Opening the dossier…
Opening the dossier…
Contractor dossier
375 projects on file, including joint ventures this contractor is part of.
Total projects
375
Total budget
₱12.4B
Average progress
98.7%
Completion rate
95.2%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
7
1.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 256 | ₱8.1B | 34.7 | 3 | 99.5% |
| Region I | 80 | ₱2.1B | 44.7 | 2 | 98.5% |
| Region II | 36 | ₱2B | 49.8 | 1 | 95.8% |
| Region XII | 2 | ₱192M | 45.5 | 1 | 59.3% |
| Region VI | 1 | ₱32.4M | 46.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 140 | ₱7.3B | 46.2 | 3 | 98.8% |
| Roads | 117 | ₱2.4B | 30.9 | 0 | 98.9% |
| Buildings and Facilities | 111 | ₱2.3B | 34.5 | 1 | 98.9% |
| OTHER | 4 | ₱201.9M | 64.4 | 1 | 85.5% |
| GAA 2025 SSP | 2 | ₱193M | 95.4 | 2 | 95.6% |
| Bridges | 1 | ₱2.9M | 27.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17CE0157REHABILITATION OF FLOOD CONTROL ALONG BALIWAG RIVER, BRGY. MAPANGPANG, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱81.3M | 100% | High risk72 | —-0.052 |
| 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 17CE0130CONSTRUCTION OF ONE (1) EVACUATION CENTER, BRGY. SAMPALOC, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱34.7M | 100% | High risk70 | —-0.067 |
| 21CF0144CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF ADMINISTRATION BUILDING AT SPECIAL FORCES REGIMENT (AIRBORNE), PHILIPPINE ARMY, F | Region III | Nueva Ecija 2nd DEO | Completed | ₱24.3M | 100% | High risk70 | —-0.071 |
| 21CF0185CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY BAGTING, GABALDON, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱4.9M | 100% | High risk70 | —-0.069 |
| 25CK0118REHABILITATION OF ROAD AT BARANGAY SAN ROQUE, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱49M | 100% | High risk70 | —-0.044 |
| 21CF0146CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF 2ND ADA BATTERY BASING FACILITIES, PHILIPPINE ARMY, FORT RAMON MAGSAYSAY, PALAYAN | Region III | Nueva Ecija 2nd DEO | Completed | ₱17.6M | 100% | High risk70 | —-0.072 |
| 21CF0149CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONSTRUCTION OF MOBILE STRUCTURES FOR 2ND 155MM SELF- PROPELLED BATTERY FACILITY, FMNE, NUEVA ECI | Region III | Nueva Ecija 2nd DEO | Completed | ₱11.7M | 100% | High risk70 | —-0.073 |
| 20CF0057REHABILITATION OF PAMPANGA RIVER FLOOD CONTROL, BRGY. TABUATING, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱46.8M | 100% | High risk67 | —-0.062 |
| 16CE0163REPAIR/REHABILITATION OF TALAVERA RIVER, ALIAGA SECTION, SAN EUSTACIO, ALIAGA, NUEVA ECIJA, 1ST LD | Region III | Nueva Ecija 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.062 |
| 17CN0070CONCRETING/IMPROVEMENT OF ROAD, BRGY. TANAWAN, DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.039 |
| 17CN0051CONCRETING OF BRGY. UMIRAY ROAD DINGALAN (INFRONT OF UMIRAY NATIONAL HIGH SCHOOL), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱9.9M | 100% | High risk66 | —-0.042 |
| 17CN0065CONCRETING OF POBLACION ROAD DINGALAN (MAGSAYSAY ST.), DINGALAN, AURORA | Region III | Aurora DEO | Completed | ₱5M | 100% | High risk66 | —-0.068 |
| 16CE0225REHABILITATION/IMPROVEMENT OF BALIWAG RIVER CONTROL, MAPANGPANG, STA. 8+193.60-STA. 9+308.70, LUPAO, | Region III | Nueva Ecija 1st DEO | Completed | ₱16.2M | 100% | High risk66 | —-0.063 |
| 20CE0184CONCRETING OF TALUGTUG-UMINGAN ROAD, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱24.7M | 100% | High risk66 | —-0.067 |
| 24CE0360REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY VILLA VINIEGAS, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱95.5M | 100% | High risk65 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 24M00226CONSTRUCTION OF SPECIAL CARE COMPLEX AT DR. JORGE P. ROYECA CITY HOSPITAL (PHASE 1), BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱95.5M | 19% | Medium risk46 | Flagged0.024 |
| 17AI0033CONSTN/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-AGNO RIVER BASIN & ALLIED RIVERS FLOO | Region I | Pangasinan 3rd DEO | Completed | ₱47.6M | 100% | High risk63 | Flagged0.012 |
| 25CE0194CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY GABALDON, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 95% | High risk95 | Flagged0.006 |
| 25CE0193CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILOG BALIWAG RIVER, BARANGAY CATALANACAN, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱96.5M | 96% | High risk95 | Flagged0.005 |
| 25BJ0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BAGUMBAYAN FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BARANGAY BAGUMBAYAN, | Region II | Nueva Vizcaya 2nd DEO | On-Going | ₱102.1M | 50% | High risk78 | Flagged0.005 |
| 17AI0038REPAIR/REHAB OF RIVER BANK RIVER CTRL PROJ, BRGY. AGNO C, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱7.2M | 100% | Medium risk56 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 20AI0146CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MANILA NORTH ROAD KO 208+450 - KO 209+250 | Region I | Pangasinan 3rd DEO | Completed | ₱23.3M | 100% | Medium risk44 | —-0.089 |
