Opening the dossier…
Opening the dossier…
Contractor dossier
242 projects on file, including joint ventures this contractor is part of.
Total projects
242
Total budget
₱8.4B
Average progress
94.9%
Completion rate
86.8%
Average risk score
47.0
Medium risk on average, out of 100
Flagged as unusual
7
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 219 | ₱7.5B | 47.4 | 7 | 94.4% |
| Region II | 9 | ₱120.8M | 45.9 | 0 | 100.0% |
| Region III | 7 | ₱414.2M | 35.5 | 0 | 100.0% |
| National Capital Region | 4 | ₱183M | 53.0 | 0 | 100.0% |
| Region IV-B | 3 | ₱138.8M | 43.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱3.3B | 46.7 | 0 | 94.0% |
| Bridges | 78 | ₱2.6B | 47.9 | 1 | 97.5% |
| Buildings and Facilities | 61 | ₱1.8B | 44.0 | 3 | 93.1% |
| Flood Control and Drainage | 14 | ₱324.7M | 49.4 | 0 | 99.3% |
| Bridges, Roads | 3 | ₱245.3M | 56.9 | 0 | 92.2% |
| OTHER | 2 | ₱122.5M | 76.4 | 2 | 63.7% |
| GAA 2025 SSP | 1 | ₱28.3M | 94.8 | 1 | 82.5% |
| Water Provision and Storage | 1 | ₱1.8M | 18.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AJ0009CONSTRUCTION OF ACCESS ROAD LEADING TO MINOR BASILICA OF ST. DOMINIC DE GUZMAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.3M | 83% | High risk95 | Flagged0.016 |
| 24AH0118REHABILITATION OF REGION 1 MEDICAL CENTER,CENTER FOR HEALTH DEVELOPMENT 1(PHASE 1),ARELLANO ST.,DAGU | Region I | Pangasinan 2nd DEO | On-Going | ₱96M | 66% | High risk79 | Flagged0.018 |
| 24A00388BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, TAYUG, PANGASINAN | Region I | Region I | On-Going | ₱192.1M | 0% | High risk74 | Flagged0.031 |
| 24AJ0024CONSTRUCTION OF NEW BRIDGE - TALOY BR. ALONG VILLASIS-MALASIQUI-SN CARLOS RD, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱26.5M | 62% | High risk73 | Flagged0.015 |
| 18AA0015REHAB/MAJOR REPAIR OF PERM BRIDGES, BACARRA BRIDGE(B00526LZ) ALONG MNR BACARRA IN | Region I | Ilocos Norte 1st DEO | Completed | ₱10.6M | 100% | High risk69 | —-0.046 |
| 17A00008IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD K0183+580 - K0185+150; K0186+782 - K0187+000;K0194+693 - K0195+530 ; K0195+730 - K0196+250; K0199+412 - K0199+972 | Region I | Region I | Completed | ₱106.4M | 100% | High risk69 | —-0.042 |
| 18AA0145REHAB/MAJOR REPAIR OF PERMANENT BRIDGES, DIRIQUE BRIDGE (B00534LZ) ALONG MNR, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱14.5M | 100% | High risk68 | —-0.044 |
| 18AA0062REHAB./MAJOR REPAIR OF PERM BRIDGES, BOLO BRIDGE(B00541LZ) ALONG MNR BANGUI, IN | Region I | Ilocos Norte 1st DEO | Completed | ₱14.1M | 100% | High risk68 | —-0.046 |
| 18AA0001REHAB/MAJOR REPAIR OF PERM BRIDGES PATAPAT VIADUCT BRIDGE(B00547LZ) ALONG MNR, PAGUDPUD, IN | Region I | Ilocos Norte 1st DEO | Completed | ₱44.8M | 100% | High risk67 | —-0.042 |
| 21A00142CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF NEW ADMINISTRATION BUILDING, CAMP LT. TITO B. ABAT, MANAOAG, PANGASINAN | Region I | Region I | Completed | ₱41.4M | 100% | High risk67 | —-0.054 |
| 23A00424REHABILITATION OF BAKIT-BAKIT JCT.- UMINGAN ROAD, K0202+490-K0203+839 | Region I | Region I | Completed | ₱28.9M | 100% | High risk66 | —-0.056 |
| 16AI0267REHAB/RECONST'N/UPGRADING OF DAMAGED PAVED NATL RD INCL DRAINAGE BASED ON PAVEMENT MGMT SYSTEM/HIGHW | Region I | Pangasinan 3rd DEO | Completed | ₱27.8M | 100% | High risk66 | —-0.057 |
| 17AE0056CONSTRUCTION OF DRAINAGE CANAL AT CANAOAY, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 17AJ0044CONSTRUCTION OF PROTECTION WORKS ALONG ANGALACAN RIVER, BRGY. PIAS, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱9.8M | 100% | High risk65 | —-0.046 |
