Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱17.8B
Average progress
83.3%
Completion rate
52.8%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
32
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 230 | ₱17B | 57.4 | 28 | 84.2% |
| Region IV-B | 5 | ₱738.7M | 66.8 | 4 | 41.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 137 | ₱7.8B | 52.1 | 5 | 89.2% |
| Flood Control and Drainage | 32 | ₱3B | 58.7 | 1 | 74.2% |
| Buildings and Facilities | 24 | ₱3.1B | 62.2 | 4 | 75.5% |
| OTHER | 16 | ₱2.6B | 84.2 | 15 | 66.7% |
| Bridges | 16 | ₱659.1M | 50.3 | 2 | 87.7% |
| GAA 2025 OO-2 | 4 | ₱317.3M | 92.5 | 1 | 82.0% |
| GAA 2025 OO-1 | 4 | ₱180.7M | 87.8 | 2 | 80.9% |
| GAA 2025 SSP | 1 | ₱49M | 96.1 | 1 | 30.5% |
| Bridges, Roads | 1 | ₱186M | 67.1 | 1 | 17.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 25IA0001REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1090+747 - K1091+260, K1091+103 - K1091+237, K1092+000 -K1092+580 | Region VIII | Biliran DEO | On-Going | ₱96.1M | 66% | High risk95 | Flagged0.009 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IC0047CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY TACURANGA, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 94% | High risk94 | —-0.007 |
| 25I00163CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM), RIZAL RIVER, BABATNGON, LEYTE | Region VIII | Region VIII | On-Going | ₱123.7M | 47% | High risk93 | Flagged0.005 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 25IA0060REHABILITATION OF ANAS FLOOD CONTROL STRUCTURE, PHASE 4, BARANGAY ATIPOLO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 87% | High risk92 | —-0.017 |
| 25IF0013CONSTRUCTION OF SITIO CANTAWAGON FLOOD CONTROL MITIGATION STRUCTURE (UPSTREAM), BRGY. TABGAS, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱48.2M | 100% | High risk91 | —-0.021 |
| 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Region VIII | Leyte 4th DEO | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
| 23IC0100CONSTRUCTION OF COVID-19 LIGTAS CENTER AND INFIRMARY HOSPITAL, BRGY. LIBTONG, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱48.9M | 78% | High risk81 | Flagged0.013 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | Region VIII | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | Region VIII | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | Region VIII | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00141CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MOTHER & CHILD AND OUT-PATIENT BUILDING OF SAMAR ISLAND MEDICAL CENTER, CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱385.9M | 59% | High risk84 | Flagged0.044 |
| 24I00091CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL, PHASE III, BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱274M | 60% | High risk83 | Flagged0.042 |
| 23I00192ASSET PRESERVATION - PREVENTIVE MAINTENANCE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD., K1183+000 - K1186+881, SOUTHERN LEYTE LD | Region VIII | Region VIII | On-Going | ₱96.4M | 0% | High risk64 | Flagged0.041 |
| 24I00136NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - TIGBAO - STA. FE - SN MIGUEL RD - K0909+(-172) - KO913+792, K0913+832 - K0914+764, K0905+160 - K0907+000, K0907+209 - K0907+400, K0908+770 - K0908+933, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱318M | 77% | High risk84 | Flagged0.040 |
| 25E00256SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE A, STA. 3+000.00-STA. 4+160.00, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.9M | 7% | High risk68 | Flagged0.039 |
| 23I00131CONSTRUCTION OF NEW BILIRAN PROVINCIAL HOSPITAL BARANGAY LARRAZABAL, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱222.9M | 87% | High risk83 | Flagged0.034 |
| 24I00375BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER), TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱197.9M | 62% | High risk84 | Flagged0.030 |
| 24I00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱163.9M | 90% | High risk84 | Flagged0.025 |
| 25I00193BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (SAMAR ISLAND MEDICAL CENTER BUILDING), CALBAYOG CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱482.2M | 23% | High risk76 | Flagged0.025 |
| 25EG0011CONSTRUCTION OF NEW BRIDGES - BUBUSAWIN BRIDGE, BUBUSAWIN RIVER, ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0066+041.54, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱57.2M | 58% | High risk94 | Flagged0.023 |
| 25IA0155REHABILITATION OF ROAD, BARANGAY ATIPOLO TO BARANGAY CALUMPANG, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱49M | 30% | High risk96 | Flagged0.022 |
| 23IM0122CONSTRUCTION OF 4STY20CL, STO. NINO SPED CENTER, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱59.9M | 47% | High risk61 | Flagged0.021 |
| 25IM0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ROQUE RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.6M | 0% | High risk76 | Flagged0.020 |
| 19I00160BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, CATMON BR. (B00031BR) ALONG BILIRAN CIRCUMFERENTIAL RD., BRGY. CATMON, NAVAL, BILIRAN | Region VIII | Region VIII | On-Going | ₱64.5M | 0% | Medium risk57 | Flagged0.019 |
| 25E00253SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF TAGDAO-ISUGOD DIVERSION ROAD, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱186M | 18% | High risk67 | Flagged0.017 |
