Contractor dossier
242 projects on file, including joint ventures this contractor is part of.
Total projects
242
Total budget
₱8.4B
Average progress
94.9%
Completion rate
86.8%
Average risk score
47.0
Medium risk on average, out of 100
Flagged as unusual
7
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 219 | ₱7.5B | 47.4 | 7 | 94.4% |
| Region II | 9 | ₱120.8M | 45.9 | 0 | 100.0% |
| Region III | 7 | ₱414.2M | 35.5 | 0 | 100.0% |
| National Capital Region | 4 | ₱183M | 53.0 | 0 | 100.0% |
| Region IV-B | 3 | ₱138.8M | 43.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱3.3B | 46.7 | 0 | 94.0% |
| Bridges | 78 | ₱2.6B | 47.9 | 1 | 97.5% |
| Buildings and Facilities | 61 | ₱1.8B | 44.0 | 3 | 93.1% |
| Flood Control and Drainage | 14 | ₱324.7M | 49.4 | 0 | 99.3% |
| Bridges, Roads | 3 | ₱245.3M | 56.9 | 0 | 92.2% |
| OTHER | 2 | ₱122.5M | 76.4 | 2 | 63.7% |
| GAA 2025 SSP | 1 | ₱28.3M | 94.8 | 1 | 82.5% |
| Water Provision and Storage | 1 | ₱1.8M | 18.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0009CONSTRUCTION OF ACCESS ROAD LEADING TO MINOR BASILICA OF ST. DOMINIC DE GUZMAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.3M | 83% | High risk95 | Flagged0.016 |
| 24AH0118REHABILITATION OF REGION 1 MEDICAL CENTER,CENTER FOR HEALTH DEVELOPMENT 1(PHASE 1),ARELLANO ST.,DAGU | Region I | Pangasinan 2nd DEO | On-Going | ₱96M | 66% | High risk79 | Flagged0.018 |
| 24A00388BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, TAYUG, PANGASINAN | Region I | Region I | On-Going | ₱192.1M | 0% | High risk74 | Flagged0.031 |
| 24AJ0024CONSTRUCTION OF NEW BRIDGE - TALOY BR. ALONG VILLASIS-MALASIQUI-SN CARLOS RD, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱26.5M | 62% | High risk73 | Flagged0.015 |
| 18AA0015REHAB/MAJOR REPAIR OF PERM BRIDGES, BACARRA BRIDGE(B00526LZ) ALONG MNR BACARRA IN | Region I | Ilocos Norte 1st DEO | Completed | ₱10.6M | 100% | High risk69 | —-0.046 |
| 17A00008IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD K0183+580 - K0185+150; K0186+782 - K0187+000;K0194+693 - K0195+530 ; K0195+730 - K0196+250; K0199+412 - K0199+972 | Region I | Region I | Completed | ₱106.4M | 100% | High risk69 | —-0.042 |
| 18AA0145REHAB/MAJOR REPAIR OF PERMANENT BRIDGES, DIRIQUE BRIDGE (B00534LZ) ALONG MNR, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱14.5M | 100% | High risk68 | —-0.044 |
| 18AA0062REHAB./MAJOR REPAIR OF PERM BRIDGES, BOLO BRIDGE(B00541LZ) ALONG MNR BANGUI, IN | Region I | Ilocos Norte 1st DEO | Completed | ₱14.1M | 100% | High risk68 | —-0.046 |
| 18AA0001REHAB/MAJOR REPAIR OF PERM BRIDGES PATAPAT VIADUCT BRIDGE(B00547LZ) ALONG MNR, PAGUDPUD, IN | Region I | Ilocos Norte 1st DEO | Completed | ₱44.8M | 100% | High risk67 | —-0.042 |
| 21A00142CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF NEW ADMINISTRATION BUILDING, CAMP LT. TITO B. ABAT, MANAOAG, PANGASINAN | Region I | Region I | Completed | ₱41.4M | 100% | High risk67 | —-0.054 |
| 23A00424REHABILITATION OF BAKIT-BAKIT JCT.- UMINGAN ROAD, K0202+490-K0203+839 | Region I | Region I | Completed | ₱28.9M | 100% | High risk66 | —-0.056 |
| 16AI0267REHAB/RECONST'N/UPGRADING OF DAMAGED PAVED NATL RD INCL DRAINAGE BASED ON PAVEMENT MGMT SYSTEM/HIGHW | Region I | Pangasinan 3rd DEO | Completed | ₱27.8M | 100% | High risk66 | —-0.057 |
| 17AE0056CONSTRUCTION OF DRAINAGE CANAL AT CANAOAY, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 17AJ0044CONSTRUCTION OF PROTECTION WORKS ALONG ANGALACAN RIVER, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.8M | 100% | High risk65 | —-0.046 |
| 17A00019CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WIDENING (1-LANE) OF AMBAYAOAN BRIDGE, ALONG SAN NICOLAS-SAN MANUEL ROAD, PANGASINAN | Region I | Region I | Completed | ₱83M | 100% | High risk64 | —-0.017 |
