.3B | 46.2 | 3 | 98.8% |
| Roads | 117 | ₱2.4B | 30.9 | 0 | 98.9% |
| Buildings and Facilities | 111 | ₱2.3B | 34.5 | 1 | 98.9% |
| OTHER | 4 | ₱201.9M | 64.4 | 1 | 85.5% |
| GAA 2025 SSP | 2 | ₱193M | 95.4 | 2 | 95.6% |
| Bridges | 1 | ₱2.9M | 27.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17CE0157REHABILITATION OF FLOOD CONTROL ALONG BALIWAG RIVER, BRGY. MAPANGPANG, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱81.3M | 100% | High risk72 | —-0.052 |
| 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 17CE0130CONSTRUCTION OF ONE (1) EVACUATION CENTER, BRGY. SAMPALOC, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱34.7M | 100% | High risk70 | —-0.067 |
| 21CF0144CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF ADMINISTRATION BUILDING AT SPECIAL FORCES REGIMENT (AIRBORNE), PHILIPPINE ARMY, F | Region III | Nueva Ecija 2nd DEO | Completed | ₱24.3M | 100% | High risk70 | —-0.071 |
| 21CF0185CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY BAGTING, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.069 |
| 25CK0118REHABILITATION OF ROAD AT BARANGAY SAN ROQUE, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱49M | 100% | High risk70 | —-0.044 |
| 21CF0146CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF 2ND ADA BATTERY BASING FACILITIES, PHILIPPINE ARMY, FORT RAMON MAGSAYSAY, PALAYAN | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.6M | 100% | High risk70 | —-0.072 |
| 21CF0149CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF MOBILE STRUCTURES FOR 2ND 155MM SELF- PROPELLED BATTERY FACILITY, FMNE, NUEVA ECI | Region III | Nueva Ecija 2nd DEO | Completed | ₱11.7M | 100% | High risk70 | —-0.073 |
| 20CF0057REHABILITATION OF PAMPANGA RIVER FLOOD CONTROL, BRGY. TABUATING, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱46.8M | 100% | High risk67 | —-0.062 |
| 16CE0163REPAIR/REHABILITATION OF TALAVERA RIVER, ALIAGA SECTION, SAN EUSTACIO, ALIAGA, NUEVA ECIJA, 1ST LD | Region III | Nueva Ecija 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.062 |
| 17CN0070CONCRETING/IMPROVEMENT OF ROAD, BRGY. TANAWAN, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.039 |
| 17CN0051CONCRETING OF BRGY. UMIRAY ROAD DINGALAN (INFRONT OF UMIRAY NATIONAL HIGH SCHOOL), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.042 |
| 17CN0065CONCRETING OF POBLACION ROAD DINGALAN (MAGSAYSAY ST.), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱5M | 100% | High risk66 | —-0.068 |
| 16CE0225REHABILITATION/IMPROVEMENT OF BALIWAG RIVER CONTROL, MAPANGPANG, STA. 8+193.60-STA. 9+308.70, LUPAO, | Region III | Nueva Ecija 1st DEO | Completed | ₱16.2M | 100% | High risk66 | —-0.063 |
| 20CE0184CONCRETING OF TALUGTUG-UMINGAN ROAD, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱24.7M | 100% | High risk66 | —-0.067 |
| 24CE0360REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY VILLA VINIEGAS, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱95.5M | 100% | High risk65 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 24M00226CONSTRUCTION OF SPECIAL CARE COMPLEX AT DR. JORGE P. ROYECA CITY HOSPITAL (PHASE 1), BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱95.5M | 19% | Medium risk46 | Flagged0.024 |
| 17AI0033CONSTN/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-AGNO RIVER BASIN & ALLIED RIVERS FLOO | Region I | Pangasinan 3rd DEO | Completed | ₱47.6M | 100% | High risk63 | Flagged0.012 |
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17AI0038REPAIR/REHAB OF RIVER BANK RIVER CTRL PROJ, BRGY. AGNO C, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱7.2M | 100% | Medium risk56 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24AI0036CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY SAN JOSE, URDANETA CITY, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.069 |
| 102 | 22AH0062CONSTRUCTION OF ROAD, BRGY. EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.085 |
| 103 | 24AI0171CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA AND ALLIED RIVER IN BARANGAY GONZALES - STA. MARIA, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱29.6M | 100% | Medium risk48 | —-0.074 |