| 25IA0003REHABILITATION/ IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, PONDOL FALLS, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱96.1M | 40% | High risk82 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 24IM0025PREVENTIVE MAINTENANCE - TERTIARY ROADS - CAIBAAN RD - K0915 + (-1022) - K0915 + (-671), K0915 + (-1380) - K0915 + (-1022), K0915 + (-671) - K0915 + (-551) | Region VIII | Tacloban City DEO | Completed | ₱11.7M | 100% | Medium risk48 | —-0.091 |
| 202 | 25IM0004PREVENTIVE MAINTENANCE - SECONDARY ROADS - TACLOBAN-BAYBAY SOUTH RD - K0916 + 233 - K0916 + 534 | Region VIII | Tacloban City DEO | Completed | ₱10.5M | 100% | Medium risk48 | —-0.092 |
| 203 | 19IM0047REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TACLOBAN BAYBAY SOUTH ROAD (S00244LT) K0912+1026-K0913+000, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱13.3M | 100% | Medium risk48 | —-0.096 |
| 204 | 24I00274BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - BERNARD REED BR. (B00650LT) ALONG DAANG MAHARLIKA (LT), PALO, LEYTE 1ST DEO | Region VIII | Region VIII | On-Going | ₱9.6M | 100% | Medium risk48 | —-0.026 |
| 205 | 25IF0039RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - TULAY DE PERDON BRIDGE (B00563LT) ALONG ORMOC - BAYBAY - SOUTHERN LEYTE ROAD | Region VIII | Leyte 4th DEO | On-Going | ₱24.5M | 100% | Medium risk48 | —-0.033 |
| 206 | 22ID0045ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE PRIMARY ROADS ,DAANG MAHARLIKA(LT) - K0956+(-417.50)-K 0956 + (-286.50), K 0956+(-225.50)-K0956+204.70, MAC ARTHUR,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱23.4M | 100% | Medium risk48 | —-0.094 |
| 207 | 24IM0032IMPROVEMENT OF ROAD LEADING TO THE DZR AIRPORT, SAN JOSE, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱6.4M | 100% | Medium risk48 | —-0.090 |
| 208 | 24IC0052ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO-CARIGARA-ORMOC ROAD, K0937+231 - K0938 +076, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱26.9M | 100% | Medium risk48 | —-0.095 |
| 209 | 25IF0071RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - BAO BRIDGE (B00184LT) ALONG PALO-CARIGARA-ORMOC ROAD | Region VIII | Leyte 4th DEO | Completed | ₱14.5M | 100% | Medium risk48 | —-0.062 |
| 210 | 25I00002ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1006+1151 - K1007+040, K1007+470 - K1008+235, SOUTHERN LEYTE 2ND LD | Region VIII | Region VIII | On-Going | ₱27.6M | 100% | Medium risk48 | —-0.061 |
| 211 | 25I00015ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K0962+550 - K0963+047, LEYTE 5TH LD | Region VIII | Region VIII | On-Going | ₱24.7M | 100% | Medium risk48 | —-0.061 |
| 212 | 25IM0002PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN JOSE-MANLURIP-MACARTHUR PARK RD - K0914 + 696 - K0914 + 862 | Region VIII | Tacloban City DEO | Completed | ₱7.3M | 100% | Medium risk48 | —-0.090 |
| 213 | 22IC0023CONST./IMPROV. OF ACCESS RDS. LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM RD. INFRA. PROG.-TRIP) GUINDAPUNAN-BARAS RD. LEADING TO MACARTHUR LEYTE LANDING MEMORIAL PARK, BRGY. GUINDAPUNAN, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.095 |
| 214 | 24IF0012ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ORMOC - CADRE BY-PASS (CAMP DOWNES) K1014+(-551) - K1014+000, K1014+(-915) - K1014+(-551), K1014+000 - K1014+125 | Region VIII | Leyte 4th DEO | Completed | ₱24.6M | 100% | Medium risk48 | —-0.095 |
| 215 | 24ID0036NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS,JARO-DAGAMI-BURAUEN-LA PAZ RD. -K0978+542-K0979+308,BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱27.3M | 100% | Medium risk48 | —-0.095 |
| 216 | 25I00022ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K0968+000 - K0968+216, LEYTE 5TH LD | Region VIII | Region VIII | On-Going | ₱11.1M | 100% | Medium risk48 | —-0.062 |
| 217 | 23IG0072ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - ORMOC-BAYBAY-SOUTHERN LEYTE BDRY. RD. K1051+270-K1051+841, K1051+956-K1052+193, K1052+240-K1052+456 | Region VIII | Leyte 5th DEO | Completed | ₱19.1M | 100% | Medium risk47 | —-0.096 |
| 218 | 25I00014ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K0961+530 - K0961+673, LEYTE 5TH LD | Region VIII | Region VIII | On-Going | ₱8.5M | 100% | Medium risk47 | —-0.062 |
| 219 | 23IM0054CONSTRUCTION OF DRAINAGE SYSTEM FROM SAN JOSE ROAD TO PASSENGER TERMINAL, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱39.1M | 66% | Medium risk47 | —-0.014 |
| 220 | 24IC0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO RIVER, BRGY. LIBERTAD, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱41.5M | 100% | Medium risk47 | —-0.081 |
| 221 | 21IM0059CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND RIVERBANK PROTECTION, GUADALUPE 1 & 3, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱33.6M | 100% | Medium risk47 | —-0.080 |
| 222 | 22IF0086REHABILITATION OF SPILLWAY BRGY. CAN-UNTOG, ORMOC CITY | Region VIII | Leyte 4th DEO | Completed | ₱38.6M | 100% | Medium risk46 | —-0.082 |
| 223 | 23ID0019CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANONANG RIVER BASIN, BARANGAY ANONANG,BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱45.1M | 100% | Medium risk46 | —-0.030 |
| 224 | 22IF0002CONSTRUCTION OF TALISAYAN FLOOD CONTROL, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.080 |
| 225 | 24I00266ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0898+604 - K0898+688, TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱4.8M | 87% | Medium risk46 | —-0.052 |