Opening the dossier…
Opening the dossier…
Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱17.8B
Average progress
83.3%
Completion rate
52.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
32
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 230 | ₱17B | 57.4 | 28 | 84.2% |
| Region IV-B | 5 | ₱738.7M | 66.8 | 4 | 41.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 137 | ₱7.8B | 52.1 | 5 | 89.2% |
| Flood Control and Drainage | 32 | ₱3B | 58.7 | 1 | 74.2% |
| Buildings and Facilities | 24 | ₱3.1B | 62.2 | 4 | 75.5% |
| OTHER | 16 | ₱2.6B | 84.2 | 15 | 66.7% |
| Bridges | 16 | ₱659.1M | 50.3 | 2 | 87.7% |
| GAA 2025 OO-2 | 4 | ₱317.3M | 92.5 | 1 | 82.0% |
| GAA 2025 OO-1 | 4 | ₱180.7M | 87.8 | 2 | 80.9% |
| GAA 2025 SSP | 1 | ₱49M | 96.1 | 1 | 30.5% |
| Bridges, Roads | 1 | ₱186M | 67.1 | 1 | 17.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 25IA0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1090+747 - K1091+260, K1091+103 - K1091+237, K1092+000 -K1092+580 | Region VIII | Biliran DEO | On-Going | ₱96.1M | 66% | High risk95 | Flagged0.009 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IC0047CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY TACURANGA, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 94% | High risk94 | —-0.007 |
| 25I00163CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.7M | 47% | High risk93 | Flagged0.005 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 25IA0060REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 4, BARANGAY ATIPOLO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 87% | High risk92 | —-0.017 |
| 25IF0013CONSTRUCTION OF SITIO CANTAWAGON FLOOD CONTROL MITIGATION STRUCTURE (UPSTREAM), BRGY. TABGAS, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.021 |
| 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Region VIII | Leyte 4th DEO | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
| 23IC0100CONSTRUCTION OF COVID-19 LIGTAS CENTER AND INFIRMARY HOSPITAL, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 78% | High risk81 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 25E00256SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+000.00-STA. 4+160.00, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.9M | 7% | High risk68 | Flagged0.039 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 25IM0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ROQUE RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.6M | 0% | High risk76 | Flagged0.020 |
| 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 25E00253SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186M | 18% | High risk67 | Flagged0.017 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21IM0056CONSTRUCTION OF MULTI-PURPOSE FACILITIES (VIEWING DECK AND BOARDWALK) NEAR SAN JUANICO BRIDGE, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱19.2M | 100% | Medium risk53 | —-0.096 |
| 127 | 22IA0004NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS BILIRAN CIRCUMFERENTIAL ROAD-K1041+281 -K1042+1060(11.664323°, 124.355587° - 11.678173°, 124.356705°) | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.091 |
| 128 | 22IA0006CONSTRUCTION OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES NRJ AGPANGI CONNECTING TO SITIO PONGON ROAD IN SUPPORT OF THE FOOD AND RESOURCE-BASED PROCESSING, NAVAL, BILIRAN (11.592353, 124.402653 TO 11. | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.095 |
| 129 | 22IC0003ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, PALO - CARIGARA - ORMOC ROAD, K0916+(-809) - K0917+189, BRGY. BURI, , BRGY. CAVITE EAST AND BRGY. ARADO, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk53 | —-0.095 |
| 130 | 24IA0045NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1058+942-K1060+365, K1060+508-K1060+755 | Region VIII | Biliran DEO | On-Going | ₱48.2M | 91% | Medium risk53 | —-0.049 |
| 131 | 21IA0132REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BILIRAN BRIDGE (B00057BR) ALONG LEYTE-BILIRAN RD. BILIRAN PROVINCE | Region VIII | Biliran DEO | Completed | ₱47.3M | 100% | Medium risk53 | —-0.061 |
| 132 | 23IA0102EMERGENCY REPAIR/REHABILITATION OF NAVAL-CAIBIRAN CROSS COUNTRY ROAD, K1041+266 - K1041+426, SO. MACALPE, BRGY. CABIBIHAN, CAIBIRAN, | Region VIII | Biliran DEO | Completed | ₱47.6M | 100% | Medium risk53 | —-0.095 |
