Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱17.8B
Average progress
83.3%
Completion rate
52.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
32
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 230 | ₱17B | 57.4 | 28 | 84.2% |
| Region IV-B | 5 | ₱738.7M | 66.8 | 4 | 41.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 137 | ₱7.8B | 52.1 | 5 | 89.2% |
| Flood Control and Drainage | 32 | ₱3B | 58.7 | 1 | 74.2% |
| Buildings and Facilities | 24 | ₱3.1B | 62.2 | 4 | 75.5% |
| OTHER | 16 | ₱2.6B | 84.2 | 15 | 66.7% |
| Bridges | 16 | ₱659.1M | 50.3 | 2 | 87.7% |
| GAA 2025 OO-2 | 4 | ₱317.3M | 92.5 | 1 | 82.0% |
| GAA 2025 OO-1 | 4 | ₱180.7M | 87.8 | 2 | 80.9% |
| GAA 2025 SSP | 1 | ₱49M | 96.1 | 1 | 30.5% |
| Bridges, Roads | 1 | ₱186M | 67.1 | 1 | 17.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 25IA0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1090+747 - K1091+260, K1091+103 - K1091+237, K1092+000 -K1092+580 | Region VIII | Biliran DEO | On-Going | ₱96.1M | 66% | High risk95 | Flagged0.009 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IC0047CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY TACURANGA, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 94% | High risk94 | —-0.007 |
| 25I00163CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.7M | 47% | High risk93 | Flagged0.005 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 25IA0060REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 4, BARANGAY ATIPOLO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 87% | High risk92 | —-0.017 |
| 25IF0013CONSTRUCTION OF SITIO CANTAWAGON FLOOD CONTROL MITIGATION STRUCTURE (UPSTREAM), BRGY. TABGAS, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.021 |
| 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Region VIII | Leyte 4th DEO | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
| 23IC0100CONSTRUCTION OF COVID-19 LIGTAS CENTER AND INFIRMARY HOSPITAL, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 78% | High risk81 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 25E00256SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+000.00-STA. 4+160.00, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.9M | 7% | High risk68 | Flagged0.039 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 25IM0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ROQUE RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.6M | 0% | High risk76 | Flagged0.020 |
| 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 25E00253SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186M | 18% | High risk67 | Flagged0.017 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25I00159NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0793+000 - K0794+302, K0795+000 - K0796+180, K0797+941 - K0799+767, K0813+600 - K0814+000, K0815+550 - K0816+000, K0818+565 - K0819+000, K0820+044 - K08 | Region VIII | Region VIII | On-Going | ₱220M | 25% | High risk66 | —-0.007 |
| 52 | 24I00064ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD (S00173SM) K0891+(-752) - K0895+285, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱168.8M | 90% | High risk66 | —-0.025 |
| 53 | 24I00092ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0881+000 - K0882+000, K0883+000 - K0885+177, K0885+209 - K0885+521, K0885+553 - K0886+036, K0887+800 | Region VIII | Region VIII | On-Going | ₱146.5M | 85% | High risk66 | —-0.030 |
| 54 | 24I00111ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. BUENAVISTA - LAWAAN - MARABUT RD - K0956+019 - K0957+644, K0957+672 - K0958+291, K0958+316 - K0958+543, K0973+000 - K0975+244, K0975+266 - K0976+000 | Region VIII | Region VIII | On-Going | ₱192.9M | 90% | High risk65 | —-0.021 |
| 55 | 24I00113ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT BUENAVISTA - LAWAAN - MARABUT RD - K0958+543 - K0959+041, K0959+108 - K0961+142, K0961+158 - K0964+150 | Region VIII | Region VIII | On-Going | ₱192.9M | 91% | High risk65 | —-0.021 |