| 17A00019CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-WIDENING (1-LANE) OF AMBAYAOAN BRIDGE, ALONG SAN NICOLAS-SAN MANUEL ROAD, PANGASINAN | Region I | Region I | Completed | ₱83M | 100% | High risk64 | —-0.017 |
| 17A00028CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGE TO MORE THAN TWO (2) LANES, TAGAMUSING BRIDGE (B00728LZ) ALONG MANILA NORTH ROAD (PHASE II) | Region I | Region I | Completed | ₱77M | 100% | High risk64 | —-0.022 |
| 25A00279WIDENING OF PERMANENT BRIDGES - DON TEOFILO SISON BR. (B00722LZ) ALONG MANILA NORTH RD (PHASE III) | Region I | Region I | On-Going | ₱88.8M | 0% | High risk64 | Flagged0.030 |
| 19O00025RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MARIKINA BRIDGE (B01866LZ) ALONG A. BONIFACIO AVENUE, MARIKINA CITY | National Capital Region | National Capital Region | Completed | ₱96.5M | 100% | High risk63 | —-0.055 |
| 24AI0262CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 2) TAYUG, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱97.5M | 16% | High risk62 | —-0.008 |
| 24A00224CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, MALASIQUI DIVERSION ROAD, MALASIQUI, PANGASINAN | Region I | Region I | On-Going | ₱97.8M | 76% | High risk62 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00388BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, TAYUG, PANGASINAN | Region I | Region I | On-Going | ₱192.1M | 0% | High risk74 | Flagged0.031 |
| 25A00279WIDENING OF PERMANENT BRIDGES - DON TEOFILO SISON BR. (B00722LZ) ALONG MANILA NORTH RD (PHASE III) | Region I | Region I | On-Going | ₱88.8M | 0% | High risk64 | Flagged0.030 |
| 24AH0118REHABILITATION OF REGION 1 MEDICAL CENTER,CENTER FOR HEALTH DEVELOPMENT 1(PHASE 1),ARELLANO ST.,DAGU | Region I | Pangasinan 2nd DEO | On-Going | ₱96M | 66% | High risk79 | Flagged0.018 |
| 25AJ0009CONSTRUCTION OF ACCESS ROAD LEADING TO MINOR BASILICA OF ST. DOMINIC DE GUZMAN, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱28.3M | 83% | High risk95 | Flagged0.016 |
| 24AJ0024CONSTRUCTION OF NEW BRIDGE - TALOY BR. ALONG VILLASIS-MALASIQUI-SN CARLOS RD, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱26.5M | 62% | High risk73 | Flagged0.015 |
| 24A00603CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - MALASIQUI SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱11.6M | 31% | Medium risk44 | Flagged0.014 |
| 23AJ0150CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY BOCBOC, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱47.5M | 85% | Medium risk49 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 17AI0652CONSTN OF FOUR STRY EIGHT CL SB (W/ MICROPILE) (1 REG WORKSHOP, 1 SCIENCE LAB, 1 COMP LAB & 2 CL) DA | Region I | Pangasinan 3rd DEO | Completed | ₱21.3M | 100% | Medium risk38 | —-0.014 |
| 202 | 17AI0646CONSTN OF TWO STRY SIX CL SB AT MALICO E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱12.5M | 100% | Medium risk38 | —-0.019 |
| 203 | 17AI0658CONSTN OF TWO STRY FOUR CL SB AT MALICO NHS, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 204 | 17AI0403CONSTN OF TWO STRY FOUR CL SB (W/ MICROPILE) AT STO. TOMAS E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱11.1M | 100% | Medium risk38 | —-0.020 |
| 205 | 17AI0441CONSTN OF TWO STRY FOUR CL SB AT SAN JOSE E/S, SAN NICOLAS, PANG. | Region I | Pangasinan 3rd DEO | Completed | ₱10.5M | 100% | Medium risk38 | —-0.020 |
| 206 | 17AI0371CONSTN OF TWO STRY FOUR CL SB (W/ MICROPILE) CACABUGAOAN E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱11M | 100% | Medium risk38 | —-0.020 |
| 207 | 17AI0650CONSTN O FOUR STRY EIGHT CL SB (1 REG WORKSHOP, 1 SCIENCE LAB, 1 COMP LAB AND 2 CL) SA ISIDRO NHS AT | Region I | Pangasinan 3rd DEO | Completed | ₱18.4M | 100% | Medium risk38 | —-0.017 |
