Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱149.1M
Average progress
55.1%
Completion rate
50.0%
Below 70%
Average risk score
62.0
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 4 | ₱149.1M | 62.0 | 0 | 55.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 2 | ₱19.5M | 69.2 | 0 | 50.0% |
| Flood Control and Drainage | 2 | ₱129.6M | 54.7 | 0 | 60.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0138BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ERODED RIVER BANK BARANGAY STA. MARIA, MINALIN, PAMPANGA (STA. 0+ 000 - STA. 0 + 445) | Region III | Pampanga 1st DEO | On-Going | ₱56.3M | 21% | High risk74 | —-0.006 |
| 24CC0414REHABILITATION OF ROAD INCLUDING BOX CULVERT, PUROK 1 AND 3, BARANGAY MALAMIG, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.9M | 100% | High risk69 | —-0.069 |
| 25CC0185CONSTRUCTION OF DRAINAGE SYSTEM, EMEL, BARANGAY SUBIC, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱9.6M | 0% | High risk69 | —-0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CG0138BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ERODED RIVER BANK BARANGAY STA. MARIA, MINALIN, PAMPANGA (STA. 0+ 000 - STA. 0 + 445) | Region III | Pampanga 1st DEO | On-Going | ₱56.3M | 21% | High risk74 | —-0.006 |
| 2 | 24CC0414REHABILITATION OF ROAD INCLUDING BOX CULVERT, PUROK 1 AND 3, BARANGAY MALAMIG, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.9M | 100% | High risk69 | —-0.069 |
| 3 | 25CC0185CONSTRUCTION OF DRAINAGE SYSTEM, EMEL, BARANGAY SUBIC, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱9.6M | 0% | High risk69 | —-0.016 |
| 4 | 24CG0012FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF ERODED BANK ALONG PAMPANGA RIVER, BARANGAY CANSINALA, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱73.3M | 100% | Medium risk35 | —-0.090 |