| 104 | 20CE0218CONSTRUCTION OF 2STY6CL, DOROTEO R. JOSE ELEMENTARY SCHOOL, CUYAPO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.022 |
| 105 | 20AI0093CONSTRUCTION OF ROAD (NEW ROAD LEADING TO ECONOMIC ZONE) BRGY. LINMANSANGAN, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱46.6M | 100% | Medium risk47 | —-0.085 |
| 106 | 18AI0135CONSTN/EXTENSION OF BANK PROTECTION, BRGY. PATAQUID, STA. MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.076 |
| 107 | 20AI0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BINALONAN, PANGASINAN (PACKAGE 2) | Region I | Pangasinan 3rd DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.072 |
| 108 | 21AI0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING RIVER, BRGY. STA. MARIA, BINALONAN, PANGASINAN (PACKAGE 5) | Region I | Pangasinan 3rd DEO | Completed | ₱38.4M | 100% | Medium risk47 | —-0.073 |
| 109 | 19AI0242CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGASIT RIVER, BRGY. CASANICOLASAN, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.075 |
| 110 | 18AI0145CONSTN OF BANK PROTECTION ALONG AGNO RIVER CTRL PROJECT, BRGY. CAUPLASAN, STA. MARIA, PANG. | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.075 |
| 111 | 20AI0053REPAIR/REHABILITATION OF ANDULAN RIVER FLOOD CONTROL, BRGY. ZONE 4, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.069 |
| 112 | 23BJ0025ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (TERTIARY ROAD) JCT. NATL ROAD-BITNONG-BELANCE-NUEVA VIZCAYA ROAD (K0262+653-K0262+732) DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱49.6M | 100% | Medium risk47 | —-0.081 |
| 113 | 20CE0216CONSTRUCTION OF 2STY4CL, CABARUAN ES, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.025 |
| 114 | 18AI0158CONSTN/EXTENSION OF BANK PROTECTION ALONG AGNO RIVER CTRL PROJ, BRGY. TUMANA WEST-CARMENT EAST, ROSA | Region I | Pangasinan 3rd DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.075 |
| 115 | 18AI0147CONSTN/EXTENSION OF BANK PROTECTION ALONG AGNO RIVER CTRL PROJ, BRGY. SAMON, STA. MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.076 |
| 116 | 23BJ0023ASSET PRESERVATION PROGRAM-REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (TERTIARY ROAD) JCT. NATL ROAD-BITNONG-BELANCE-NUEVA VIZCAYA BDRY ROAD (K0262+379-K0262+455), DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.081 |
| 117 | 20AI0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TOTONOGUEN RIVER, BRGY. ZONE 1, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.076 |
| 118 | 22BJ0016ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS- DAANG MAHARLIKA (LZ)- K0225+459-K0228+000 ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.082 |
| 119 | 19AI0339CONSTRUCTION OF TWO (2) STOREY SCHOOL BUILDING, PUELAY ELEMENTARY SCHOOL, VILLASIS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱23M | 100% | Medium risk47 | —-0.041 |
| 120 | 21BJ0023CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, CALITLITAN SECTION, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱47M | 100% | Medium risk47 | —-0.068 |
| 121 | 20AI0143CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, BINALONAN ASINGAN-STA. MARIA ROAD, KO 190+011 - KO 190+420 | Region I | Pangasinan 3rd DEO | Completed | ₱38.1M | 100% | Medium risk47 | —-0.086 |
| 122 | 22AI0042ROAD WIDENING-SECONDARY ROADS ALONG CARMEN JCT.- MANAT ROAD, K0172+620 - K0173+573 | Region I | Pangasinan 3rd DEO | Completed | ₱32.4M | 100% | Medium risk47 | —-0.090 |
| 123 | 18AI0357CONSTRUCTION OF TWO STOREY EIGHT CLASSROOM SCHOOL BUILDING, PUELAY, VILLASIS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱21.9M | 100% | Medium risk47 | —-0.041 |
| 124 | 23BJ0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURES COMON SECTION, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱48.2M | 100% | Medium risk46 | —-0.069 |
| 125 | 20AI0179CONSTRUCTION OF TWO (2) UNITS TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING ERNESTING GONZALES ELEMENTARY SCHOOL AT STO. TOMAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱26.8M | 100% | Medium risk46 | —-0.040 |