| 17A00028CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGE TO MORE THAN TWO (2) LANES, TAGAMUSING BRIDGE (B00728LZ) ALONG MANILA NORTH ROAD (PHASE II) | Region I | Region I | Completed | ₱77M | 100% | High risk64 | —-0.022 |
| 25A00279WIDENING OF PERMANENT BRIDGES - DON TEOFILO SISON BR. (B00722LZ) ALONG MANILA NORTH RD (PHASE III) | Region I | Region I | On-Going | ₱88.8M | 0% | High risk64 | Flagged0.030 |
| 19O00025RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MARIKINA BRIDGE (B01866LZ) ALONG A. BONIFACIO AVENUE, MARIKINA CITY | National Capital Region | National Capital Region | Completed | ₱96.5M | 100% | High risk63 | —-0.055 |
| 24AI0262CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 2) TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱97.5M | 16% | High risk62 | —-0.008 |
| 24A00224CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALASIQUI DIVERSION ROAD, MALASIQUI, PANGASINAN | Region I | Region I | On-Going | ₱97.8M | 76% | High risk62 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00388BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, TAYUG, PANGASINAN | Region I | Region I | On-Going | ₱192.1M | 0% | High risk74 | Flagged0.031 |
| 25A00279WIDENING OF PERMANENT BRIDGES - DON TEOFILO SISON BR. (B00722LZ) ALONG MANILA NORTH RD (PHASE III) | Region I | Region I | On-Going | ₱88.8M | 0% | High risk64 | Flagged0.030 |
| 24AH0118REHABILITATION OF REGION 1 MEDICAL CENTER,CENTER FOR HEALTH DEVELOPMENT 1(PHASE 1),ARELLANO ST.,DAGU | Region I | Pangasinan 2nd DEO | On-Going | ₱96M | 66% | High risk79 | Flagged0.018 |
| 25AJ0009CONSTRUCTION OF ACCESS ROAD LEADING TO MINOR BASILICA OF ST. DOMINIC DE GUZMAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.3M | 83% | High risk95 | Flagged0.016 |
| 24AJ0024CONSTRUCTION OF NEW BRIDGE - TALOY BR. ALONG VILLASIS-MALASIQUI-SN CARLOS RD, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱26.5M | 62% | High risk73 | Flagged0.015 |
| 24A00603CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - MALASIQUI SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱11.6M | 31% | Medium risk44 | Flagged0.014 |
| 23AJ0150CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY BOCBOC, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.5M | 85% | Medium risk49 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18ED0047CLUSTER III: 1.) RETROFITTING/ STRENGHTENING OF SAN RAFAEL BRIDGE (B00184MR) ALONG CALAPAN NORTH ROAD, SAN TEODORO, ORIENTAL MINDORO 2.) RETROFITTING/STRENGHTENING OF SUBAAN BRIDGE (B00020MR) ALONG CALAPAN SOUTH ROAD, SOCORRO, ORIENTAL MINDORO 3.) REHABIL | Region IV-B | Mindoro Oriental DEO | Completed | ₱46.9M | 100% | Medium risk45 | —-0.050 |
| 177 | 22AJ0005ROAD WIDENING-SECONDARY ROADS ALONG CARMEN JCT-BAYAMBANG-MANAT RD - K0211+300-K0211+883 | Region I | Pangasinan 4th DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.089 |
| 178 | 18AH0121CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. BOGTONG CENTRO MANGATAREM, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.073 |
| 179 | 19AJ0096ROAD WIDENING ON NATIONAL ROADS ALONG SECONDARY ROAD ALONG VILLASIS-MALASIQUI-SAN CARLOS ROAD, K0.192+729-K0.193+397, K0.194+(-450)-K0.194+242, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱26.7M | 100% | Medium risk44 | —-0.089 |
| 180 | 18AJ0118CONSTRUCTION OF TWO (2) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT BOGTONG E/S, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱18.1M | 100% | Medium risk44 | —-0.042 |
| 181 | 24A00603CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - MALASIQUI SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱11.6M | 31% | Medium risk44 | Flagged0.014 |
| 182 | 18ED0045CLUSTER I: 1.) REHABILITATION/MAJOR REPAIR OF ALAG MALIIT BRIDGE (B00182MR) ALONG CALAPAN NORTH ROAD, BACO, ORIENTAL MINDORO 2.) REHABILITATION/MAJOR REPAIR OF BAGUIN BRIDGE I, BACO, ORIENTAL MINDORO 3.) REHABILITATION/MAJOR REPAIR OF JASMINE BRIDGE (B001 | Region IV-B | Mindoro Oriental DEO | Completed | ₱47.4M | 100% | Medium risk44 | —-0.055 |
