Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱17.8B
Average progress
83.3%
Completion rate
52.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
32
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 230 | ₱17B | 57.4 | 28 | 84.2% |
| Region IV-B | 5 | ₱738.7M | 66.8 | 4 | 41.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 137 | ₱7.8B | 52.1 | 5 | 89.2% |
| Flood Control and Drainage | 32 | ₱3B | 58.7 | 1 | 74.2% |
| Buildings and Facilities | 24 | ₱3.1B | 62.2 | 4 | 75.5% |
| OTHER | 16 | ₱2.6B | 84.2 | 15 | 66.7% |
| Bridges | 16 | ₱659.1M | 50.3 | 2 | 87.7% |
| GAA 2025 OO-2 | 4 | ₱317.3M | 92.5 | 1 | 82.0% |
| GAA 2025 OO-1 | 4 | ₱180.7M | 87.8 | 2 | 80.9% |
| GAA 2025 SSP | 1 | ₱49M | 96.1 | 1 | 30.5% |
| Bridges, Roads | 1 | ₱186M | 67.1 | 1 | 17.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 25IA0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1090+747 - K1091+260, K1091+103 - K1091+237, K1092+000 -K1092+580 | Region VIII | Biliran DEO | On-Going | ₱96.1M | 66% | High risk95 | Flagged0.009 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IC0047CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY TACURANGA, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 94% | High risk94 | —-0.007 |
| 25I00163CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.7M | 47% | High risk93 | Flagged0.005 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 25IA0060REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 4, BARANGAY ATIPOLO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 87% | High risk92 | —-0.017 |
| 25IF0013CONSTRUCTION OF SITIO CANTAWAGON FLOOD CONTROL MITIGATION STRUCTURE (UPSTREAM), BRGY. TABGAS, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.021 |
| 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Region VIII | Leyte 4th DEO | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
| 23IC0100CONSTRUCTION OF COVID-19 LIGTAS CENTER AND INFIRMARY HOSPITAL, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 78% | High risk81 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 25E00256SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+000.00-STA. 4+160.00, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.9M | 7% | High risk68 | Flagged0.039 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 25IM0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ROQUE RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.6M | 0% | High risk76 | Flagged0.020 |
| 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 25E00253SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186M | 18% | High risk67 | Flagged0.017 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 20I00056NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - JARO - RUBAS - ORMOC ROAD, JARO SIDE, LEYTE | Region VIII | Region VIII | Completed | ₱135M | 100% | High risk61 | —-0.069 |
| 77 | 19I00004ASSET PRESERVATION - PREVENTIVE MAINT. - PRIMARY ROADS, DAANG MAHARLIKA (LT), KO901+1028-KO903+853, KO906+505-KO907+173 (S00002LT), KO908+(-812)-KO908+563 (S00022LT), TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱121.7M | 100% | High risk61 | —-0.081 |
| 78 | 23IK0048PREVENTIVE MAINT. - SECONDARY ROADS (BASEY-MARABUT-PINIMITINAN RD), K0910+100-K0910+750, K0912+530-K0913+000, K0923+335-K0924+000, K0924+000-K0924+701, K0926+K0093-K0927+000, K0928+524-K0929+000, K0930+000-K0930+150, K0931+K0847-K0932+000 | Region VIII | Samar 2nd DEO | Completed | ₱120.6M | 100% | High risk61 | —-0.080 |
| 79 | 23IM0053PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0901+247 - K0901+908, K0904+103 - K0905+416, K0905+472 - K0906+569 | Region VIII | Tacloban City DEO | Completed | ₱118.6M | 100% | High risk61 | —-0.082 |
| 80 | 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 81 | 24I00255ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0941+000 - K0941+506, K0941+522 - K0941+789, K0941+982 - K0941+988, K0943+810 - K0945+000, LEYTE 2ND LD | Region VIII | Region VIII | On-Going | ₱118M | 95% | High risk60 | —-0.043 |
| 82 | 23I00107ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1186+881 - K1189+000, K1194+000 - K1195+810, SOUTHERN LEYTE DEO | Region VIII | Region VIII | Completed | ₱96.4M | 100% | Medium risk60 | —-0.084 |
