Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱17.8B
Average progress
83.3%
Completion rate
52.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
32
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 230 | ₱17B | 57.4 | 28 | 84.2% |
| Region IV-B | 5 | ₱738.7M | 66.8 | 4 | 41.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 137 | ₱7.8B | 52.1 | 5 | 89.2% |
| Flood Control and Drainage | 32 | ₱3B | 58.7 | 1 | 74.2% |
| Buildings and Facilities | 24 | ₱3.1B | 62.2 | 4 | 75.5% |
| OTHER | 16 | ₱2.6B | 84.2 | 15 | 66.7% |
| Bridges | 16 | ₱659.1M | 50.3 | 2 | 87.7% |
| GAA 2025 OO-2 | 4 | ₱317.3M | 92.5 | 1 | 82.0% |
| GAA 2025 OO-1 | 4 | ₱180.7M | 87.8 | 2 | 80.9% |
| GAA 2025 SSP | 1 | ₱49M | 96.1 | 1 | 30.5% |
| Bridges, Roads | 1 | ₱186M | 67.1 | 1 | 17.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 25IA0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1090+747 - K1091+260, K1091+103 - K1091+237, K1092+000 -K1092+580 | Region VIII | Biliran DEO | On-Going | ₱96.1M | 66% | High risk95 | Flagged0.009 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IC0047CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY TACURANGA, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 94% | High risk94 | —-0.007 |
| 25I00163CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.7M | 47% | High risk93 | Flagged0.005 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 25IA0060REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 4, BARANGAY ATIPOLO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 87% | High risk92 | —-0.017 |
| 25IF0013CONSTRUCTION OF SITIO CANTAWAGON FLOOD CONTROL MITIGATION STRUCTURE (UPSTREAM), BRGY. TABGAS, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.021 |
| 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Region VIII | Leyte 4th DEO | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
| 23IC0100CONSTRUCTION OF COVID-19 LIGTAS CENTER AND INFIRMARY HOSPITAL, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 78% | High risk81 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 25E00256SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+000.00-STA. 4+160.00, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.9M | 7% | High risk68 | Flagged0.039 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 25IM0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ROQUE RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.6M | 0% | High risk76 | Flagged0.020 |
| 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 25E00253SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186M | 18% | High risk67 | Flagged0.017 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 22IC0085CONCRETING OF BRGY. SAN ANTONIO FMR PHASE II, BRGY. SAN ANTONIO, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.045 |
| 227 | 25EE0038CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BATO BRIDGE, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱29.9M | 96% | Medium risk42 | —-0.028 |
| 228 | 25I00006ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1015+390 - K1015+474, SOUTHERN LEYTE 2ND LD | Region VIII | Region VIII | On-Going | ₱3.4M | 100% | Low risk25 | —-0.061 |
| 229 | 21IM0001REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PICAS-SN JOSE DZR AIRPORT RD-(S00258LT) CHAINAGE 33-CHAINAGE 85, (S00257LT) K0910+-859-K0910+-813, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱4.1M | 100% | Low risk25 | —-0.093 |
| 230 | 25IM0008PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAGSAYSAY BLVD - K0909 + (-157) - K0909 + (-100), K0910 + 445 - K0910 + 454 | Region VIII | Tacloban City DEO | On-Going | ₱3.9M | 100% | Low risk25 | —-0.063 |
| 231 | 19IM0038REHABILITATION OF ROAD WITH DRAINAGE RJD HOMES, BRGY. 84, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱4.2M | 100% | Low risk25 | —-0.093 |
| 232 | 24I00280ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0906+701 - K0906+729, K0906+914 - K0907+000, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱4.4M | 26% | Low risk24 | —-0.032 |
| 233 | 21IM0002REHABILITATION/MAJOR REPAIR-BARUGUAN BRIDGE (B00019LT) ALONG LEYTE-SAMAR ROAD (VIA GUINTIGUI-AN) | Region VIII | Tacloban City DEO | Completed | ₱3.3M | 100% | Low risk23 | —-0.058 |
| 234 | 24I00409NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00002LT) - K0906 + 941 - K0907 + 010 | Region VIII | Region VIII | On-Going | ₱1.6M | 0% | Low risk22 | —-0.030 |
| 235 | 24IC0056ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - GOVT CTR ROAD NETWORK - (S00227LT) - CHAINAGE 378 - CHAINAGE 432, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱1.1M | 100% | Low risk22 | —-0.089 |