Opening the dossier…
Opening the dossier…
Contractor dossier
120 projects on file, including joint ventures this contractor is part of.
Total projects
120
Total budget
₱12.2B
Average progress
79.3%
Completion rate
45.8%
Below 70%
Average risk score
60.0
High risk on average, out of 100
Flagged as unusual
22
18.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 38 | ₱3.4B | 60.7 | 7 | 97.4% |
| National Capital Region | 36 | ₱3.4B | 62.7 | 2 | 60.9% |
| Region IV-B | 29 | ₱4.6B | 59.0 | 12 | 74.0% |
| Region II | 9 | ₱649.9M | 51.6 | 0 | 100.0% |
| Region IV-A | 5 | ₱84.1M | 59.7 | 1 | 55.8% |
| Region III | 2 | ₱70.5M | 68.9 | 0 | 95.8% |
| Region XII | 1 | ₱49.6M | 29.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 69 | ₱8.1B | 59.7 | 13 | 85.6% |
| Roads | 33 | ₱2.5B | 52.3 | 0 | 69.5% |
| OTHER | 5 | ₱578.8M | 79.1 | 5 | 93.7% |
| Bridges | 5 | ₱548.1M | 63.5 | 1 | 43.6% |
| GAA 2025 OO-1 | 4 | ₱287.9M | 93.5 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱40.3M | 44.7 | 1 | 78.0% |
| GAA 2025 SSP | 1 | ₱9.6M | 94.4 | 1 | 62.1% |
| GAA 2025 OO-2 | 1 | ₱236.3M | 87.0 | 1 | 7.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0088RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-MALIBAY BR. NB ALONG EPIFANIO DELOS SANTOS AVE (EDSA) | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 100% | High risk94 | —-0.013 |
| 25DN0086CONSTRUCTION OF ROAD, DOÑA AURORA STREET, BARANGAY POBLACION IBABA, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 25OH0078RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - UNITED NATION BR.1 ALONG UNITED NATION AVE. | National Capital Region | South Manila DEO | On-Going | ₱95.5M | 100% | High risk94 | —-0.013 |
| 25OH0095RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LAURA BR. (B01328LZ) ALONG LAURA ST | National Capital Region | South Manila DEO | On-Going | ₱48.5M | 100% | High risk93 | —-0.022 |
| 25OH0094RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-SAN ANDRES BR. ALONG SN ANDRES ST. | National Capital Region | South Manila DEO | On-Going | ₱48.5M | 100% | High risk93 | —-0.022 |
| 25OA0095REHABILITATION (COMPLETION) OF BANGKULASI PUMPING STATION, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱236.3M | 7% | High risk87 | Flagged0.025 |
| 24AE0103SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY SAGAYAD - BARANGAY SEVILLA, STA. 0+000 - STA. 0+347.6, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.6M | 93% | High risk81 | Flagged0.020 |
| 24AH0141CONSTRUCTION OF RIVER PROTECTION, BRGY. BUER, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 92% | High risk79 | Flagged0.013 |
| 24AE0102SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.7M | 88% | High risk79 | Flagged0.024 |
| 24AH0144CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN, BRGY.POBLACION(UPSTREAM),URBIZTONDO,PANGASI | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.009 |
| 24AH0143CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN,BRGY. POBLACION(DOWNSTREAM),URBIZTONDO,PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.008 |
| 23AF0206CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. TUDDINGAN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 25CC0018CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINAGBARILAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱37.8M | 92% | High risk69 | —-0.032 |
| 23AF0205CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. AL-ALINAO, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.026 |
| 25E00024CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 30% | High risk69 | Flagged0.006 |
| 24E00025BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER (DOWNSTREAM), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱238.3M | 80% | High risk69 | Flagged0.004 |
| 25E00023CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, MOMPONG RIVER,BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.2M | 61% | High risk69 | Flagged0.001 |
| 24CC0481CONSTRUCTION OF AMRIS CALANTIPAY CREEK SLOPE PROTECTION, BALIWAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱32.7M | 100% | High risk68 | —-0.064 |
| 24E00018FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.6M | 73% | High risk68 | Flagged0.006 |
| 24E00024BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱247.5M | 79% | High risk68 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AF0205CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. AL-ALINAO, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk69 | Flagged0.026 |
| 23AF0206CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAUANG RIVER BASIN, BRGY. TUDDINGAN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 25OA0095REHABILITATION (COMPLETION) OF BANGKULASI PUMPING STATION, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱236.3M | 7% | High risk87 | Flagged0.025 |
| 24AE0102SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY BUGBUGCAO -BARANGAY PACPACAC, STA. 1+331.60 - STA. 1+980, SAN JUAN, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.7M | 88% | High risk79 | Flagged0.024 |
| 24AE0103SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY SAGAYAD - BARANGAY SEVILLA, STA. 0+000 - STA. 0+347.6, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | On-Going | ₱144.6M | 93% | High risk81 | Flagged0.020 |
| 24AH0141CONSTRUCTION OF RIVER PROTECTION, BRGY. BUER, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 92% | High risk79 | Flagged0.013 |
| 25E00064CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276M | 24% | High risk68 | Flagged0.009 |
| 24AH0144CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN, BRGY.POBLACION(UPSTREAM),URBIZTONDO,PANGASI | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.009 |
| 24AH0143CONSTRUCTION OF RIVER PROTECTION ALONG AGNO RIVER BASIN,BRGY. POBLACION(DOWNSTREAM),URBIZTONDO,PANGA | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 98% | High risk79 | Flagged0.008 |
| 25E00065CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱276.1M | 30% | High risk68 | Flagged0.008 |
