Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4.6B
Average progress
96.3%
Completion rate
82.6%
Average risk score
36.6
Medium risk on average, out of 100
Flagged as unusual
11
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 98 | ₱4.2B | 35.9 | 11 | 95.7% |
| Region IX | 12 | ₱95.7M | 40.2 | 0 | 100.0% |
| Region XI | 3 | ₱222.9M | 42.9 | 0 | 100.0% |
| Region VI | 1 | ₱22.3M | 44.9 | 0 | 100.0% |
| Region XIII | 1 | ₱30.1M | 43.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 42 | ₱2.4B | 34.5 | 0 | 99.4% |
| Bridges | 37 | ₱521.1M | 28.5 | 1 | 97.4% |
| Buildings and Facilities | 12 | ₱119.6M | 17.8 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱631.5M | 33.0 | 0 | 100.0% |
| OTHER | 7 | ₱556.5M | 76.1 | 4 | 86.5% |
| GAA 2025 SSP | 5 | ₱43.3M | 89.7 | 4 | 69.3% |
| GAA 2025 OO-1 | 2 | ₱280.8M | 94.5 | 2 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 25MG0087CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BANGA NATIONAL HIGH SCHOOL, BARANGAY BENITEZ, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.019 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 22M00095CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE F, STA 53+100-STA 53+959, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱75.3M | 100% | High risk76 | —-0.025 |
| 17LD0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), DIGOS DIV. RD A. K1562+860 TO K1564+100 B. K1566+000 TO K1566+210, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱48.9M | 100% | High risk75 | —-0.026 |
| 24M00116CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MARBEL-MAKAR RD -K1686+095 - K1686+312, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱8.3M | 97% | High risk75 | —-0.001 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 23MB0073WIDENING OF PERMANENT BRIDGES-BAWING BR. (B01027MN) ALONG MAKAR-KIAMBA RD. | Region XII | South Cotabato 1st DEO | On-Going | ₱32.1M | 3% | Low risk29 | Flagged0.022 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24M00134CONSTRUCTION OF ROAD, STA. 0+000 - STA. 0+390, PUROK PAG-ASA, BARANGAY LINAN, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱6.9M | 100% | Low risk26 | —-0.083 |
| 77 | 21MB0057CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO MT. MATUTUM JUMP-OFF POINT, BRGY. KABLON-SITIO GLANDANG, TUPI POBLACION, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱24.5M | 100% | Low risk26 | —-0.087 |
| 78 | 18JC0027REHABILITATION/ MAJOR REPAIR OF LUX BR. 2 (B01185MN) ALONG LILOY-SIOCON RD, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2.3M | 100% | Low risk25 | —-0.052 |
| 79 | 18JC0026REHABILITATION/ MAJOR REPAIR OF LUX BR. 1 (B01184MN) ALONG LILOY-SIOCON RD, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱2.4M | 100% | Low risk25 | —-0.052 |
| 80 | 20MB0020CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG TINAGACAN - BUAYAN RIVER, BRGY. TINAGACAN, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱39.1M | 100% | Low risk25 | —-0.070 |
| 81 | 19MB0021CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARBEL-MAKAR ROAD (PAGALUNGAN SECTION), (APOPONG - SILWAY - SINAWAL RIVER BASIN), STA. 0+000 TO STA. 0+233, PAGALUNGAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱24.5M | 100% | Low risk24 | —-0.071 |
| 82 | 20ME0049WIDENING OF KANANTONG BRIDGE (B01071MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD; KIAMBA, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱45.1M | 100% | Low risk24 | —-0.046 |
| 83 | 22ME0117REPLACEMENT OF ALABEL BRIDGE (B01539MN) ALONG DEMOLOK-LITTLE BAGUIO-ALABEL ROAD, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱19.6M | 100% | Low risk24 | —-0.052 |
| 84 | 23M00067CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD (BANGA-TUPI SECTION), PACKAGE B, STA 19+493 - STA.19+538, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱44.4M | 100% | Low risk24 | —-0.052 |
| 85 | 19ME0003RETROFITTING/STRENGTHENING OF BALITON BRIDGE (B01056MN) ALONG SARANGANI-DAVAO DEL SUR COASTAL ROAD; GLAN, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱5.9M | 100% | Low risk24 | —-0.050 |
| 86 | 19MB0017WIDENING OF BRIDGE, SOUTH TUPI BR. (B01032MN) ALONG MARBEL-MAKAR RD | Region XII | South Cotabato 1st DEO | Completed | ₱19.6M | 100% | Low risk24 | —-0.058 |
| 87 | 19ME0002RETROFITTING/STRENGTHENING OF BAGONG TAAS BRIDGE (B01009MN) ALONG SARANGANI-DAVAO DEL SUR COASTAL ROAD; GLAN, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱13.2M | 100% | Low risk24 | —-0.051 |
| 88 | 20ME0117REHABILITATION/MAJOR REPAIR OF TAMBILIL BRIDGE (B01075MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD; KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9.3M | 100% | Low risk24 | —-0.055 |
| 89 | 18ME0006RETROFITTING/STRENGTHENING OF AQUINO BRIDGE (B01053MN) ALONG SDSCR, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱5.1M | 100% | Low risk23 | —-0.050 |
| 90 | 20ME0053WIDENING OF PANANAG BRIDGE (B01066MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD; MAASIM, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱25.7M | 100% | Low risk23 | —-0.049 |
| 91 | 23M00068CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD (BANGA-TUPI SECTION), PACKAGE C, STA. 16+348 - STA. 16+363, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱15M | 100% | Low risk23 | —-0.058 |
| 92 | 19ME0001RETROFITTING/STRENGTHENING OF BADTASAN BRIDGE (B01078MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD; KIAMBA, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱7.8M | 100% | Low risk23 | —-0.052 |
| 93 | 22ME0029RETROFITTING/STRENGTHENING OF LUMATIL BRIDGE (B01064MN) ALONG SSKCR, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9.5M | 100% | Low risk23 | —-0.051 |
| 94 | 22ME0030RETROFITTING/STRENGTHENING OF BRIDGE-SAMBANG BR. (B01063MN) ALONG SSKCR, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱7.6M | 100% | Low risk23 | —-0.050 |
| 95 | 18ME0003RETROFITTING/STRENGTHENING OF TALOK BRIDGE(B01068MN) ALONG SSKCR, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9.5M | 100% | Low risk23 | —-0.054 |
| 96 | 20ME0008RETROFITTING/ STRENGTHENING OF BRIDGE-LAGUNDI BRIDGE II (B01074MN) ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD; KIAMBA, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱7.4M | 100% | Low risk23 | —-0.054 |
| 97 | 24MB0086CONCRETING OF BRGY. KABLON FMR, BRGY. KABLON, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱14.9M | 100% | Low risk22 | —-0.033 |
| 98 | 24MB0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (TUPI MALLENGKE), TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk20 | —-0.083 |
| 99 | 23MB0163CONCRETING OF SITIO KITUBO TO SITIO LAMLATANG FMR (WITH DRAINAGE AND FLOOD CONTROL), BRGY. MIASONG, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱11.8M | 100% | Low risk20 | —-0.029 |
| 100 | 24M00136CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), EMILIANO P. BAQUIAL NATIONAL HIGH SCHOOL, BARANGAY CROSSING RUBBER, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱4.8M | 100% | Low risk20 | —-0.085 |