| 83 | 24IA0063CONSTRUCTION OF TWO-STOREY OFFICE BUILDING, DPWH BILIRAN DEO, DPWH BUREAU OF EQUIPMENT, 8TH RES, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱48.5M | 81% | Medium risk59 | —-0.044 |
| 84 | 24I00008BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION (COMPLETION) OF DPWH REGIONAL OFFICE VIII BUILDING, EQUIPMENT MANAGEMENT DIVISION (EMD), BARANGAY PAWING, PALO, LEYTE (PHASE II), LEYTE 1ST L.D. | Region VIII | Region VIII | On-Going | ₱48.2M | 84% | Medium risk59 | —-0.042 |
| 85 | 23II0031PREVENTIVE MAINTENANCE, SECONDARY ROADS, PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG RD, K0817+000-K0822+872, 2ND DISTRICT, NORTHERN SAMAR | Region VIII | Northern Samar 2nd DEO | Completed | ₱102.1M | 100% | Medium risk59 | —-0.081 |
| 86 | 22IA0053ACCESS ROAD LEADING TO ULAN-ULAN FALLS, SAMPAO, ALMERIA, BILIRAN (11.599085°, 124.403417° - 11.596764°, 124.395092°, 11.607084°, 124.404968° - 11.605999°, 124.398647°) | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk59 | —-0.060 |
| 87 | 24IL0042ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - SECONDARY ROADS - BDRY SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA - K1135+366 - K1135+546, K1136+000 - K1136+784.40, K1136+807 - K1136+1019, K1137+000 - K1137+886, K1138+378 - K1 | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 100% | Medium risk59 | —-0.047 |
| 88 | 24IC0142CONSTRUCTION (COMPLETION) OF MARINA VIII OFFICE BUILDING, GOVERNMENT CENTER, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱46.7M | 76% | Medium risk58 | —-0.050 |
| 89 | 17IC0074REHAB./RECONST. OF NAT'L RDS. W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ALONG PALO-CARIGARA-ORMOC RD.,K0916+900-K0917+001,K0918+554-K0918+704,K0919+257-K0919+282, K0919+710-K0919+810,K0921+464-K0921+514,K0921+538-K0921+558, PALO-STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱56.8M | 100% | Medium risk58 | —-0.058 |
| 90 | 24IF0104CONSTRUCTION OF MULTI-PURPOSE BUILDING, BBQ PLAZA BUILDING, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.5M | 46% | Medium risk58 | —-0.034 |
| 91 | 24IF0015CONSTRUCTION OF MULTI-PURPOSE BUILDING, PLAZA, ORMOC CITY, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱49.4M | 69% | Medium risk58 | —-0.037 |
| 92 | 17IC0070IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG DAANG MAHARLIKA (S00024LT), K0931+509 - K0932+945, K0932+952 - K0933+659, OPONG - SAN ROQUE, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱57.3M | 100% | Medium risk58 | —-0.058 |
| 93 | 17IM0008IMPROVEMENT/WIDENING OF PICAS SAN JOSE DZR AIRPORT ROAD (S000257LT), K0910+(-926) - K0190+(-545), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱14M | 100% | Medium risk57 | —-0.059 |
| 94 | 17IM0006IMPROVEMENT/WIDENING OF DAANG MAHARLIKA ROAD (S00002LT) - KO901+220-KO901+699, KO901+699-K0901+960, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱23M | 100% | Medium risk57 | —-0.060 |
| 95 | 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 96 | 17II0041CONSTRUCTION/UPGRADING/REHAB. OF DRAINAGE ALONG CATARMAN-LAOANG ROAD, K0765+127 - K0766+100.00 AND K0771+380 TO 722+100 (CONST. OF DRAINAGE BOTH SIDES), SAN ROQUE, NORTHERN SAMAR II | Region VIII | Northern Samar 2nd DEO | Completed | ₱38.9M | 100% | Medium risk57 | —-0.054 |
| 97 | 25IF0038ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD., K1127+180 - K1127+373, K1127+401 -K1128+226, K1128+254 - K1128+562 | Region VIII | Leyte 4th DEO | On-Going | ₱89.7M | 100% | Medium risk56 | —-0.055 |
| 98 | 22IC0078ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LT) (S00024LT) K0911+(-118) - K0912+833, BRGY. CAMPETIC, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱85.8M | 100% | Medium risk56 | —-0.085 |
| 99 | 24IM0005PREVENTIVE MAINTENANCE - TERTIARY ROADS - TIGBAO-STA FE-SN MIGUEL RD - K0909 + 000 - K0913 + 1050 | Region VIII | Tacloban City DEO | Completed | ₱74.5M | 100% | Medium risk56 | —-0.090 |
| 100 | 21IM0020CONSTRUCTION OF EVACUATION CENTER, BARANGAY NEW KAWAYAN, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱33.9M | 100% | Medium risk56 | —-0.095 |