Opening the dossier…
Opening the dossier…
Contractor dossier
120 projects on file, including joint ventures this contractor is part of.
Total projects
120
Total budget
₱12.2B
Average progress
79.3%
Completion rate
45.8%
Below 70%
Average risk score
60.0
High risk on average, out of 100
Flagged as unusual
22
18.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 38 | ₱3.4B | 60.7 | 7 | 97.4% |
| National Capital Region | 36 | ₱3.4B | 62.7 | 2 | 60.9% |
| Region IV-B | 29 | ₱4.6B | 59.0 | 12 | 74.0% |
| Region II | 9 | ₱649.9M | 51.6 | 0 | 100.0% |
| Region IV-A | 5 | ₱84.1M | 59.7 | 1 | 55.8% |
| Region III | 2 | ₱70.5M | 68.9 | 0 | 95.8% |
| Region XII | 1 | ₱49.6M | 29.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 69 | ₱8.1B | 59.7 | 13 | 85.6% |
| Roads | 33 | ₱2.5B | 52.3 | 0 | 69.5% |
| OTHER | 5 | ₱578.8M | 79.1 | 5 | 93.7% |
| Bridges | 5 | ₱548.1M | 63.5 | 1 | 43.6% |
| GAA 2025 OO-1 | 4 | ₱287.9M | 93.5 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱40.3M | 44.7 | 1 | 78.0% |
| GAA 2025 SSP | 1 | ₱9.6M | 94.4 | 1 | 62.1% |
| GAA 2025 OO-2 | 1 | ₱236.3M | 87.0 | 1 | 7.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0088RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-MALIBAY BR. NB ALONG EPIFANIO DELOS SANTOS AVE (EDSA) | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk94 | —-0.013 |
| 25DN0086CONSTRUCTION OF ROAD, DOÑA AURORA STREET, BARANGAY POBLACION IBABA, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 25OH0078RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - UNITED NATION BR.1 ALONG UNITED NATION AVE. | National Capital Region | South Manila DEO | On-Going | ₱95.5M | 100% | High risk94 | —-0.013 |
| 25OH0095RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LAURA BR. (B01328LZ) ALONG LAURA ST | National Capital Region | South Manila DEO | On-Going | ₱48.5M | 100% | High risk93 | —-0.022 |
| 25OH0094RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-SAN ANDRES BR. ALONG SN ANDRES ST. | National Capital Region | South Manila DEO | On-Going | ₱48.5M | 100% | High risk93 | —-0.022 |
| 25OA0095REHABILITATION (COMPLETION) OF BANGKULASI PUMPING STATION, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱236.3M | 7% | High risk87 | Flagged0.025 |
| 24AE0103SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY SAGAYAD - BARANGAY SEVILLA, STA. 0+000 - STA. 0+347.6, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.6M | 93% | High risk81 | Flagged0.020 |
| 24AH0141CONSTRUCTION OF RIVER PROTECTION, BRGY. BUER, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 92% | High risk79 | Flagged0.013 |
| 24AE0102SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.7M | 88% | High risk79 | Flagged0.024 |
| 24AH0144CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN, BRGY.POBLACION(UPSTREAM),URBIZTONDO,PANGASI | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.009 |
| 24AH0143CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN,BRGY. POBLACION(DOWNSTREAM),URBIZTONDO,PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.008 |
| 23AF0206CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. TUDDINGAN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 25CC0018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINAGBARILAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱37.8M | 92% | High risk69 | —-0.032 |
| 23AF0205CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. AL-ALINAO, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.026 |
| 25E00024CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 30% | High risk69 | Flagged0.006 |
| 24E00025BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER (DOWNSTREAM), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱238.3M | 80% | High risk69 | Flagged0.004 |
| 25E00023CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, MOMPONG RIVER,BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.2M | 61% | High risk69 | Flagged0.001 |
| 24CC0481CONSTRUCTION OF AMRIS CALANTIPAY CREEK SLOPE PROTECTION, BALIWAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱32.7M | 100% | High risk68 | —-0.064 |
| 24E00018FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.6M | 73% | High risk68 | Flagged0.006 |
| 24E00024BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱247.5M | 79% | High risk68 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AF0205CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. AL-ALINAO, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.026 |
| 23AF0206CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. TUDDINGAN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 25OA0095REHABILITATION (COMPLETION) OF BANGKULASI PUMPING STATION, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱236.3M | 7% | High risk87 | Flagged0.025 |
| 24AE0102SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.7M | 88% | High risk79 | Flagged0.024 |
| 24AE0103SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY SAGAYAD - BARANGAY SEVILLA, STA. 0+000 - STA. 0+347.6, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.6M | 93% | High risk81 | Flagged0.020 |
| 24AH0141CONSTRUCTION OF RIVER PROTECTION, BRGY. BUER, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 92% | High risk79 | Flagged0.013 |
| 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 24AH0144CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN, BRGY.POBLACION(UPSTREAM),URBIZTONDO,PANGASI | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.009 |