| 183 | 19A00090CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, PANDAN AVENUE AND FIRE TREE AVENUE LEADING TO MINOR BASILICA OF OUR LADY OF MANAOAG SHRINE, BRGY NILOMBOT, MAPANDAN PANGASINAN | Region I | Region I | Completed | ₱9.7M | 100% | Medium risk44 | —-0.091 |
| 184 | 21AJ0010ROAD WIDENING ON SECONDARY ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA RD, K0176+374-K0177+256, K0178+052-K0178+280, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱15.7M | 100% | Medium risk44 | —-0.091 |
| 185 | 19A00082LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION AND UPGRADING - BARANGAY ROAD, DALONGUE, STA. BARBARA, PANGASINAN | Region I | Region I | Completed | ₱9.9M | 100% | Medium risk44 | —-0.089 |
| 186 | 18AJ0113CONSTRUCTION OF THREE (3) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING AT PANGALANGAN E/S, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱14.5M | 100% | Medium risk44 | —-0.041 |
| 187 | 20AI0145CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, BINALONAN-ASINGAN-STA. MARIA ROAD KO 190+(-247) - KO 190+011 | Region I | Pangasinan 3rd DEO | Completed | ₱23.3M | 100% | Medium risk43 | —-0.087 |
| 188 | 19AJ0124CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT BUENLAG NHS, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱18.6M | 100% | Medium risk43 | —-0.041 |
| 189 | 18AF0069CONST/UPGRADING/REHAB OF DRAINAGE ALONG NAT RDS, PRIMARY RDS, K0252+200-K0253+304, BAUANG, LU | Region I | La Union 2nd DEO | Completed | ₱17.9M | 100% | Medium risk43 | —-0.086 |
| 190 | 18AI0065CONSTRUCTION/REPAIR/REHAB OF ROADS AT BRGY. PATAQUID, STA. MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.091 |
| 191 | 18AG0186CONSTRUCTION OF STANDARD 4-STOREY 12-CLASSROOM SCHOOL BUILDING AT BOLINAO IS, BOLINAO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱31.1M | 100% | Medium risk42 | —-0.031 |
| 192 | 18ED0046CLUSTER II: 1.) REHABILITATION/MAJOR REPAIR OF MATINING BRIDGE (B00180MR) ALONG CALAPAN NORTH ROAD, BACO, ORIENTAL MINDORO 2.) REHABILITATION/MAJOR REPAIR OF PANGGALAAN BRIDGE (B00005MR) ALONG CALAPAN SOUTH ROAD, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱44.5M | 100% | Medium risk41 | —-0.053 |
| 193 | 19AI0392CONCRETING OF BRGY. ZAMORA, TAYUG-LAGASIT FMR, BRGY. ZAMORA, SAN QUINTIN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.035 |
| 194 | 17AI0402CONSTN OF FOUR STRY TWELVE CL SB (2 SCIENCE LAB, 2 COMP LAB & 4 CL) AT ALEJANDRO F. OLIGAN HIGH SCHO | Region I | Pangasinan 3rd DEO | Completed | ₱32.7M | 100% | Medium risk40 | —-0.012 |
| 195 | 17AI0638CONSTN OF FOUR STRY SIXTEEN CL SB (4 REG WORKSHOP 2 SCIENCE LAB & COMP LAB) AT BALUNGAO NHS, BALUNGA | Region I | Pangasinan 3rd DEO | Completed | ₱39.4M | 100% | Medium risk40 | —-0.011 |
| 196 | 17AI0670CONSTN OF THREE STRY TWELVE CL SB (2 REG WORKSHOP, 2 SCIENCE LAB AND 2 COMP LAB) SAN AURELIO NHS BAL | Region I | Pangasinan 3rd DEO | Completed | ₱30.7M | 100% | Medium risk39 | —-0.014 |
| 197 | 17AI0418CONSTN OF FOUR STRY EIGHT CL SB (2-ICT LAB 2 SCIENCE LAB) AT ARTACHO NHS, SISON, PANG | Region I | Pangasinan 3rd DEO | Completed | ₱18.8M | 100% | Medium risk39 | —-0.016 |
| 198 | 17AI0386CONSTN OF TWO STRY FOUR CL SB (ON MICROPILE) AT LAOAC NHS, LAOAC, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱11.6M | 100% | Medium risk39 | —-0.020 |
| 199 | 17AJ0043REPAIR/COMPLETION OF BAYAMBANG DISTRICT HOSPITAL OF OPD BUILDING, CONSTRUCTION OF HOSPITAL WASTE WATER TREATMENT FACILITY BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱8M | 100% | Medium risk38 | —-0.022 |
| 200 | 17AI0617CONSTN OF TWO STRY EIGHT CL SB BALUNGAO CENTRAL E/S, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱18.2M | 100% | Medium risk38 | —-0.018 |