| 56 | 24I00112ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT BUENAVISTA - LAWAAN - MARABUT RD - K0953+424 - K0953+538, K0953+638 - K0956+019, K0970+000 - K0973+000 | Region VIII | Region VIII | On-Going | ₱192.9M | 92% | High risk65 | —-0.021 |
| 57 | 25I00150CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.5M | 12% | High risk65 | —-0.003 |
| 58 | 23IC0116CONSTRUCTION OF BYPASS AND DIVERSION ROADS -SAN MIGUEL-SANTOL-TUNGA ROAD, PACKAGE B, BRGY. BAIRAN, BRGY. CAYARE, AND BRGY. CANAP, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱144.6M | 100% | High risk65 | —-0.075 |
| 59 | 24IC0106CONSTRUCTION OF ALANGALANG BY-PASS ROAD (BRGY. MUDBORON TO BRGY. SAN VICENTE), LEYTE, BRGY. MUDBORON AND BRGY. CAPIZ, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 0% | High risk65 | —-0.006 |
| 60 | 23IC0115CONSTRUCTION OF BYPASS AND DIVERSION ROADS - DAPDAP-ALANGALANG-STA. CRUZ ROAD, PACKAGE A, BRGY. DAPDAP, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.7M | 79% | High risk65 | —-0.027 |
| 61 | 25I00035ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MAINIT - SN MIGUEL - SANTOL RD - K0944+101 - K0945+000, K0945+937 - K0948+811, K0948+850 - K0949+730, K0949+762 - K0951+690 | Region VIII | Region VIII | On-Going | ₱146.3M | 68% | High risk65 | —-0.033 |
| 62 | 24I00101ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0949+288 - K0953+093, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱152.3M | 100% | High risk64 | —-0.075 |
| 63 | 25I00077CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), BARANGAY BAHAY, SAN MIGUEL, LEYTE | Region VIII | Region VIII | On-Going | ₱120.3M | 50% | High risk64 | —-0.017 |
| 64 | 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 65 | 23IF0076CONSTRUCTION OF MISSING LINKS/NEW ROADS - JARO-RUBAS-ORMOC ROAD (ORMOC CITY SIDE), LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱144.6M | 100% | High risk64 | —-0.075 |
| 66 | 24I00152BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (SEAWALL), BARANGAY 01 POBLCACION, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱98.9M | 98% | High risk64 | —-0.028 |
| 67 | 23IM0123CONSTRUCTION OF RETARDING BASINS AT HOUSING PROJECTS, TACLOBAN CTIY | Region VIII | Tacloban City DEO | Completed | ₱101.2M | 100% | High risk64 | —-0.067 |
| 68 | 24I00039NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - JAVIER BY-PASS ROAD, LEYTE | Region VIII | Region VIII | On-Going | ₱175.3M | 96% | High risk64 | —-0.027 |
| 69 | 23I00235SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD CONCRETING OF SAN ANTONIO - CAN-UNTOG ROAD, ORMOC CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 90% | High risk64 | Flagged0.014 |
| 70 | 19I00088CONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, SUBSECTION 4.1B, STA. 1+180.00 - STA. 2+360.00, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱108.1M | 100% | High risk63 | —-0.055 |
| 71 | 25E00252SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD PACKAGE A, STA. 0+000-STA. 2+598, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.6M | 30% | High risk63 | Flagged0.007 |
| 72 | 24IC0061CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL ALONG BINAHAAN RIVER , BRGY. BALUD, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.069 |
| 73 | 22I00084CONSTRUCTION OF THREE STOREY BUILDING, DPWH REGIONAL OFFICE VIII, EQUIPMENT MANAGEMENT DIVISION, BRGY. PAWING, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱57.9M | 100% | High risk62 | —-0.089 |
| 74 | 23IF0083CONSTRUCTION OF LUNDAG FLOOD CONTROL, MERIDA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.070 |
| 75 | 24IF0061CONSTRUCTION OF BENOLHO FLOOD CONTROL STRUCTURE (UPSTREAM), ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.070 |