Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4.6B
Average progress
96.3%
Completion rate
82.6%
Average risk score
36.6
Medium risk on average, out of 100
Flagged as unusual
11
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 98 | ₱4.2B | 35.9 | 11 | 95.7% |
| Region IX | 12 | ₱95.7M | 40.2 | 0 | 100.0% |
| Region XI | 3 | ₱222.9M | 42.9 | 0 | 100.0% |
| Region VI | 1 | ₱22.3M | 44.9 | 0 | 100.0% |
| Region XIII | 1 | ₱30.1M | 43.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 42 | ₱2.4B | 34.5 | 0 | 99.4% |
| Bridges | 37 | ₱521.1M | 28.5 | 1 | 97.4% |
| Buildings and Facilities | 12 | ₱119.6M | 17.8 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱631.5M | 33.0 | 0 | 100.0% |
| OTHER | 7 | ₱556.5M | 76.1 | 4 | 86.5% |
| GAA 2025 SSP | 5 | ₱43.3M | 89.7 | 4 | 69.3% |
| GAA 2025 OO-1 | 2 | ₱280.8M | 94.5 | 2 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 25MG0087CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BANGA NATIONAL HIGH SCHOOL, BARANGAY BENITEZ, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.019 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 22M00095CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE F, STA 53+100-STA 53+959, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱75.3M | 100% | High risk76 | —-0.025 |
| 17LD0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), DIGOS DIV. RD A. K1562+860 TO K1564+100 B. K1566+000 TO K1566+210, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱48.9M | 100% | High risk75 | —-0.026 |
| 24M00116CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MARBEL-MAKAR RD -K1686+095 - K1686+312, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱8.3M | 97% | High risk75 | —-0.001 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 23MB0073WIDENING OF PERMANENT BRIDGES-BAWING BR. (B01027MN) ALONG MAKAR-KIAMBA RD. | Region XII | South Cotabato 1st DEO | On-Going | ₱32.1M | 3% | Low risk29 | Flagged0.022 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 2 | 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 3 | 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 4 | 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 5 | 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 6 | 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 7 | 25MG0087CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BANGA NATIONAL HIGH SCHOOL, BARANGAY BENITEZ, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.019 |
| 8 | 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 9 | 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 10 | 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 11 | 22M00095CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE F, STA 53+100-STA 53+959, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱75.3M | 100% | High risk76 | —-0.025 |
| 12 | 17LD0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), DIGOS DIV. RD A. K1562+860 TO K1564+100 B. K1566+000 TO K1566+210, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱48.9M | 100% | High risk75 | —-0.026 |
| 13 | 24M00116CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MARBEL-MAKAR RD -K1686+095 - K1686+312, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱8.3M | 97% | High risk75 | —-0.001 |
| 14 | 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
| 15 | 18JD0048RETROFFITING/STRENGTHENING OF PERMANENT BRIDGES POLANCO BRIDGE(BO0418MN) ALONG DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱41.9M | 100% | Medium risk54 | —-0.056 |
| 16 | 23M00139CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION) PACKAGE H, STA.54+770.000 - STA.57+340.000,TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱144.7M | 100% | Medium risk53 | —-0.028 |
| 17 | 23M00055CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BANGA-TUPI-MALUNGON ROAD ( TUPI- MALUNGON SECTION) PACKAGE J, STA. 43+100 STA. 43+129.57, STA. 46+720 STA. 46+762.45, STA. 48+180 STA. 48+360, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱144.7M | 100% | Medium risk52 | —-0.065 |
| 18 | 17JB0080RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-TAMILOCAN BR. (BO1194MN) ALONG DIPOLOG-OROQUIETA ROAD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱8.8M | 100% | Medium risk52 | —-0.033 |
| 19 | 18JD0056REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE TUTUA BRIDGE (BO0587MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD,ZN | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱4.9M | 100% | Medium risk52 | —-0.056 |
| 20 | 23M00140CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION) PACKAGE I, STA.57+340.000 - STA.61+100.000,TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱133.2M | 100% | Medium risk52 | —-0.030 |
| 21 | 17JB0079REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-TALINGA BR. (B00458MN) ALONG DIPOLOG-SINDANGAN-LILOY ROAD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱5.1M | 100% | Medium risk52 | —-0.034 |
| 22 | 19M00023CONSTRUCTION OF REVETMENT CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. 0+000 TO STA. 0+960, ALONG MAKAR RIVER, BRGY. FATIMA, GENERAL SANTOS | Region XII | Region XII | Completed | ₱121.6M | 100% | Medium risk50 | —-0.052 |
| 23 | 18JC0025REHABILITATION/ MAJOR REPAIR OF KIPIT BR. 2 (B01183MN) ALONG LILOY-SIOCON RD, LABASON, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱9.7M | 100% | Medium risk50 | —-0.057 |
| 24 | 18JC0024REHABILITATION/ MAJOR REPAIR OF KIPIT BR. 1 (B01182MN) ALONG LILOY-SIOCON RD, LABASON, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.055 |
| 25 | 17L00035WIDENING (2 INTO 4 LANES) OF DVO.COT. RD (JCT. DIGOS-COTABATO SECT.) INCL. RROW (BRGY.SINAWILAN-BRGY | Region XI | Region XI | Completed | ₱171.3M | 100% | Medium risk50 | —-0.028 |