| 24AH0143CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN,BRGY. POBLACION(DOWNSTREAM),URBIZTONDO,PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.008 |
| 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 25DN0086CONSTRUCTION OF ROAD, DOÑA AURORA STREET, BARANGAY POBLACION IBABA, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 24E00018FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.6M | 73% | High risk68 | Flagged0.006 |
| 25E00024CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 30% | High risk69 | Flagged0.006 |
| 25OB0459RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MARIKINA BR. (B01866LZ) ALONG A BONIFACIO AVE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱144.9M | 0% | High risk66 | Flagged0.006 |
| 24E00024BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱247.5M | 79% | High risk68 | Flagged0.005 |
| 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 25E00011CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 43% | High risk68 | Flagged0.005 |
| 25E00010CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 42% | High risk68 | Flagged0.005 |
| 23E00120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱207.5M | 85% | High risk66 | Flagged0.004 |
| 23E00119SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱200.1M | 90% | High risk67 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 27 | 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 28 | 25OH0081CONSTRUCTION OF BOOSTER PUMPING STATION ALONG ESTERO DE PANDACAN, PACKAGE 1B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱143.2M | 0% | High risk68 | —-0.012 |
| 29 | 25OH0080CONSTRUCTION OF BOOSTER PUMPING STATION ALONG ESTERO DE PANDACAN, PACKAGE 1A, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱143M | 0% | High risk68 | —-0.012 |
| 30 | 22O00044CONSTRUCTION OF DRAINAGE ALONG SUMULONG HIGHWAY INCLUDING LATERALS, MARIKINA CITY (PHASE II) | National Capital Region | National Capital Region | On-Going | ₱164M | 83% | High risk67 | —-0.012 |
| 31 | 22O00043CONSTRUCTION OF DRAINAGE ALONG SUMULONG HIGHWAY INCLUDING LATERALS, MARIKINA CITY (PHASE I) | National Capital Region | National Capital Region | Completed | ₱183.3M | 100% | High risk67 | —-0.048 |
| 32 | 25OH0125RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES -QUEZON BRIDGE (B03195LZ) ALONG QUEZON BLVD., MANILA | National Capital Region | South Manila DEO | On-Going | ₱141.6M | 53% | High risk67 | —-0.012 |
| 33 | 23E00119SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱200.1M | 90% | High risk67 | Flagged0.004 |
| 34 | 23E00031SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱217.1M | 100% | High risk67 | —-0.038 |
| 35 | 25E00027CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG MAMARA RIVER (UPSTREAM), BRGY. TUBILI, PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱177.9M | 66% | High risk67 | —-0.005 |
| 36 | 25OB0459RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MARIKINA BR. (B01866LZ) ALONG A BONIFACIO AVE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱144.9M | 0% | High risk66 | Flagged0.006 |
| 37 | 25DN0095CONSTRUCTION OF ACCESS ROADS TO MARIKINA - VICTORIA VALLEY - ANTIPOLO RD (MARIKINA - VICTORIA VALLEY - ANTIPOLO RD EXIT - ANTIPOLO HOTEL), BARANGAY DELA PAZ AND BARANGAY STA. CRUZ, ANTIPOLO CITY (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱42.8M | 3% | High risk66 | —-0.020 |
| 38 | 25DN0085REHABILITATION OF ROAD, BARANGAY KALAYAAN, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 14% | High risk66 | —-0.021 |
| 39 | 23E00120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱207.5M | 85% | High risk66 | Flagged0.004 |
| 40 | 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 41 | 25OH0099RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - ADRIATICO BR. (B02290LZ) ALONG M ADRIATICO | National Capital Region | South Manila DEO | On-Going | ₱95.5M | 55% | High risk64 | —-0.020 |
| 42 | 25OH0129RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - SAN GREGORIO BR. ALONG SN GREGORIO ST. | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 51% | High risk64 | —-0.019 |
| 43 | 24AI0151CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG VIRAY RIVER, PACKAGE B, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱95.2M | 91% | High risk64 | —-0.023 |
| 44 | 24AI0150CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG VIRAY RIVER, PACKAGE A, TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱95.2M | 91% | High risk64 | —-0.024 |
| 45 | 25E00231SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR A-BRGY. MELGAR B, STA. 000+760-STA. 001+191.26, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.1M | 20% | High risk64 | —-0.015 |
| 46 | 23E00040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BONGABONG SORE PROTECTION & CAUSEWAY DEVELOPMENT, BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱120.6M | 100% | High risk63 | —-0.060 |
| 47 | 25E00093COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, BRGY. SAN ANTONIO SECTION, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 66% | High risk63 | —-0.024 |
| 48 | 24AI0149CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BANILA RIVER, UMINGAN-BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.061 |
| 49 | 22BF0072ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (SINAIT SECTION), QUIRINO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.054 |
| 50 | 24AF0094SIPAG-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST. OF SHORE PROTECTION WORKS, BRGY. URAYONG, BAUANG, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.055 |