| 152 | 23BJ0010ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS, DAANG MAHARLIKA (LZ)-K0216+845-K0219+000 STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱43.5M | 100% | Medium risk43 | —-0.080 |
| 153 | 23BJ0012ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS, DAANG MAHARLIKA (LZ)-K0220+000-K0220+503 STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱44.3M | 100% | Medium risk43 | —-0.080 |
| 154 | 24BJ0065REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (TERTIARY ROAD) PAPAYA-MALABING-WANGAL-BINUGAWAN-TADJI-RUNRUNO RD. K0310+191-K0311+077 KASIBU, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱21.7M | 100% | Medium risk43 | —-0.086 |
| 155 | 17CE0178CONSTRUCTION OF 4 - CLASSROOMS WORKSHOP BUILDING PANTABANGAN NATIONAL HIGH SCHOOL, PANTABANGAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱16.9M | 100% | Medium risk43 | —-0.023 |
| 156 | 18CE0074ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0159+630.00 - K0159+740.00, K0160+099.00 - K0160+302.50, K0161+087.40 - K0161+149.00, K0161+ | Region III | Nueva Ecija 1st DEO | Completed | ₱91.6M | 100% | Medium risk43 | —-0.089 |
| 157 | 20BJ0018ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED OF PAVED ROADS-TERTIARY ROADS- NUEVA VIZCAYA PANGASINAN ROAD K0216+(-564)-K0216+ (-225) STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱8.7M | 100% | Medium risk43 | —-0.083 |
| 158 | 20AI0092CONCRETING OF ROADS, ZONE 6, CALEPAAN, ASINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.091 |
| 159 | 21BJ0031CONCRETING OF ROAD, BARANGAY LUBLUB, ALFONSO CASTAÑEDA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.084 |
| 160 | 22CE0043CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BRGY. CAINGIN TABING ILOG, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.076 |
| 161 | 18CE0135NETWORK DEVELOPMENT- ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0129+378.65 - K0129+419.50, K0129+738.50 - K0130+000.00, K0131+926.00 - K0132+467.70, K0132+914.00 - K0133+000.00, K0134+169.00 - K0134+180.00, K0143+584.00 - K0145+790.00 | Region III | Nueva Ecija 1st DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.090 |
| 162 | 20BJ0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM-ACCESS ROAD LEADING TO GALINTUJA FALLS AND CANILI LAKE ALFONSO CASTAÑEDA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱9.8M | 100% | Medium risk42 | —-0.087 |
| 163 | 21BJ0004CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION -ACCESS ROAD LEADING TO GALINTUJA FALLS AND CANILI LAKE ALFONSO CASTAÑEDA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱9.4M | 100% | Medium risk42 | —-0.087 |
| 164 | 22CE0042CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BRGY. SAN CARLOS, ALIAGA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.078 |
| 165 | 17CE0179CONSTRUCTION OF 2 - CLASSROOMS WORKSHOP BUILDING PANTABANGAN NATIONAL HIGH SCHOOL, PANTABANGAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9M | 100% | Medium risk42 | —-0.025 |
| 166 | 19AI0405CONCRETING OF BRGY. SAN ISIDRO FMR, BRGY. SAN ISIDRO, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.036 |
| 167 | 24CC0217CONSTRUCTION OF MULTI-PURPOSE BUILDING, TANAWAN ELEMENTARY SCHOOL, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱54.4M | 100% | Medium risk41 | —-0.099 |
| 168 | 21CE0128CONSTRUCTION OF MULTI-PURPOSE BUILDING, NUEVA ECIJA FRUITS AND VEGETABLES SEED CENTER, BANTUG, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱62.4M | 100% | Medium risk40 | —-0.093 |
| 169 | 19AI0382CONCRETING OF BRGY. SAN AGUSTIN-BRGY. SALVACION FMR, BRGY. SAN AGUSTIN AND BRGY. SALVACION, STO. TOMAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk40 | —-0.037 |
| 170 | 19AI0383CONCRETING OF BRGY. POBLACION EAST - BRGY. SAN AGUSTIN FMR, BRGY. POBLACION EAST AND BRGY. SAN AGUSTIN, STO. TOMAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk40 | —-0.037 |
| 171 | 22CE0154CONSTRUCTION OF MULTI-PURPOSE FACILITY (GOVERNMENT CENTER AND SOCIAL-CIVIC-EVACUATION CENTER), BRGY. STO. ROSARIO, ALIAGA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱57.6M | 100% | Medium risk39 | —-0.096 |
| 172 | 17AI0447CONSTN OF FOUR STRY EIGHT CL SB (2 SCIENCE LAB, 2 COMP LAB (W/ MICROPILE)) AT BOBONAN NHS, POZORRUBI | Region I | Pangasinan 3rd DEO | Completed | ₱21.4M | 100% | Medium risk39 | —-0.014 |
| 173 | 17AI0352CONSTN OF FOUR STRY SIXTEEN CL SB (3 REGULAR WORKSHOP, 2 SCIENCE LAB & 2 COMP LAB & 2 CL) LA PAZ NHS | Region I | Pangasinan 3rd DEO | Completed | ₱39.4M | 100% | Medium risk39 | —-0.012 |
| 174 | 17AI0435CONSTN OF FOUR STRY EIGHT CL SB (2 SCIENCE LAB & 2 COMP LAB) AT EUGENIO P. PEREZ NHS, POZORRUBIO, PA | Region I | Pangasinan 3rd DEO | Completed | ₱18.3M | 100% | Medium risk39 | —-0.017 |
| 175 | 17AI0449CONSTN OF FOUR STRY EIGHT CL SB (2 SCIENCE LAB, 2 ICT) AT PALGUYOD NHS, POZORRUBIO, PANG. | Region I | Pangasinan 3rd DEO | Completed | ₱18.3M | 100% | Medium risk39 | —-0.017 |