| 133 | 25I00023ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K0963+902 - K0964+979, LEYTE 5TH LD | Region VIII | Region VIII | On-Going | ₱52.3M | 100% | Medium risk53 | —-0.060 |
| 134 | 22IC0008ASSET PRESERVATION - CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS, DAANG MAHARLIKA (LT) K0918+601 - K0920+127, PALO AND TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱48M | 100% | Medium risk53 | —-0.095 |
| 135 | 22IA0005IMPROVEMENT OF ACCESS ROAD LEADING TO VILLA CANEJA TO ANISLAGAN ROAD CONNECTING TO ANISLAGAN CERAMICS PRODUCERS ASSOCIATION (ACPA), NAVAL, | Region VIII | Biliran DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.096 |
| 136 | 18IE0064REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY, CALUBIAN JCT.-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD, S00117LT, K1044+711-K1044+828, K1049+286-K1049+400, K1049+742-K1049+883, K1050+000-K1050+123, K1052+686-K105 | Region VIII | Leyte 3rd DEO | Completed | ₱47.5M | 100% | Medium risk53 | —-0.095 |
| 137 | 23ID0037ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-DAANG MAHARLIKA K0941+988-K0943+000,DULAG,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱48.8M | 100% | Medium risk53 | —-0.095 |
| 138 | 23IM0030CONSTRUCTION OF REVETMENT ALONG BARUGU-AN RIVER (DOWNSTREAM), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱55.4M | 100% | Medium risk52 | —-0.078 |
| 139 | 23IC0168CONSTRUCTION OF SAN AGUSTIN - CANGUMBANG FMR, BRGY. SAN AGUSTIN AND BRGY. CANGUMBANG, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱44.7M | 100% | Medium risk52 | —-0.039 |
| 140 | 24IF0007PREVENTIVE MAINTENANCE - PRIMARY ROADS, PALO - CARIGARA - ORMOC ROAD K0990+800 - K0990+996, K1010+000 - K1010+900 | Region VIII | Leyte 4th DEO | Completed | ₱50.7M | 100% | Medium risk52 | —-0.089 |
| 141 | 22IF0023WIDENING OF PERMANENT BRIDGES BINOLHO BR. (B00572LT) ALONG ORMOC - BAYBAY - SOUTHERN LEYTE BRDY ROAD | Region VIII | Leyte 4th DEO | Completed | ₱49.2M | 100% | Medium risk52 | —-0.061 |
| 142 | 23IF0005CONSTRUCTION OF TALISAYAN FLOOD CONTROL, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱55M | 100% | Medium risk50 | —-0.081 |
| 143 | 18IM0034UPGRADING OF DRAINAGE STRUCTURE ALONG ROAD - DAANG MAHARLIKA (LT) K0901+1026-K0902+933, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱45.3M | 100% | Medium risk50 | —-0.096 |
| 144 | 23IC0007ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - LEYTE-SAMAR INTER-PROVL ROAD (S00042LT), K0905+(-256) - K0905+454, BABATNGON, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱34M | 100% | Medium risk50 | —-0.094 |
| 145 | 23IA0020BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- CABADIANGAN BR. (B00060BR) ALONG NAVAL- CAIBIRAN CROSS COUNTRY RD (124.4608333°, 11.5811111° ), BRGY. LUCSOON, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱37.4M | 85% | Medium risk50 | —-0.008 |
| 146 | 23IA0030BRIDGE PROGRAM- REPLACEMENT OF PERMANENT WEAK BRIDGES- ALAWIHAW BR. (B00059BR) ALONG NAVAL- CAIBIRAN CROSS COUNTRY RD. (124.4597222°, 11.57916667°), BRGY. LUCSOON, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱37.4M | 83% | Medium risk50 | —-0.008 |
| 147 | 19IA0132CONSTRUCTION OF NEW PERMANENT BRIDGE-MACALPE BRIDGE ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD (TAKE-OVER OF CONTRACTS FROM 19IA0068) | Region VIII | Biliran DEO | Completed | ₱30.5M | 100% | Medium risk50 | —-0.062 |
| 148 | 20IA0004ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LAND SLIDE -SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROAD, K1046+300 - K1046+1057 | Region VIII | Biliran DEO | Completed | ₱42.5M | 100% | Medium risk50 | —-0.094 |
| 149 | 24I00278ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0904+689 - K0905+007, K0905+984 - K0906+505, K0909+017 - K0909+274, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱45.2M | 86% | Medium risk50 | —-0.052 |
| 150 | 24IM0006CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - APITONG-PATERNO RD - K0908 + (-194) - K0908 + 082, K0908 + (-339) - K0908 + (-194), K0908 + (-811) - K0908 + (-339), K0908 + (-896) - K0908 + (-811), K0908 + 094.... | Region VIII | Tacloban City DEO | On-Going | ₱42.6M | 65% | Medium risk50 | —-0.040 |