| 208 | 17AJ0102CONSTRUCTION OF ONE (1) STOREY FIVE (5) CLASSROOM SCHOOL BUILDING AT OLEA E/S, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6M | 100% | Medium risk38 | —-0.021 |
| 209 | 17AI0557CONSTN OF TWO STRY FOUR CL SB AT DALUMPINAS E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 210 | 17AI0590CONSTN OF TWO STRY FOUR CL SB SAN ISIDRO E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 211 | 17AI0390CONSTN OF TWO STRY FOUR CL SB AT SAN ROQUE ANP PILOT SCHOOL, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 212 | 17AI0396CONSTN OF TWO STRY FOUR CL SB (W/ MICROPILE) CALAOACAN E/S, SAN NICOLAS, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 213 | 17AI0644CONSTN OF TWO STRY EIGHT CL SB AT DON MONTANO E/S, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱18.3M | 100% | Medium risk38 | —-0.018 |
| 214 | 17AI0387CONSTN OF TWO STRY SIX CL SB (ON MICROPILE) AT CABALITIAN NHS, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱14.8M | 100% | Medium risk37 | —-0.020 |
| 215 | 19CL0011RETROFITTING/STRENGTHENING OF BRIDGE, GABOR BR. (B01395LZ) ALONG OLONGAPO-BUGALLON ROAD, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱77.9M | 100% | Medium risk37 | —-0.052 |
| 216 | 19CL0014CLUSTER IV 1. RETROFITTING/STRENGTHENING OF BRIDGE, BATO BR. (B01446LZ) ALONG AMUNGAN PALAUIG BANLOG ROAD 2. RETROFITTING/STRENGTHENING OF BRIDGE, MARANGLA BR. (B01420LZ) ALONG OLONGAPO-BUGALLON ROAD 3. RETROFITTING/STRENGTHENING OF BRIDGE, STO. RO | Region III | Zambales 1st DEO | Completed | ₱77.9M | 100% | Medium risk37 | —-0.052 |
| 217 | 19CL0006CLUSTER II- 1. RETROFITTING/STRENGTHENING OF BRIDGE, APO-APO BR.(B01404LZ) ALONG OLONGAPO-BUGALLON ROADV2. RETROFITTING/STRENGTHENING OF BRIDGE, KILING BR.(B01405LZ) ALONG OLONGAPO-BUGALLON ROAD) 3.RETROFITTING/STRENGTHENING OF BRIDGE, MALOMA BR.(B01398LZ | Region III | Zambales 1st DEO | Completed | ₱80.9M | 100% | Medium risk37 | —-0.052 |
| 218 | 19CL0019CLUSTER VI-1. RETROFITTING/STRENGTHENING OF BRIDGE, LAWIS BR. (B01426LZ) ALONG OLONGAPO - BUGALLON ROAD, 2. RETROFITTING /STRENGTHENING OF BRIDGE, BALOGANON BR. (B01425LZ) ALONG OLONGAPO-BUGALLON ROAD, 3. RETROFITTING /STRENGTHENING OF BRIDGE, UACON BR | Region III | Zambales 1st DEO | Completed | ₱55.6M | 100% | Medium risk36 | —-0.053 |
| 219 | 24CD0022UPGRADING OF ROAD WITH DRAINAGE CANAL, SANDICO STREET, BARANGAY POBLACION I, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.105 |
| 220 | 18CK0010BRIDGE-RETROFITTING/STRENGTHENING OF PERM. BRIDGES: SAN FRANCISCO BR. ALONG CONCEPCION-CAPAS ROAD, | Region III | Tarlac 2nd DEO | Completed | ₱73.3M | 100% | Medium risk35 | —-0.059 |
| 221 | 17AI0216CONSTN OF BRIDGE, CABALAOANGAN-SAN PEDRO SAN QUINTIN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱3M | 100% | Medium risk32 | —-0.028 |
| 222 | 19CL0001CLUSTER I- 1. RETROFITTING/STRENGTHENING OF BRIDGE, ALUSIIS BR.(B01392LZ) ALONG OLONGAPO-BUGALLON ROAD 2. RETROFITTING/STRENGTHENING OF BRIDGE, BANGAR BR.(B01394LZ) ALONG OLONGAPO-BUGALLON ROAD 3. RETROFITTING/STRENGTHENING OF BRIDGE, STO. TOMAS BR. | Region III | Zambales 1st DEO | Completed | ₱43.6M | 100% | Medium risk31 | —-0.057 |
| 223 | 19AI0273CONSTRUCTION/IMPROVEMENT OF BRIDGES AT UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.3M | 100% | Low risk30 | —-0.051 |
| 224 | 19AJ0067RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-GABON BR. (B00756LZ) ALONG CALASIAO OLD ROAD, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.6M | 100% | Low risk27 | —-0.047 |
| 225 | 23AI0021CONSTRUCTION (COMPLETION) OF DEPARTMENT OF ENERGY, LUZON FIELD OFFICE BUILDING ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4M | 100% | Low risk27 | —-0.086 |