| 25DN0086CONSTRUCTION OF ROAD, DOÑA AURORA STREET, BARANGAY POBLACION IBABA, ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱9.6M | 62% | High risk94 | Flagged0.007 |
| 24E00018FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.6M | 73% | High risk68 | Flagged0.006 |
| 25E00024CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.3M | 30% | High risk69 | Flagged0.006 |
| 25OB0459RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MARIKINA BR. (B01866LZ) ALONG A BONIFACIO AVE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱144.9M | 0% | High risk66 | Flagged0.006 |
| 24E00024BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱247.5M | 79% | High risk68 | Flagged0.005 |
| 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 25E00011CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.1M | 43% | High risk68 | Flagged0.005 |
| 25E00010CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230M | 42% | High risk68 | Flagged0.005 |
| 23E00120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱207.5M | 85% | High risk66 | Flagged0.004 |
| 23E00119SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱200.1M | 90% | High risk67 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25OH0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM ALONG F. MANALO ST., MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 52% | High risk62 | —-0.049 |
| 52 | 25OH0018CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NAT'L. ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPV'T. OF ROAD & DRAINAGE SYSTEM AT ZONE 60,61,62 | National Capital Region | South Manila DEO | On-Going | ₱95M | 61% | High risk62 | —-0.051 |
| 53 | 25OH0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NAT'L. ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS- FACILITIES- IMPV'T. OF ROAD & DRAINAGE SYSTEM ALONG MANILA | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 83% | High risk62 | —-0.056 |
| 54 | 25OH0175IMPROVEMENT OF ROAD INCLUDING DRAINAGE STRUCTURE ALONG PAZ MENDIOLA ST. (PHASE I), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱94.4M | 0% | High risk62 | —-0.030 |
| 55 | 25OH0085IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM ALONG P. QUIRINO AVE FROM TAFT AVE TO ADRIATICO ST. (WESTBOUND), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 48% | High risk62 | —-0.047 |
| 56 | 25OH0107IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM ALONG P. QUIRINO AVE. FROM ADRIATICO ST. TO TAFT AVE (EASTBOUND), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱95.4M | 52% | High risk62 | —-0.049 |
| 57 | 25OH0073ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHAB./ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - IMPV'T. OF ROAD AND DRAINAGE SYSTEM ALONG F.ARNAIZ ST. FROM TAFT AVE. TO CEMENTINA | National Capital Region | South Manila DEO | On-Going | ₱95.3M | 77% | High risk62 | —-0.056 |
| 58 | 24AH0145CONSTRUCTION OF RIVERBANK PROTECTION ALONG AGNO RIVER BASIN,BRGY.CABAYAOASAN,BUGALLON,PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 94% | High risk61 | —-0.020 |
| 59 | 24AH0142CONSTRUCTION OF RIVER PROTECTION, BRGY. TAMPAC, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱96.5M | 93% | High risk61 | —-0.023 |
| 60 | 24AG0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BANK SLOPE PROTECTION ALONG NAYOM RIVER,STA.007+559.2-STA.008+159.2,BARANGAY MAYA,INFANTA,PANG. | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 61 | 24AF0097CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUC. ALONG BAUANG RIVER BASIN, BAGULIN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.055 |
| 62 | 24AF0096CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUC. ALONG BAUANG RIVER BASIN, BURGOS, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.055 |
| 63 | 24AF0054CONST/REHAB OF FLOOD MIT. FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN, BRGY. STO ROSARIO WEST, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.056 |
| 64 | 24AF0056CONST/REHAB OF FLOOD MIT. FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUC. ALONG BAUANG RIVER BASIN, BRGY. NATIVIDAD, NAGUILIAN, LU | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.055 |
| 65 | 24AF0055CONST/REHAB OF FLOOD MIT. FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUC. ALONG BAUANG RIVER BASIN, BRGY. CABARITAN SUR, NAGUILIAN, LU | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.058 |
| 66 | 24AF0095CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUC. ALONG BAUANG RIVER BASIN, BAUANG, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.055 |
| 67 | 24AE0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SEAWALL, BRGY. PAGDARAOAN, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.053 |
| 68 | 24AE0090SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SEAWALL, BRGY. ILOCANOS SUR, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.054 |
| 69 | 24AE0089SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SEAWALL, BRGY. ILOCANOS NORTE, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.054 |
| 70 | 24AF0057CONST/REHAB OF FLOOD MIT. FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN, BRGY. SAMARA, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.058 |
| 71 | 24AG0140SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (CALZADA SECTION),STA.026+130-STA.026+560 | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.051 |
| 72 | 24AG0139SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (CALZADA SECTION),STA.025+700-STA.026+130 | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.051 |
| 73 | 24AG0115FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG ALAMINOS RIVER,STA.009+347-STA. 009+886,BARANGAY SAN JOSE,ALAMINOS | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.051 |
| 74 | 24AG0114FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE PROTECTION ALONG ALAMINOS RIVER,STA.008+572.9-008+972.9, BARANGAY CAYUCAY,ALAMINOS CITY, PANG. | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.051 |
| 75 | 24AG0116FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG ALAMINOS RIVER,STA.009+886-STA. 010+425,BARANGAY SAN JOSE,ALAMINOS | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.051 |